Permit Information
Permit NumberBLD18-01628
StatusFinaled
Name KOUBA HOMES
Site Address 611 S 8TH ST Unit: 103
Project NameKiwi Shake 'N Bake
Customer Number 
ePlanReviewYes
Description
(KIWI SHAKE ‘N BAKE BAR/RESTAURANT – EAST AFTON BUILDING – 1ST STORY – SOUTHEAST CORNER) (DRH18-00077) The fire sprinkler system (NFPA 13 below and above the podium per the “Special Design Standards for Type V Construction” ordinance) is used for story and height increase. To remodel a 1,992 square foot, one story shell space located on the ground story to be used as a bar/restaurant. Work is to include an interior concrete slab on grade floor, replacing existing storefront glazing in 2 locations with 2 new vertical sliding sectional doors, a mechanical and storage mezzanine, two toilet rooms accessible to the disabled, interior decorative awnings, kitchen equipment, a bar, back bar equipment, millwork, and finishes. One new sectional door extends to the floor and the other new sectional door extends to the top of a bar counter with an insulated wall below. Tube steel jambs with steel base plates will extend from the floor to the underside of existing horizontal wind girts and will be welded to the underside of the existing wind girts and be insulated or have a thermal break. The steel jambs and wind girts will be used to support tracks for the vertical sliding sectional doors and to resist out-of-plane lateral loads. Special Inspection is required for welding and for anchors post-installed in hardened concrete. Work related to the new 386 square foot mechanical and storage mezzanine includes metal joists and a gypsum board ceiling, noncombustible floor deck with wood floor finish, bearing walls, and a pull-down ships ladder for access. The mechanical and storage mezzanine is required to be constructed on noncombustible materials. A 510 square foot fenced sidewalk drinking/dining area will also be created. The fence will be 3 feet tall. There is an existing grease trap that was installed under the original permit anticipating a restaurant in this space. A ventless enclosed electric fryer will be installed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/9/201912/5/2019 DONE
This permit finaled on the web by Vince Kouba
Third Notice 8/18/20199/18/2019 DONE
mailed 9-19-19 with third and final follow up letter
Third Follow up  9/18/2019 DONE
final
Third Notice 7/15/20198/13/2019 DONE
mailed 8-13 with second follow up
Second Follow up  8/13/2019 DONE
Third Notice 6/12/20197/10/2019 DONE
mailed 7-11 with first follow up
First Follow up  7/10/2019 DONE
Third Notice 5/11/20196/7/2019 DONE
mailed 6-10
Third Notice 4/13/20195/6/2019 DONE
mailed 5-10-19
Second Notice 3/21/20194/8/2019 DONE
mailed 4/11
First Notice 3/9/20193/11/2019 DONE
mailed 3-12-19
Zoning Approval2/27/20192/27/20192/27/2019 DONE
DetailsKayCee Babb
Per DRH19-00050
Permanent Occupancy  2/27/2019 DONE
Telephone call  2/26/2019 DONE
emailed vince@koubahomes.com that the Temp C of O wqas expired and he needs to call final or request an extension
Temporary Occupancy12/19/20183/19/201912/19/2018 DONE
DetailsTiffany Carson-Herker
Temporary Occupancy12/19/20182/17/201912/19/2018 DONE
DetailsTiffany Carson-Herker
Zoning Approval Temp12/19/201812/19/201812/19/2018 PART
DetailsKayCee Babb
Temporary approval, 60 days per ANT.
Print Occupancy Form  12/19/2018 DONE
Print Occupancy Form  12/14/2018 DONE
CHANGE STATUS TO (ISS)  12/14/2018 DONE
NEED A ZOING/LANSCAPE INSPECTION AND NEED SIGN OFF CARD FOR CDHD. PERMIT IS FOR OCCUPANCY AND SHOULDN'T HAVE BEEN DOC FINAL
BLD-Final12/10/201812/11/201812/11/2018APASS
DetailsBrandon Shaw
Vince Phone #: ###-####
DOC - Permit Finaled12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
FIRE-Final Inspection12/10/201812/10/201812/10/2018PPASS
DetailsJim Page
Previously noted items have been corrected, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.

Vince Phone #: ###-####
FIRE-Final Inspection12/7/201812/7/201812/7/2018PFAIL
DetailsJim Page
Install emergency egress lighting per city approved drawings, 7 emergency egress lights are missing. Install maximum occupancy placard.

vince Phone #: ###-####
FIRE-Final Inspection11/14/201811/14/201811/14/2018PFAIL
DetailsTroy Cobbley
Missing all of the small documents, missing occupant load sign, it appears west exit door can remain locks so the exit sign will need to be removed, plans show emergency lighting in the kitchen, restrooms and restroom corridor, provide fire extinguisher as discussed, provide duct smoke detectors as per the mechanical sheets and the fire alarm sheet, provide full fire alarm notifcation as per the engineered plans, provide clearance at outside patio as shown on the plans

Vince Phone #: ###-####
BLD-Framing/Rough-in8/23/20188/23/20188/23/2018PPASS
DetailsDave Hannah
Vince Phone #: ###-####
FIRE-Conference8/20/20188/20/20188/20/2018ADONE
DetailsJim Page
Fire conference complete
BLD-Energy code compliance7/18/20187/19/20187/19/2018APASS
DetailsDave Hannah
vince Phone #: ###-#### under slab
Issue PAID IN FULL permit  7/17/2018 DONE
Print Occupancy Form  7/17/2018 DONE
Plan assigned to (CJW)5/17/20185/17/20187/10/2018 PASS
DetailsCarl Westfall
* (3rd done) (June 6 - 15 days) (43 sheets) Kiwi Shake N Bake L-3
Routing - PLAN CHECK7/9/2018 7/10/2018 PASS
DetailsCarl Westfall
Routing - Design Review7/10/2018 7/10/2018 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  7/10/2018 DONE
Permit Ready to Issue  7/10/2018 DONE
MET
Need
ACHD-met-no fees or insp req
GC Form
Revised Cert of Value
Plan resubmittals received  7/9/2018 DONE
DetailsCarl Westfall
Routing - PLAN CHECK6/25/2018 7/2/2018 PASS
DetailsCarl Westfall
Alternate approval granted
Routing Off Site - STRUCTURAL6/26/2018 7/2/2018 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Plan resubmittals requested  7/2/2018 DONE
Routing - Design Review6/26/2018 6/26/2018 FAIL
DetailsAndrea Tuning
Waiting for sidewalk cafe license
Plan resubmittals received  6/25/2018 DONE
Routing - MECHANICAL6/14/2018 6/18/2018 PASS
DetailsTroy James
Routing PW Environmental6/14/2018 6/18/2018 PASS
DetailsTerry Alber
Grease Interceptor location shown. Indicated grease interceptor is 1500-gallon vault located in parking garage.
Routing Off Site - STRUCTURAL6/14/2018 6/18/2018 FAIL
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Plan resubmittals requested  6/18/2018 DONE
Routing - Design Review6/14/2018 6/15/2018 FAIL
DetailsAndrea Tuning
Submit a completed sidewalk cafe permit to the DR Division.
Routing - PLAN CHECK6/13/2018 6/14/2018 FAIL
DetailsCarl Westfall
Alternate approval pending. Remember to upload the plan review report.
Routing - PLUMBING6/14/2018 6/14/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - PUBLIC WORKS6/14/2018 6/14/2018 PASS
DetailsRachael Beierle
Route to Impact Fee Review6/11/20186/14/20186/13/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  6/13/2018 DONE
Plan resubmittals requested  6/11/2018 DONE
Routing - FIRE5/17/20185/17/20186/8/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  6/8/2018 DONE
Routing Off Site - STRUCTURAL5/17/2018 6/6/2018 FAIL
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Routing - PLAN CHECK5/17/2018 6/6/2018 FAIL
DetailsCarl Westfall
1st IBC plan review
Routing PW Environmental5/17/2018 5/24/2018 FAIL
DetailsRick Christenson
Plans must show location and size of grease abatement to which kitchen grease line is connected.
Routing - MECHANICAL5/17/2018 5/23/2018 FAIL
DetailsTroy James
Routing - Design Review5/17/2018 5/21/2018 FAIL
DetailsAndrea Tuning
Routing - PUBLIC WORKS5/17/2018 5/18/2018 PASS
DetailsRachael Beierle
Routing - PLANNING5/17/2018 5/18/2018 PASS
DetailsLeon Letson
Routing - Addressing5/17/2018 5/17/2018 PASS
DetailsDoug Chausow
Ste 103
Plan Reviewer's activity  5/17/2018 DONE
DetailsCarl D Madsen
Walt, please be sure to verify if and ACHD fees are due for this project as it is a first time build-out of the space. If fees are due they can either be paid at the time the plans are picked up or to ACHD prior to issuance of the permit. If the fees have been paid to ACHD a copy of the receipt is required to be provide prior to the issuance of the permit. If no fees are due please provide verification from ACHD prior to the issuance of the permit. Building permits will not be issued prior to verification of fees being paid or that no fees are due.
Routing - PLUMBING5/17/2018 5/17/2018 PASS
DetailsBill VanDegrift
Individual backflow preventers required for R.P. and Ice machines
Intake Approval  5/17/2018 PASS
Plan Reviewer's activity  5/16/2018 PASS
Plan intake review approved
Intake Approval  5/10/2018 FAIL
(5-10-18) Please refer to each circled item in the plan intake checklist. Please resolve each item as directed. CJW
Application received  5/8/2018 DONE
Application submitted via PDS Online on May 8 2018 3:02PM