Permit Information
Permit NumberBLD18-02551
StatusFinaled
Name JRM CONSTRUCTION
Site Address 416 S 9TH ST
Project NameThe Knittitng Factory
Customer Number 
ePlanReviewYes
Description
(THE KNITTING FACTORY – NEW OCCUPANCY SCENARIOS) (2-21-19 PLAN MODIFICATION TO REMOVE THE FORMERLY PROPOSED WOMEN’S TOILET ROOM WITHIN THE UPPER BAR AREA FROM THE PROJECT, MAINTAIN THE EXISTING SINGLE USER TOILET ROOM AT THAT LOCATION, MAINTAIN DOOR 104 AND DOOR 106 AT THEIR CURRENT WIDTH ALONG THE PATH OF EGRESS TRAVEL TO THE ALLEY FROM THE LOWER LEVEL, AND TO RETAIN THE ROLL DOWN FIRE DOOR IN AN EXISTING 2-HR FIRE WALL BETWEEN THE UPPER BAR AND THE MEZZANINE.) The fire sprinkler system is used for story increase and for building area increase. To re-establish occupant loads based on approved occupancy scenarios for an events center. The total occupant load will not increase from what was originally approved. Several occupancy scenarios were proposed showing the number of patrons and the number of employees allowed based on the size of the stage, whether chairs are provided, whether chairs and tables are provided, and whether no chairs and no tables are provided. Each approved scenario determines the allowed number of occupants for that scenario so that an overcrowding condition is avoided. The floor plans for all approved scenarios are required to be maintained on site and to be available to the Fire Department upon request. Each event is required to comply with an approved scenario. Work is to include a new side-hinged swinging fire doors to replace a roll-down fire door in a fire wall, a reconfigured bar to improve sight lines and make more area available to patrons, and relocating an existing walk-in cooler. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/24/2019 DONE
JR Contruction will be paying the fees
Third Notice 8/18/20199/2/2019 DONE
This permit finaled on the web by Johnathon McGee
Second Notice 7/20/20198/13/2019 DONE
mailed 8-14
First Notice 7/1/20197/10/2019 DONE
mailed 7-11
BLD-Final6/14/20196/17/20196/24/2019PPASS
DetailsDave Hannah
Rick Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Final6/21/20196/21/20196/21/2019PPASS
DetailsDave Hannah
Rick for JRM Phone #: ###-#### Inspection requested via web by Johnathon McGee
FIRE-Final Inspection6/21/20196/21/20196/21/2019PPASS
DetailsJim Page
Fire alarm inspection has been completed, final life fire safety inspection for scope of work is complete.

Rick for JRM and John Lodman for hawkins Phone #: ###-#### Inspection requested via web by Johnathon McGee
Telephone call  6/21/2019 DONE
called JR but his voice mail is full so called 2nd number on list for JRM-he will get with JR and request the ext on the temp c of o
Permanent Occupancy  6/21/2019 DONE
Permanent Occupancy  6/21/2019 DONE
FIRE-Final Inspection6/14/20196/17/20196/17/2019ACANC
DetailsJim Page
JCI did not request an inspection for the FIR permit associated with this project(FIR19-00078), FIR permits need to be finaled before life fire safety can be completed. Coordinate with JCI for inspection request, this request is cancelled.

John Lodman Hawkins Company Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Foundation5/13/20195/13/20195/13/2019PCANC
DetailsDave Hannah
Temporary Occupancy5/10/20198/8/20195/10/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 60 day extension from 4/20/19
Telephone call  5/7/2019 DONE
called to let know emp c of o will expire on the 10th of May-lef message on ###-#### phone number
Telephone call  4/19/2019 DONE
called JRM to let know the temp C of O will expire tomorrow-he will email Jason Blais to request that extension-Jason Blais gave him the ok to go a few days over the temp c of o date since they are so close to call in a final
Temporary Occupancy3/7/20194/20/20193/7/2019 DONE
DetailsTiffany Carson-Herker
BLD-Final3/5/20193/6/20193/6/2019PPART
DetailsDave Hannah
Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee ok for tco
FIRE-Final Inspection3/5/20193/6/20193/6/2019PPART
DetailsJim Page
Final inspection for life fire safety inspection is complete, a 45 day TCO is approved by Ron Johnson provided the fire alarm work is completed (see fire alarm comments under FIR19-00078) as-builts are submitted, work performed matches city approved drawings and FIR permit for fire alarms is finaled.

Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee
FIRE-Final Inspection3/5/20193/5/20193/5/2019PCANC
DetailsJim Page
Call 30 minutes prior to late afternoon preferred Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
BLD-Final3/1/20193/4/20193/4/2019PCANC
DetailsDave Hannah
Call 30 mins before Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
FIRE-Final Inspection3/4/20193/4/20193/4/2019PCANC
DetailsJim Page
Per conversation with fire alarm contractor, fire alarm system is not ready for inspection. FIR permit for fire alarms needs to be finaled before life fire safety inspection can be completed, this request is cancelled.

jr Phone #: ###-####
BLD-Final2/28/20193/1/20193/1/2019PCANC
DetailsMike Jordan
Call 30 mins ahead of time. Phone #: ###-#### Inspection requested via web by Johnathon McGee
Print Occupancy Form  3/1/2019 DONE
BLD-Framing/Rough-in2/21/20192/22/20192/22/2019PPASS
DetailsDave Hannah
Call 30 mins ahead, framing inspectipn of bar Phone #: ###-#### Inspection requested via web by Johnathon McGee
Plan assigned to (CJW)2/12/20192/12/20192/21/2019 PASS
DetailsCarl Westfall
Plan mod (routed while waiting for revised drawings from the architect to resolve the exiting)
Routing - PLAN CHECK2/13/2019 2/21/2019 PASS
DetailsCarl Westfall
Emailed drawings uploaded and approved
Plan Reviewer's activity  2/21/2019 PASS
1st plan mod approved
Permit Ready to Issue  2/21/2019 DONE
plan mod please do not re issue-
CHANGE STATUS TO (ISS)  2/21/2019 DONE
BLD-Framing/Rough-in2/14/20192/14/20192/15/2019PPASS
DetailsDave Hannah
upper level // JR Phone #: ###-####
Routing PW Sewer Rating2/13/2019 2/14/2019 PASS
DetailsAngela Hardy
Proposed new Women's toilet room removed from the project.
Routing - PLAN CHECK2/12/2019 2/12/2019 PASS
DetailsCarl Westfall
Plan intake review approved
Plan Modification Accepted  2/12/2019 DONE
Print Occupancy Form  1/30/2019 DONE
Issue PAID IN FULL permit  1/30/2019 DONE
Plan assigned to (CJW)8/3/20188/3/20181/29/2019 PASS
DetailsCarl Westfall
(4th done) 08/23/18 (L3 - 15 days) (ePlan - 6 sheets) The Knitting Factory
Routing - PLUMBING1/28/2019 1/29/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
PLANS/APPL TAKEN TO FRONT DESK  1/29/2019 DONE
Permit Ready to Issue  1/29/2019 DONE
need- met
GC
Rev cert of val
Routing - PLAN CHECK1/25/2019 1/28/2019 PASS
DetailsCarl Westfall
Plan resubmittals requested  1/25/2019 DONE
Plan resubmittals received  1/25/2019 DONE
Late on a Friday
Routing - FIRE1/7/2019 1/25/2019 PASS
DetailsErika Akin
Attached comments to case
Routing PW Sewer Rating1/7/2019 1/8/2019 PASS
DetailsMorgan Webb
Lower bar fixtures shown more clearly
Routing - PLUMBING1/7/2019 1/8/2019 FAIL
DetailsDaryl Spivey
Supply info on water heater for bar area as noted on P2.01 note 6.
Routing - PLAN CHECK1/4/2019 1/7/2019 PASS
DetailsCarl Westfall
Plan resubmittals received  1/4/2019 DONE
Plan resubmittals requested  11/19/2018 DONE
Routing - FIRE11/8/2018 11/19/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing Off Site - C.D.H11/8/2018 11/15/2018 PASS
DetailsCarl Westfall
Route to Scott Paradis (###-####) as part of the 2nd review
Routing PW Sewer Rating11/8/2018 11/8/2018 PASS
DetailsAngela Hardy
Toilet added
Routing - PLAN CHECK11/8/2018 11/8/2018 FAIL
DetailsCarl Westfall
Waiting for input from the Fire Department about the occupancy scenarios and whether compliance with 2015 IFC Section 403.2.1 has been achieved.
Routing - PLUMBING11/8/2018 11/8/2018 PASS
DetailsDan Ediger
Toilet added
Per ISPC
Plan resubmittals received  11/8/2018 DONE
Enough accurate information submitted for routing the drawings
Routing - PLAN CHECK10/25/2018 10/26/2018 FAIL
DetailsCarl Westfall
Did not route to other agencies because it was not complete enough for routing. Need occupancy scenarios. Sent back to Architect.
Plan resubmittals requested  10/26/2018 DONE
Plan resubmittals received  10/25/2018 DONE
Route to Impact Fee Review9/13/20189/16/20189/14/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/3/20188/3/20189/13/2018 FAIL
DetailsErika Akin
Attached comment to case
1st review completed  9/13/2018 DONE
Plan resubmittals requested  9/13/2018 DONE
Routing - PLAN CHECK8/3/2018 9/11/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Plan Reviewer's activity  9/10/2018 DONE
Invited Adele for her and Erika to discuss the egress. She wanted to wait until Ron Johnson is back. Perhaps on Wednesday.
Routing - PLUMBING8/3/2018 8/6/2018 PASS
DetailsBill VanDegrift
Per plans and ISPC
Routing - Addressing8/3/2018 8/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/3/2018 8/3/2018 PASS
DetailsMorgan Webb
Intake Approval  8/3/2018 PASS
Intake Approval  7/20/2018 FAIL
DetailsJavier Guzman
Please Provide and upload the following:
• Plan sheets A0.00, A2.10 and A2.11 sized 11” x 17” and are required to be a minimum of 18” x 24” in size, revise and upload in the correct required minimum sheet size
• Plan sheets A.00, A2.10, A2.11, are required to stamped, signed and dated by an Idaho licensed architect and remove the statement “not for construction”
• Provide a wall section detail that shows top and bottom of wall bracing method.
• Provide new interior finishes to the new restroom
• Provide new restroom ceiling details (hard lid or suspended ceiling)
Application received  7/17/2018 DONE
Application submitted via PDS Online on Jul 17 2018 1:30PM