BLD-Final | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Mike Jordan
|
|
|
John- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved.
|
BLD-Blower Door Test Results | 6/19/2019 | 6/19/2019 | 6/19/2019 | A | DONE |
Mike Jordan
|
|
|
4.4
|
BLD-Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Provide R30 insulation in crawl space under floor. Provide the home envelope test results and post. (Blowerdoor). Correction notice posted.
|
BLD-Framing/Rough-in | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Mike Jordan
|
|
|
reinspect and insulation // Shawn
|
BLD-Energy code compliance | 3/26/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Mike Jordan
|
|
|
reinspect and insulation // Shawn
|
BLD-Framing/Rough-in | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PART |
Mike Jordan
|
|
|
Call ahead // Shawn Phone #: ###-####. Ok to insulate. Needs to provide approved fixes for C8,C9 and C10 trusses.
|
BLD-Framing/Rough-in | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | NR |
Mike Jordan
|
|
|
shear // Shawn Phone #: ###-####. Needs to complete airseal pack prior to framing inspection.
|
BLD-Wall Bracing | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Mike Jordan
|
|
|
shear // Shawn Phone #: ###-####. Exterior shear ok. Will check interior OSB and enginnering on framing inspection.
|
BLD-Wall Bracing | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Provide the engineering. Install missed hardware for the drag truss. Install the missed holdowns, HDU5 and DTT2Z, and sheet the walls and nail per the schedule. bedroom #2 should have a portal. Correction notice posted.
|
BLD-Foundation | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Mike Jordan
|
|
|
wall // Nate Phone #: ###-####
|
BLD-Footing | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | CANC |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. footings were covered with concrete blankets. Ground and form work did meet minimum temps for cold weather concrete.
|
Issue PAID IN FULL permit | | | 1/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/14/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 1/2/2019 | 1/2/2019 | 1/14/2019 | | DONE |
Jenny Nelson
|
|
|
01/15 sfd L1 ePlan. 2nd review 1/7, patio beam and calculations don't match, failed planning. 1st Complete 1/3, beam at patio inadequate, waiting for mechanical.
|
Routing - PLANNING | 1/14/2019 | | 1/14/2019 | | PASS |
Sue Cummings
|
|
|
Claified site plan for me.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/14/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 1/11/2019 | | 1/11/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 1/11/2019 | | 1/11/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 1/9/2019 | | 1/9/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 1/7/2019 | | 1/7/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 1/2/2019 | | 1/4/2019 | | FAIL |
Chad Schwendiman
|
|
|
Need to provide a manual J for review
|
1st review completed | | | 1/4/2019 | | FAIL |
Jenny Nelson
|
|
|
Failed planning, mechanical, building
|
Route to Impact Fee Review | 1/2/2019 | 1/5/2019 | 1/3/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 1/2/2019 | | 1/3/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - Addressing | 1/2/2019 | | 1/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/2/2019 | | 1/2/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/2/2019 | | 1/2/2019 | | FAIL |
Sue Cummings
|
|
|
Garage needs to be 20 back from edge of common drive, not property line
|
Plans ACCEPTED BY PLAN TECH | | | 1/2/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/2/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/2/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/28/2018 | | FAIL |
|
|
|
RESCheck has wrong code year, needs to be 2015 IRC; need to upload documents into the document folder
|
Application received | | | 12/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 27 2018 12:57PM
|
Routing - PLANNING | 1/11/2019 | | | | FAIL |
|
|
|
When there is a common drive the garage setback is measured from the common driveway not the property line.
|