Third Notice | | 12/9/2019 | 12/5/2019 | | DONE |
|
|
|
This permit finaled on the web by Vince Kouba
|
Third Notice | | 8/18/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19 with third and final follow up letter
|
Third Follow up | | | 9/18/2019 | | DONE |
|
|
|
final
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13 with second follow up
|
Second Follow up | | | 8/13/2019 | | DONE |
|
|
|
|
Third Notice | | 6/12/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11 with first follow up
|
First Follow up | | | 7/10/2019 | | DONE |
|
|
|
|
Third Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Third Notice | | 4/13/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Second Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4/11
|
First Notice | | 3/9/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12-19
|
Zoning Approval | 2/27/2019 | 2/27/2019 | 2/27/2019 | | DONE |
KayCee Babb
|
|
|
Per DRH19-00050
|
Permanent Occupancy | | | 2/27/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2019 | | DONE |
|
|
|
emailed vince@koubahomes.com that the Temp C of O wqas expired and he needs to call final or request an extension
|
Temporary Occupancy | 12/19/2018 | 3/19/2019 | 12/19/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Temporary Occupancy | 12/19/2018 | 2/17/2019 | 12/19/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Zoning Approval Temp | 12/19/2018 | 12/19/2018 | 12/19/2018 | | PART |
KayCee Babb
|
|
|
Temporary approval, 60 days per ANT.
|
Print Occupancy Form | | | 12/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/14/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/14/2018 | | DONE |
|
|
|
NEED A ZOING/LANSCAPE INSPECTION AND NEED SIGN OFF CARD FOR CDHD. PERMIT IS FOR OCCUPANCY AND SHOULDN'T HAVE BEEN DOC FINAL
|
BLD-Final | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Vince Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Vince Phone #: ###-####
|
FIRE-Final Inspection | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | FAIL |
Jim Page
|
|
|
Install emergency egress lighting per city approved drawings, 7 emergency egress lights are missing. Install maximum occupancy placard.
vince Phone #: ###-####
|
FIRE-Final Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | FAIL |
Troy Cobbley
|
|
|
Missing all of the small documents, missing occupant load sign, it appears west exit door can remain locks so the exit sign will need to be removed, plans show emergency lighting in the kitchen, restrooms and restroom corridor, provide fire extinguisher as discussed, provide duct smoke detectors as per the mechanical sheets and the fire alarm sheet, provide full fire alarm notifcation as per the engineered plans, provide clearance at outside patio as shown on the plans
Vince Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Dave Hannah
|
|
|
Vince Phone #: ###-####
|
FIRE-Conference | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
vince Phone #: ###-#### under slab
|
Issue PAID IN FULL permit | | | 7/17/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/17/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/17/2018 | 5/17/2018 | 7/10/2018 | | PASS |
Carl Westfall
|
|
|
* (3rd done) (June 6 - 15 days) (43 sheets) Kiwi Shake N Bake L-3
|
Routing - PLAN CHECK | 7/9/2018 | | 7/10/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 7/10/2018 | | 7/10/2018 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
MET
Need
ACHD-met-no fees or insp req
GC Form
Revised Cert of Value
|
Plan resubmittals received | | | 7/9/2018 | | DONE |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 6/25/2018 | | 7/2/2018 | | PASS |
Carl Westfall
|
|
|
Alternate approval granted
|
Routing Off Site - STRUCTURAL | 6/26/2018 | | 7/2/2018 | | PASS |
Carl Westfall
|
|
|
Jared Bauder (CH2MHill)
|
Plan resubmittals requested | | | 7/2/2018 | | DONE |
|
|
|
|
Routing - Design Review | 6/26/2018 | | 6/26/2018 | | FAIL |
Andrea Tuning
|
|
|
Waiting for sidewalk cafe license
|
Plan resubmittals received | | | 6/25/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/14/2018 | | 6/18/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 6/14/2018 | | 6/18/2018 | | PASS |
Terry Alber
|
|
|
Grease Interceptor location shown. Indicated grease interceptor is 1500-gallon vault located in parking garage.
|
Routing Off Site - STRUCTURAL | 6/14/2018 | | 6/18/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder (CH2MHill)
|
Plan resubmittals requested | | | 6/18/2018 | | DONE |
|
|
|
|
Routing - Design Review | 6/14/2018 | | 6/15/2018 | | FAIL |
Andrea Tuning
|
|
|
Submit a completed sidewalk cafe permit to the DR Division.
|
Routing - PLAN CHECK | 6/13/2018 | | 6/14/2018 | | FAIL |
Carl Westfall
|
|
|
Alternate approval pending. Remember to upload the plan review report.
|
Routing - PLUMBING | 6/14/2018 | | 6/14/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | 6/14/2018 | | 6/14/2018 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 6/11/2018 | 6/14/2018 | 6/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 6/13/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/11/2018 | | DONE |
|
|
|
|
Routing - FIRE | 5/17/2018 | 5/17/2018 | 6/8/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 6/8/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/17/2018 | | 6/6/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder (CH2MHill)
|
Routing - PLAN CHECK | 5/17/2018 | | 6/6/2018 | | FAIL |
Carl Westfall
|
|
|
1st IBC plan review
|
Routing PW Environmental | 5/17/2018 | | 5/24/2018 | | FAIL |
Rick Christenson
|
|
|
Plans must show location and size of grease abatement to which kitchen grease line is connected.
|
Routing - MECHANICAL | 5/17/2018 | | 5/23/2018 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 5/17/2018 | | 5/21/2018 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - PUBLIC WORKS | 5/17/2018 | | 5/18/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 5/17/2018 | | 5/18/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 5/17/2018 | | 5/17/2018 | | PASS |
Doug Chausow
|
|
|
Ste 103
|
Plan Reviewer's activity | | | 5/17/2018 | | DONE |
Carl D Madsen
|
|
|
Walt, please be sure to verify if and ACHD fees are due for this project as it is a first time build-out of the space. If fees are due they can either be paid at the time the plans are picked up or to ACHD prior to issuance of the permit. If the fees have been paid to ACHD a copy of the receipt is required to be provide prior to the issuance of the permit. If no fees are due please provide verification from ACHD prior to the issuance of the permit. Building permits will not be issued prior to verification of fees being paid or that no fees are due.
|
Routing - PLUMBING | 5/17/2018 | | 5/17/2018 | | PASS |
Bill VanDegrift
|
|
|
Individual backflow preventers required for R.P. and Ice machines
|
Intake Approval | | | 5/17/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/16/2018 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 5/10/2018 | | FAIL |
|
|
|
(5-10-18) Please refer to each circled item in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 5/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2018 3:02PM
|