INSP-Final Inspection | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | FAIL |
Jim Page
|
|
|
Tenting has been altered by other trades in numerous areas, cover is not approved until tenting is corrected.
Tenting inspection, call James if issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | DONE |
Jim Page
|
|
|
Hydrostaic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.
Overhead rough/hydro/tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 | A | FAIL |
Jim Page
|
|
|
Rough in inspection is complete, tenting has been removed by other trades in numerous areas, cover is not approved until tenting is corrected.
|