Permit Information
Permit NumberBLD18-00230
StatusFinaled
Name ESI
Site Address 3266 E BARBER VALLEY DR
Project NameVeranda at Barber Station
Customer NumberBLD17-04133/ FND BLD17-03587
ePlanReview 
Description
(VERANDA AT BARBER STATION Building B) (2 PERMITS IN EPLAN UNDER BLD17-04133) **PROJECT MANAGEMENT - Angie Brosious Permit for the construction of a 37,328 sq. ft. 39 unit assisted living center (foundation and site under BLD17-03587) with work to include the construction of a new wood framed building with all associated interior ans exterior finishes per the approved plans. This building is fully fire sprinklered for area increase and occupancy type. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/22/2019 DONE
Third Notice 6/12/20197/10/2019 DONE
mailed 7-11 with first follow up
First Follow up  7/10/2019 DONE
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10
Second Notice 4/18/20195/6/2019 DONE
mailed 5-10-19
First Notice 3/17/20194/8/2019 DONE
mailed 4-11-19
Zoning Approval3/7/20193/7/20193/7/2019 DONE
DetailsJeff Lowe
KBM signed card but not tidemark. bond is being released
Permanent Occupancy  3/7/2019 DONE
Temporary Occupancy2/27/20195/28/20192/27/2019 DONE
DetailsBrittany Hill
Expire 5/25/19 same as bond
CHANGE STATUS TO (ISS)  2/27/2019 DONE
BLD-Final2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
Scott Phone #: ###-####
DOC - Permit Finaled2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
FIRE-Final Inspection2/22/20192/25/20192/25/2019APASS
DetailsJim Page
Final life fire safety inspection complete.

Scott Phone #: ###-####
PubWorks Occupancy Approval2/1/20192/1/20192/1/2019 DONE
DetailsTiffany Lowery
BLD-Final1/31/20191/31/20191/31/2019PPART
DetailsBrandon Shaw
Temp C of O has been OK'd...
FIRE-Final Inspection1/30/20191/30/20191/30/2019APART
DetailsJim Page
TCO for fire life safety approved per conversation with Ron Johnson for 30 days for vendor/employee training only. Once fire alarm permit is finaled then life fire safety can be signed off as finaled.

Schedule to come at the same time as the Fire Alarm inspection. Thanks Phone #: ###-#### Inspection requested via web by JT Turner
FIRE-Final Inspection1/28/20191/29/20191/29/2019ACANC
DetailsTroy Cobbley
Need the project related FIR permits scheduled and finaled prior to a life safety inspection.

Phone #: ###-#### Inspection requested via web by JT Turner
FIRE-Final Inspection1/28/20191/28/20191/28/2019PFAIL
DetailsJim Page
FIR permits for fire alarm, fire alarm communicator and hood suppression system needs to be completed and finaled before life fire safety inspection can be completed.

Phone #: ###-#### Inspection requested via web by JT Turner
Zoning Approval Temp1/25/20191/25/20191/25/2019 PASS
DetailsKatelyn Menuge
BND19-00025 Landscape
Print Occupancy Form  1/25/2019 DONE
BLD-Framing/Rough-in11/30/201811/30/201811/30/2018PPASS
DetailsBrandon Shaw
Truss repairs in area B inspection.
BLD-Framing/Rough-in11/27/201811/28/201811/28/2018APART
DetailsBrandon Shaw
West side of common areas truss repairs for cover inspection.
BLD-Framing/Rough-in9/28/201810/1/201810/1/2018APART
DetailsBrandon Shaw
Area A Exterior wall inspections for insulation cover.
BLD-Wall cover9/28/20189/28/20189/28/2018PPART
DetailsBrandon Shaw
Area D walls in East Corridors for cover.
BLD-Framing/Rough-in9/11/20189/12/20189/12/2018APART
DetailsBrandon Shaw
Area D corridors- Hat channel and insulation, OK to cover
Print Occupancy Form  9/11/2018 DONE
(F) Reprint permit  9/11/2018 DONE
CHANGE STATUS TO (ISS)  9/11/2018 DONE
Plan assigned to (CDM)8/22/20188/22/20189/7/2018 PASS
DetailsCarl D Madsen
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
Routing - PLAN CHECK9/7/2018 9/7/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/7/2018 DONE
Permit Ready to Issue  9/7/2018 DONE
PLAN MOD (all plan mod fee on BLD17-04133) do not change this permit to ISS without BLD17-04133
Plan Modification Accepted  8/22/2018 DONE
Plan Mod - Adjustments to the mechanical ductwork in the kitchen to accommodate the space provided between the roof trusses and
ceiling.
Also the installation of an underground lift station on the outlet side of the grease interceptor, because of invert elevations
of sanitary sewer piping that were modified because of an electrical conduit bank running through the building.
BLD-Energy code compliance8/21/20188/21/20188/21/2018PPART
DetailsBrandon Shaw
West side of Area D Green board/Fire tape inspection.
BLD-Footing8/20/20188/21/20188/21/2018APASS
DetailsBrandon Shaw
Entry Drive through Canopy footings rebar inspection.
BLD-Framing/Rough-in8/8/20188/9/20188/9/2018APART
DetailsBrandon Shaw
Roof and wall sheathing , building A & B

Exterior only framing, building C& D
OK to insulate
BLD-Framing/Rough-in7/11/20187/11/20187/11/2018PPART
DetailsBrandon Shaw
Roof Sheeting inspection area C.
BLD-Framing/Rough-in7/9/20187/9/20187/9/2018PPART
DetailsBrandon Shaw
Roof strap and nailing inspection. Area D
Exterior and roof, wall bracing, done.
BLD-Framing/Rough-in6/29/20187/3/20187/3/2018APART
DetailsBrandon Shaw
Exterior Sheathing. Assisted Living wing Partial, courtyard C
BLD-Framing/Rough-in6/25/20186/26/20186/26/2018PPART
DetailsBrandon Shaw
BLD D, courtyard- shear nailing
BLD-Framing/Rough-in6/21/20186/22/20186/22/2018APART
DetailsJim Sly
Partial Nailing inspection on exterior plywood for waterproofing cover. North west corner of Assisted living wing. Phone #: ###-#### Inspection requested via web by JT Turner
Ext Shear nailing .....Only. 2/3 section of North wall (East end) and East wall....down to Electrical room.......OK.
Issue PAID IN FULL permit  5/1/2018 DONE
Print Occupancy Form  5/1/2018 DONE
Plan assigned to (CDM)3/13/20183/13/20184/18/2018 PASS
DetailsCarl D Madsen
1st comp Veranda
Routing PW Street Lights3/13/2018 4/18/2018 PASS
DetailsTom Marshall
Routing PW Flood Plain3/13/2018 4/18/2018 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. JCT
Routing - PLAN CHECK4/18/2018 4/18/2018 PASS
DetailsCarl D Madsen
Routing PW Sewer Design4/18/2018 4/18/2018 PASS
DetailsMike Sheppard
PLANS/APPL TAKEN TO FRONT DESK  4/18/2018 DONE
Permit Ready to Issue  4/18/2018 DONE
NEED
ACHD
GC FORM
BLD17-03587 NEEDS TO BE FINAL
**(ESC is attached to BLD17-04133)**
Routing - Erosion and Sediment3/13/2018 4/11/2018 PASS
DetailsAndy J. Long
Route to Impact Fee Review1/22/20181/25/20183/23/2018 PASS
DetailsEric Bilimoria
Routing - PLUMBING3/13/2018 3/19/2018 PASS
DetailsBill VanDegrift
Routing - FIRE3/13/20183/14/20183/14/2018 PASS
DetailsErika Akin
Reviewed under BLD17-04133
Routing Off Site - STRUCTURAL3/13/2018 3/14/2018 PASS
DetailsCarl D Madsen
Routing PW Drainage3/13/2018 3/14/2018 PASS
DetailsBrian McGowan
Routing - Design Review3/13/2018 3/14/2018 FAIL
DetailsKatelyn Menuge
Need landscape modifications to L1.0
Routing - MECHANICAL3/13/2018 3/14/2018 PASS
DetailsTroy James
Routing - Addressing3/13/2018 3/14/2018 PASS
DetailsDoug Chausow
1/25/19: Corrected address.
Routing - PUBLIC WORKS3/13/2018 3/14/2018 PASS
DetailsRachael Beierle
Intake Approval  3/14/2018 PASS
Routing PW Solid Waste3/13/2018 3/14/2018 PASS
DetailsEvan Carpenter
Routing - PLAN CHECK3/13/2018 3/13/2018 PASS
DetailsCarl D Madsen
Routing PW Environmental1/22/2018 2/6/2018 PASS
DetailsRick Christenson
1st review completed  1/22/2018  
Application received 1/22/2018