Telephone call | | | 12/24/2019 | | DONE |
|
|
|
JR Contruction will be paying the fees
|
Third Notice | | 8/18/2019 | 9/2/2019 | | DONE |
|
|
|
This permit finaled on the web by Johnathon McGee
|
Second Notice | | 7/20/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-14
|
First Notice | | 7/1/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/14/2019 | 6/17/2019 | 6/24/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
BLD-Final | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Dave Hannah
|
|
|
Rick for JRM Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
FIRE-Final Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Jim Page
|
|
|
Fire alarm inspection has been completed, final life fire safety inspection for scope of work is complete.
Rick for JRM and John Lodman for hawkins Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
Telephone call | | | 6/21/2019 | | DONE |
|
|
|
called JR but his voice mail is full so called 2nd number on list for JRM-he will get with JR and request the ext on the temp c of o
|
Permanent Occupancy | | | 6/21/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/21/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | CANC |
Jim Page
|
|
|
JCI did not request an inspection for the FIR permit associated with this project(FIR19-00078), FIR permits need to be finaled before life fire safety can be completed. Coordinate with JCI for inspection request, this request is cancelled.
John Lodman Hawkins Company Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
BLD-Foundation | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Dave Hannah
|
|
|
|
Temporary Occupancy | 5/10/2019 | 8/8/2019 | 5/10/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 60 day extension from 4/20/19
|
Telephone call | | | 5/7/2019 | | DONE |
|
|
|
called to let know emp c of o will expire on the 10th of May-lef message on ###-#### phone number
|
Telephone call | | | 4/19/2019 | | DONE |
|
|
|
called JRM to let know the temp C of O will expire tomorrow-he will email Jason Blais to request that extension-Jason Blais gave him the ok to go a few days over the temp c of o date since they are so close to call in a final
|
Temporary Occupancy | 3/7/2019 | 4/20/2019 | 3/7/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
BLD-Final | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | PART |
Dave Hannah
|
|
|
Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee ok for tco
|
FIRE-Final Inspection | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | PART |
Jim Page
|
|
|
Final inspection for life fire safety inspection is complete, a 45 day TCO is approved by Ron Johnson provided the fire alarm work is completed (see fire alarm comments under FIR19-00078) as-builts are submitted, work performed matches city approved drawings and FIR permit for fire alarms is finaled.
Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
FIRE-Final Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | CANC |
Jim Page
|
|
|
Call 30 minutes prior to late afternoon preferred Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
|
BLD-Final | 3/1/2019 | 3/4/2019 | 3/4/2019 | P | CANC |
Dave Hannah
|
|
|
Call 30 mins before Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
|
FIRE-Final Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with fire alarm contractor, fire alarm system is not ready for inspection. FIR permit for fire alarms needs to be finaled before life fire safety inspection can be completed, this request is cancelled.
jr Phone #: ###-####
|
BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | CANC |
Mike Jordan
|
|
|
Call 30 mins ahead of time. Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
Print Occupancy Form | | | 3/1/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Dave Hannah
|
|
|
Call 30 mins ahead, framing inspectipn of bar Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
Plan assigned to (CJW) | 2/12/2019 | 2/12/2019 | 2/21/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod (routed while waiting for revised drawings from the architect to resolve the exiting)
|
Routing - PLAN CHECK | 2/13/2019 | | 2/21/2019 | | PASS |
Carl Westfall
|
|
|
Emailed drawings uploaded and approved
|
Plan Reviewer's activity | | | 2/21/2019 | | PASS |
|
|
|
1st plan mod approved
|
Permit Ready to Issue | | | 2/21/2019 | | DONE |
|
|
|
plan mod please do not re issue-
|
CHANGE STATUS TO (ISS) | | | 2/21/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/14/2019 | 2/14/2019 | 2/15/2019 | P | PASS |
Dave Hannah
|
|
|
upper level // JR Phone #: ###-####
|
Routing PW Sewer Rating | 2/13/2019 | | 2/14/2019 | | PASS |
Angela Hardy
|
|
|
Proposed new Women's toilet room removed from the project.
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Plan Modification Accepted | | | 2/12/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/30/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/3/2018 | 8/3/2018 | 1/29/2019 | | PASS |
Carl Westfall
|
|
|
(4th done) 08/23/18 (L3 - 15 days) (ePlan - 6 sheets) The Knitting Factory
|
Routing - PLUMBING | 1/28/2019 | | 1/29/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/29/2019 | | DONE |
|
|
|
need- met
GC
Rev cert of val
|
Routing - PLAN CHECK | 1/25/2019 | | 1/28/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 1/25/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/25/2019 | | DONE |
|
|
|
Late on a Friday
|
Routing - FIRE | 1/7/2019 | | 1/25/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Sewer Rating | 1/7/2019 | | 1/8/2019 | | PASS |
Morgan Webb
|
|
|
Lower bar fixtures shown more clearly
|
Routing - PLUMBING | 1/7/2019 | | 1/8/2019 | | FAIL |
Daryl Spivey
|
|
|
Supply info on water heater for bar area as noted on P2.01 note 6.
|
Routing - PLAN CHECK | 1/4/2019 | | 1/7/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 1/4/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/19/2018 | | DONE |
|
|
|
|
Routing - FIRE | 11/8/2018 | | 11/19/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - C.D.H | 11/8/2018 | | 11/15/2018 | | PASS |
Carl Westfall
|
|
|
Route to Scott Paradis (###-####) as part of the 2nd review
|
Routing PW Sewer Rating | 11/8/2018 | | 11/8/2018 | | PASS |
Angela Hardy
|
|
|
Toilet added
|
Routing - PLAN CHECK | 11/8/2018 | | 11/8/2018 | | FAIL |
Carl Westfall
|
|
|
Waiting for input from the Fire Department about the occupancy scenarios and whether compliance with 2015 IFC Section 403.2.1 has been achieved.
|
Routing - PLUMBING | 11/8/2018 | | 11/8/2018 | | PASS |
Dan Ediger
|
|
|
Toilet added
Per ISPC
|
Plan resubmittals received | | | 11/8/2018 | | DONE |
|
|
|
Enough accurate information submitted for routing the drawings
|
Routing - PLAN CHECK | 10/25/2018 | | 10/26/2018 | | FAIL |
Carl Westfall
|
|
|
Did not route to other agencies because it was not complete enough for routing. Need occupancy scenarios. Sent back to Architect.
|
Plan resubmittals requested | | | 10/26/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/25/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/13/2018 | 9/16/2018 | 9/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/3/2018 | 8/3/2018 | 9/13/2018 | | FAIL |
Erika Akin
|
|
|
Attached comment to case
|
1st review completed | | | 9/13/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/13/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/3/2018 | | 9/11/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Plan Reviewer's activity | | | 9/10/2018 | | DONE |
|
|
|
Invited Adele for her and Erika to discuss the egress. She wanted to wait until Ron Johnson is back. Perhaps on Wednesday.
|
Routing - PLUMBING | 8/3/2018 | | 8/6/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plans and ISPC
|
Routing - Addressing | 8/3/2018 | | 8/3/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/3/2018 | | 8/3/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 8/3/2018 | | PASS |
|
|
|
|
Intake Approval | | | 7/20/2018 | | FAIL |
Javier Guzman
|
|
|
Please Provide and upload the following:
• Plan sheets A0.00, A2.10 and A2.11 sized 11” x 17” and are required to be a minimum of 18” x 24” in size, revise and upload in the correct required minimum sheet size
• Plan sheets A.00, A2.10, A2.11, are required to stamped, signed and dated by an Idaho licensed architect and remove the statement “not for construction”
• Provide a wall section detail that shows top and bottom of wall bracing method.
• Provide new interior finishes to the new restroom
• Provide new restroom ceiling details (hard lid or suspended ceiling)
|
Application received | | | 7/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2018 1:30PM
|