Letter of compliance/Occupancy | | | 5/1/2019 | | DONE |
|
|
|
|
BLD-Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | A | DONE |
Bob Archibald
|
|
|
All associated permits are finaled.
|
DOC - C/O Approved | | | 4/25/2019 | | DONE |
|
|
|
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Final | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Final | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok for tco
|
FIRE-Conference | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Tyler Phone #: ###-####
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for core and shell only complete, Tenant improvements are under a seperate permit and is currently under construction.
KEITH Phone #: ###-####
|
BLD-Final | 12/28/2018 | 12/28/2018 | 12/31/2018 | P | NR |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Final Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | FAIL |
Jim Page
|
|
|
Exposed combustible material in basement that is no covered by fire sprinklers. Need FIR permits for fire alarm and fire sprinkler finaled before life safety can be completed. Install sheetrock in level 1 elevator lobby, sprinkler head not installed because of no sheetrock. Provide signage for exterior showing which stairwell has roof top access and the one that does not. Still need to test emergency lighting.
Mop sink on level 4 leaked down to level 3 saturating the monitoring modules for the fire alarm system, leak needs to be fixed to prevent false alarms.
Pete Phone #: ###-####
|
FIRE-Final Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety.
Phone #: ###-####
|
Plan Reviewer's activity | | | 12/19/2018 | | DONE |
Jason Blais
|
|
|
BUILDING OFFICIAL AND ASSISTANT FIRE MARSHAL MODIFICATION APPROVAL ATTACHED TO THIS CASE UNDER DOCUMENTS): TYPE OF CONSTRUCTION III-A, HOWEVER, MECHANICAL ROOF WELL AND (2) 1,680 SQ. FT. AREAS ON 2ND & 3RD FLOORS ALLOWED SPRINKLERS FOR SUBSTITUTION FOR GIRDERS & JOISTS, HOWEVER DECK & SUPPORTING COLUMNS WILL BE 1HR. RATED AND SUPPORTING WALLS 2HR. RATED.
|
BLD-Conference | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
Inspection Record Card- Bld | | | 12/11/2018 | | DONE |
|
|
|
|
BLD-Conference | 12/7/2018 | 12/7/2018 | 12/10/2018 | P | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 11/19/2018 | 11/19/2018 | 11/19/2018 | A | DONE |
Jim Page
|
|
|
Signage discussed for pruposed TCO, temporary signage can be used if a TCO is aggress upon, permenant signage needs to be in place for final C of O.
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | CANC |
Jim Page
|
|
|
Request is for a conference, not a final. This request is cancelled.
Tyler Phone #: ###-####
|
BLD-Other | 10/25/2018 | 10/26/2018 | 10/29/2018 | P | PART |
Dave Hannah
|
|
|
Tyler-fire caulking Phone #: ###-####
|
BLD-Wall Bracing | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Dave Hannah
|
|
|
5th fl - Pete Phone #: ###-####
|
BLD-Wall Bracing | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2018 | 9/19/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
5th fl // Pete Phone #: ###-####
|
BLD-Wall Bracing | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PART |
Dave Hannah
|
|
|
framing 5th floor exterior walls // Pete Phone #: ###-#### ok to shear
|
BLD-Wall Bracing | 9/12/2018 | 9/12/2018 | 9/13/2018 | P | CANC |
Dave Hannah
|
|
|
2nd floor exterior shear // Pete Phone #: ###-#### ok to cover ext wall
|
CHANGE STATUS TO (ISS) | | | 9/13/2018 | | DONE |
|
|
|
Plan Mod
|
Inspection Record Card- Bld | | | 9/13/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
4th fl exterior framing - Pete Phone #: ###-####
|
OVERRIDE | | | 9/6/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 8/21/2018 | 8/21/2018 | 9/6/2018 | | PASS |
Carl D Madsen
|
|
|
plan mod
|
Routing - PLAN CHECK | 8/23/2018 | | 9/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2018 | | DONE |
|
|
|
MET
Need Revised Cert of Value from GC for additional value for Plan Mod. DO NOT REISSUE (see emails to and from Tyle McIntyre 9/12/18)
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Dave Hannah
|
|
|
4th fl // Pete Phone #: ###-#### restroom ok and east side parepit
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Dave Hannah
|
|
|
4th, bathroom, roof- Keth Phone #: ###-####
|
Routing - FIRE | 8/23/2018 | 8/23/2018 | 8/24/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Design Review | 8/23/2018 | | 8/24/2018 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 8/21/2018 | | DONE |
|
|
|
Plan Modification application accepted for Extension of 1st floor tenant hallway to capture final tenant configuration as well as new demising walls between ground floor tenants. New tenant storefront with direct access to street will be added that matches previously approved storefront doorways and replaces existing windows.
|
BLD-Framing/Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PART |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### roof framing 1st floor
|
BLD-Framing/Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### third floor restrooms ok and parapet on north side ok
|
BLD-Framing/Rough-in | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### second floor rest rooms ok
|
BLD-Conference | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | DONE |
Dave Hannah
|
|
|
pete Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 6/18/2018 | | DONE |
|
|
|
plan mod so please do not re issued
Need
Cert of Value
hourly fee was paid but still need the rev cert of val for plan mod
|
Plan assigned to (CDM) | 5/2/2018 | 5/2/2018 | 6/16/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod
|
Routing Off Site - STRUCTURAL | 6/2/2018 | | 6/16/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2018 | | DONE |
|
|
|
|
BLD-Conference | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-#### needs engineer field judgement
|
FIRE-Conference | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Pete Phone #: ###-####
|
Routing - PLAN CHECK | 5/2/2018 | | 5/26/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2018 | | 5/26/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 5/2/2018 | | DONE |
|
|
|
Plan Mod application, demolish rectangular opening in 4th floor to provide an opening for a future communicating stair between 3 & 4th floors. Demolish existing column at 3rd floor, and replace it with a new column in a new location and a new beam.
|
CHANGE STATUS TO (ISS) | | | 4/25/2018 | | DONE |
|
|
|
as per Bill V-change status to ISS-contractor is going to finish the job after all-WRONG PERMIT
|
CHANGE STATUS TO (RDY) | | | 4/25/2018 | | DONE |
|
|
|
change status to RDY-i wqas in the wrong permit
|
Telephone call | | | 4/25/2018 | | DONE |
|
|
|
emailed the fees due to Tyler
|
Inspection Record Card- Bld | | | 4/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 2/13/2018 | | 4/24/2018 | | PASS |
Susan Riggs
|
|
|
No Review required per Susan Riggs in Eplan
|
OVERRIDE | | | 4/23/2018 | | |
|
|
|
|
Routing - FIRE | 4/18/2018 | 4/18/2018 | 4/23/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case. Proposed fiire pump was removed from project.
|
Plan assigned to (CDM) | 2/13/2018 | 2/13/2018 | 4/23/2018 | | PASS |
Carl D Madsen
|
|
|
John Alden Building
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/23/2018 | | DONE |
|
|
|
ALL MET-NEED
RP-met
GC FORM-met
REVISED CERT-met
|
Routing Off Site - STRUCTURAL | 4/18/2018 | | 4/21/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/18/2018 | | 4/21/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/12/2018 | | 4/12/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/2/2018 | | 4/12/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 4/2/2018 | | 4/5/2018 | | PASS |
Bill VanDegrift
|
|
|
1) remove P102
2) P303 doesn't have stamp, install per ISPC
|
Routing - MECHANICAL | 4/2/2018 | | 4/4/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/17/2018 | 3/20/2018 | 3/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/13/2018 | | 3/17/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 2/13/2018 | | 3/16/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 2/13/2018 | 2/13/2018 | 2/26/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments to case and emailed architect
|
Routing PW Environmental | 2/13/2018 | | 2/21/2018 | | PASS |
Rick Christenson
|
|
|
Grease Interceptor shown for future use.
|
Routing - Erosion and Sediment | 2/13/2018 | | 2/20/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. Major TI. Need to designate valid ESC Responsible Person for contractor.
|
Routing - MECHANICAL | 2/13/2018 | | 2/15/2018 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 2/13/2018 | | 2/15/2018 | | FAIL |
Bill VanDegrift
|
|
|
1) remove "preliminary" when design is ready for submittal
2) all plumbing plans require a signed engineers stamp.
3) review NFPA 20 for required floor drainage
4) pipe secondary roof drainage to exterior by gravity.ISPC 1101.12.2.2.1
|
Routing PW Solid Waste | 2/13/2018 | | 2/14/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Geothermal | 2/13/2018 | | 2/13/2018 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to geothermal heating district. Contact Public Works if desiring to connect onto system.
|
Intake Approval | | | 2/13/2018 | | PASS |
|
|
|
|
Routing PW Drainage | 2/13/2018 | | 2/13/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 2/13/2018 | | 2/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/13/2018 | | 2/13/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 2/13/2018 | | 2/13/2018 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 1/29/2018 | | FAIL |
|
|
|
|
Application received | | | 12/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 29 2017 9:28AM
|