Permit Information
Permit NumberBLD18-03423
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 1111 W JEFFERSON ST
Project NameBoise Plaza Lobby Remodel
Customer Number 
ePlanReviewYes
Description
(BOISE PLAZA LOBBY REMODEL – 1ST STORY) (2-11-18 PLAN MODIFICATION TO CONSTRUCT A CONCIERGE DESK, A COFFEE BAR WITH PENDANT LIGHT, FOUR (4) 24 SQUARE FOOT MEETING PODS WITH OPEN WOOD LATTICE CEILINGS AND WALLS CONSTRUCTED OF CONCEALED FIRE-RETARDANT-TREATED WOOD AND ATTACHED TO THE FLOOR WITH POST-INSTALLED ANCHORS IN HARDENED CONCRETE, AND FOUR (4) INTERIOR DECORATIVE CANOPIES WITH STEEL COLUMNS, BEAMS, AND HANGING DECORATIVE SHAPES. SPECIAL INSPECTION IS REQUIRED FOR WELDING AND FOR POST-INSTALLED ANCHORS IN HARDENED CONCRETE.) The fire sprinkler system is used for high-rise and for the atrium. To remodel the 11,271 square foot 1st story lobby having 4 elevators that give access to other stories. The existing triangular-shaped planters (including trees, other plants, and dirt) will be removed. Portions of the existing upturned concrete beams at the edges of the former planters will be removed to allow for the new configuration. After the remodel, the new floor area of the atrium, not including planters and elevators, will be about 9,510 square feet. Work is to include new concrete slabs over structural foam at former recessed planters; a new raised planter with a waterproofing membrane and adjacent bench seats; new planters flush with the floor having concrete retaining walls with waterproofing membranes, drains, and overflow drains; soil, trees, shrubs, and other plants in new planters; new wood and tile floor finishes; decorative tree-like canopies; wood bench seats with tile finishes at existing upturned concrete beams; galvanized planter pans above existing upturned concrete beams with adjacent wood bench seats; a coffee bar; meeting pods; a reception desk; and interior finishes. Special Inspection is required for concrete, for steel (including welding), and for post-installed anchors in hardened concrete. Deferred submittals include posts and attachments for new interior decorative tree-like canopies, a coffee bar, meeting pods, and a reception desk. The work is required to comply with the approved drawings, with the structural evaluation, with the plan review report, and with all applicable codes and ordinances. The atrium smoke control system is required to be maintained functional as originally approved. Access to at least 2 exits is required to be maintained from the 1st story lobby for the duration of this construction project. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/15/20203/17/2020 DONE
This permit finaled on the web by Justin Dauby
First Notice 2/15/20203/5/2020 DONE
mailed 3-6-20
Telephone call  2/5/2020 DONE
Called and emailed to let them know their occupancy is ready to issue and that we need the inspection card.
Permanent Occupancy  2/5/2020 DONE
BLD-Final1/31/20201/31/20201/31/2020PPASS
DetailsDave Hannah
Erik Phone #: ###-####
FIRE-Final Inspection1/31/20201/31/20201/31/2020PPASS
DetailsJim Page
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Erik Phone #: ###-####
BLD-Framing/Rough-in12/19/201912/20/201912/20/2019APASS
DetailsDave Hannah
Eric Phone #: ###-####
FIRE-Final Inspection10/21/201910/22/201910/22/2019ACANC
DetailsJim Page
Reference noted entered by Troy on 21OCT2019 for life fire safety, this request is cancelled.

Eric Phone #: ###-####
Temporary Occupancy10/22/20191/20/202010/22/2019 DONE
DetailsBrittany Hill
Print Occupancy Form  10/22/2019 DONE
BLD-Final10/21/201910/21/201910/21/2019PPART
DetailsBrandon Shaw
Temp C. of O. is OK'd for coffee bar area only...
FIRE-Final Inspection10/21/201910/21/201910/21/2019PPART
DetailsTroy Cobbley
A temporary for life safety has been approved per Joe Bruce. Still need the project related fire alarm permit issued/finaled prior to a final life safety inspection.

Eric Phone #: ###-####
BLD-Conference9/18/20199/19/20199/19/2019ADONE
DetailsDave Hannah
Eric Phone #: ###-####
FIRE-Conference9/19/20199/19/20199/19/2019ADONE
DetailsJim Page
Fire conference is complete, a fire alarm contractor will need to be contacted, fire alarm notification is required for area of work, currently no notification is in place in lobby remodel.
FIRE-Final Inspection9/18/20199/19/20199/19/2019ACANC
DetailsJim Page
Request was for a conference, this request is cancelled.

Eric Phone #: ###-####
BLD-Framing/Rough-in6/12/20196/12/20196/12/2019PPART
DetailsTony Young
Eric Phone #: ###-####,, plaza west area ok for seating planter framing ok
FIRE-Final Inspection5/29/20195/30/20195/30/2019ACANC
DetailsJim Page
Wrong pemrit called in for fire life safety, this request is cancelled per conversation with point of contact.

Erik Phone #: ###-####
BLD-Framing/Rough-in4/12/20194/12/20194/12/2019PPART
DetailsBrandon Shaw
Southwest corner in ground planter, rebar...
Southeast corner planter boxes, framing...
BLD-Framing/Rough-in3/25/20193/25/20193/25/2019PPART
DetailsTony Young
Eirc Phone #: ###-####,, bench frame on the north/east corner
BLD-Framing/Rough-in3/15/20193/15/20193/18/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Foundation2/11/20192/12/20192/12/2019APART
DetailsTony Young
Eric Phone #: ###-####,, s/e planter slab area
Plan assigned to (CJW)12/20/201812/20/20182/11/2019 PASS
DetailsCarl Westfall
Plan mod - Boise Plaza Lobby Remodel (routed to structural)
Plan Reviewer's activity  2/11/2019 PASS
Plan mod review approved
Permit Ready to Issue  2/11/2019 DONE
Plan mod please do not re issue
Print Occupancy Form  2/11/2019 DONE
CHANGE STATUS TO (ISS)  2/11/2019 DONE
Routing Off Site - STRUCTURAL2/6/2019 2/7/2019 PASS
DetailsCarl Westfall
Howie Henrikson / Jared Bauder (Jacobs)
Routing - PLAN CHECK2/5/2019 2/6/2019 PASS
DetailsCarl Westfall
pending structural
Plan resubmittals received  2/5/2019 DONE
BLD-Foundation2/4/20192/4/20192/4/2019PPART
DetailsBrandon Shaw
Work in progress...
Planter A...
Routing - FIRE1/9/20191/9/20191/25/2019 PASS
DetailsErika Akin
Attached revised comments to case
Routing PW Environmental1/10/2019 1/25/2019 PASS
DetailsTerry Alber
Per BCC10-5-12-3, and relayed via phone conversation (1/25/19) with Sean Drake of Cator Ruma, grease abatement is required for coffee bar.
Plan resubmittals requested  1/25/2019 DONE
BLD-Other1/22/20191/22/20191/22/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-#### fire prof floor pens.
Routing Off Site - STRUCTURAL1/9/2019 1/22/2019 FAIL
DetailsCarl Westfall
Howie Henrikson / Jared Bauder (Jacobs)
BLD-Conference1/9/20191/9/20191/10/2019PPEND
DetailsDave Hannah
Eric Phone #: ###-####
Routing - PLUMBING1/9/2019 1/10/2019 PASS
DetailsDaryl Spivey
See redline notes. Per plan and ISPC
Routing PW Sewer Rating1/9/2019 1/10/2019 PASS
DetailsMorgan Webb
Routing - PLAN CHECK1/7/2019 1/9/2019 PASS
DetailsCarl Westfall
pending structural
Routing Off Site - C.D.H1/7/2019 1/7/2019 PASS
DetailsCarl Westfall
Drawings signed and dated 12-17-18 by CDH submitted on 1-7-19.
Plan Modification Accepted  1/7/2019 DONE
Task in ePlanReview received
Plan Modification Accepted  12/20/2018 DONE
plan mod accepted in e plan-concierge desk, coffee bar, meeting pods & post/canopies-struc cals-assigned to Carl W
Print Occupancy Form  11/8/2018 DONE
Issue PAID IN FULL permit  11/8/2018 DONE
Plan assigned to (CJW)9/20/20189/20/201811/7/2018 PASS
DetailsCarl Westfall
(2nd done) 10/10/18 (L3 - 15 days) (ePlan - 24 sheets) Boise Plaza Lobby Renovation
Plan Reviewer's activity  11/7/2018 DONE
Received stamped and signed structural documents and uploaded them
PLANS/APPL TAKEN TO FRONT DESK  11/7/2018 DONE
Permit Ready to Issue  11/7/2018 DONE
JDAUBY@DAUBYCONST.COM
MET
NEED
GC FORM
REVISED VALUE
Routing Off Site - STRUCTURAL10/24/2018 11/5/2018 PASS
DetailsCarl Westfall
Howie Henrikson / Jared Bauder (Jacobs)
Routing - PLAN CHECK10/23/2018 10/24/2018 PASS
DetailsCarl Westfall
Pending approval by structural
Plan resubmittals received  10/23/2018 DONE
Route to Impact Fee Review10/15/201810/18/201810/16/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals requested  10/15/2018 DONE
Routing - FIRE9/20/20189/20/201810/12/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  10/12/2018 DONE
Routing - PLAN CHECK9/20/2018 10/12/2018 PASS
DetailsCarl Westfall
Pending structural
Routing Off Site - STRUCTURAL9/20/2018 10/5/2018 FAIL
DetailsCarl Westfall
Howie Henrikson / Jared Bauder (Jacobs)
Routing - PLUMBING9/20/2018 9/21/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS9/20/2018 9/21/2018 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/20/2018 9/20/2018 PASS
DetailsMichael Zawacki
Minor TI in non-sensitive area, no ESC needed
Intake Approval  9/20/2018 PASS
DetailsAdele J Schaffeld-Griffin
Joe accepted prescreen, let applicant know this was a major TI.
Routing - Addressing9/20/2018 9/20/2018 PASS
DetailsLaura Hunter
Application received  9/19/2018 DONE
Application submitted via PDS Online on Sep 19 2018 3:22PM