BLD-Aging Inspection | 1/17/2020 | 1/17/2020 | 1/17/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/5/2019 | 9/5/2019 | 9/5/2019 | | PASS |
Jim Storey
|
|
|
Jane Phone #: ###-#### final ok/ lost card
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Jim Storey
|
|
|
Jane Phone #: ###-#### final ok/ lost card
|
FIRE-Final Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinkler modifications, fire alarm inspection is complete, fire extinguisher is placed and will be tagged with a current inspection tag. Final life fire safety inspection for area of work complete.
Jane Phone #: ###-####
|
BLD-Final | 3/25/2019 | 3/26/2019 | 3/26/2019 | P | NR |
Jim Storey
|
|
|
Jane Phone #: ###-####
|
BLD-Final | 3/25/2019 | 3/26/2019 | 3/26/2019 | P | NR |
Jim Page
|
|
|
301 added call before going out .
|
FIRE-Conference | 2/11/2019 | 2/11/2019 | 2/11/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
|
FIRE-Final Inspection | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | CANC |
Jim Page
|
|
|
Inspection request was for a conference, this request is cancelled.
Jane Phone #: ###-####
|
BLD-Final | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | NR |
Jim Storey
|
|
|
Jane 200/75 ceilling and wall coverings// 32 min exit path/ panice hardware double doors/ unlock sign at single.
|
FIRE-Final Inspection | 1/31/2019 | 2/1/2019 | 2/1/2019 | P | FAIL |
Jim Page
|
|
|
Need to have tenant verify that the finishes in art exhibit rooms comply with chapter 7 of the International Fire Code. Fire sprinkler modifications are required for tenant space. Fire alarm modifications are required for tenant space. Any modifications to fire alarm and fire sprinkler system requires a permit. Provide fire extinguisher for proper coverage.
Jane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/26/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/24/2018 | | DONE |
|
|
|
MET
NEED
ACHD
MET
GC FORM
REVISED VALUE
|
Plan assigned to (JG) | 8/16/2018 | 8/16/2018 | 9/22/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 9/03 L3 Gem Center ePlan
|
Routing - PLAN CHECK | 9/17/2018 | | 9/22/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/12/2018 | 9/15/2018 | 9/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/12/2018 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/16/2018 | | 9/12/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/16/2018 | 8/16/2018 | 9/4/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Addressing | 8/16/2018 | | 8/17/2018 | | PASS |
Doug Chausow
|
|
|
Suite 101
|
Routing - PUBLIC WORKS | 8/16/2018 | | 8/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 8/16/2018 | | DONE |
|
|
|
Justin, pleas provide verification of any ACHD fees due as this is a change in occupancy for this space.
|
Intake Approval | | | 8/14/2018 | | PASS |
|
|
|
|
Application received | | | 8/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2018 4:11PM
|