INSP-Final Inspection | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for TCO phase 1 level 1 is complete.
Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in south main entry complete, approved for cover.
|
INSP-Final Inspection | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | CANC |
Jim Page
|
|
|
Inspection was for level 2 TCO phase 1, this request is cancelled.
Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2020 | 3/31/2020 | 3/30/2020 | A | CANC |
Jim Page
|
|
|
Austin Farnworth is the contact for this Overhead Hydro Inspection. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed for area of work, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.
Austin is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|