Print Statement | | | 8/23/2019 | | DONE |
|
|
|
|
Second Notice | | 7/20/2019 | 8/12/2019 | | DONE |
|
|
|
mailed 8-13
|
First Notice | | 7/6/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Mike Jordan
|
|
|
JIM- Phone #: ###-####. Ok for perm occ.
|
Permanent Occupancy | | | 6/26/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items for fire alarm inspection have been completed and finaled, fire sprinkler inspection is complete, fire extinguishers are placed with current inspection tags. As directed by my supervisor, Adele Schaffeld-Griffin, next tenant improvement for this building will require fire sprinkler protection to be added in mechanical penthouse, no fire sprinkler protection in penthouse as of these inspection notes. Final life fire safety inspection for area of work is complete.
Jim Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/19/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 6/12/2019 | 6/12/2019 | 6/18/2019 | | PASS |
Carl Westfall
|
|
|
plan mod (at permits desk)
|
Routing - PLAN CHECK | 6/17/2019 | | 6/18/2019 | | PASS |
Carl Westfall
|
|
|
Plan intake and plan mod approved
|
Plan Reviewer's activity | | | 6/18/2019 | | PASS |
|
|
|
1st plan mod review approved
|
Permit Ready to Issue | | | 6/18/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan resubmittals received | | | 6/17/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/14/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/14/2019 | | DONE |
|
|
|
Some drawings are still not properly stamped and/or signed.
|
FIRE-Final Inspection | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | CANC |
Jim Page
|
|
|
GC noticed that FIR permit for fire alarms is still under review and not in the issued status, inspection request cancelled per conversation with point of contact, will be rescheduled to coincide with fire alarm perit final, this request is cancelled.
Jim Phone #: ###-####
|
Routing - PLAN CHECK | 6/12/2019 | | 6/13/2019 | | FAIL |
Carl Westfall
|
|
|
The plan mod plan intake failed. See the changemarks on the drawings.
|
Plan resubmittals requested | | | 6/13/2019 | | DONE |
|
|
|
Plan mod plan intake failed
|
BLD-Final | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | CANC |
Dave Hannah
|
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
Plan Modification Accepted | | | 6/12/2019 | | DONE |
|
|
|
Relocation of interior wall along grid line C to align with overhead beam
• Revision to ambulatory stall restrooms
• Relocation of power receptacles off brick office walls
• Revision to TV box locations
• Revision to electrical panels
• Revision to lighting switches
• Revisions to power wiring to accommodate additional circuits to workstations
• Revisions to data wiring to accommodate additional circuits to workstations & show cable tray
layout
Restroom and Locker Rooms have been revised dimensionally and toilet partition
configurations changed. Ambulatory stalls are added to Level 02.
• Shower Ceiling Material is waterproof gyp. painted P-3.
• Locker and Shower Room benches have been changed. Pre-manufactured and different
location. (4)-20”D x 42” L wall mounted and (2) 9 ½”D x 3’L free standing benches.
• Existing Diaper Changing Stations are to be removed and not relocated.
• CMU Openings have been detailed with finishes.
• Handrail at Exterior Wall windows is to be removed.
• Existing HVAC Roof Penetrations are to be covered with metal plate. See RFI 006.
• Ceiling Heights in Conference Rooms, Lobbies, and ceiling clouds have changed.
• Existing Concrete Columns are to be sanded and left as is, no wrap.
• Interior Brick Walls are to be left exposed at level 02 core offices and reception, and sand
blasted to remove glue.
• Exposed Roof Drain Insulation is to be painted P-6.
• Existing Doors in building core are to be painted P-2, existing wood door trim removed, and
exposed hollow metal frame painted P-2.
• Adjacent wall to frame 203b has been adjusted to accommodate frame.
• Conference Room 213 and CEO 205 have switched locations. LVT-1 finish has been partially
removed from in front of CEO office.
|
FIRE-Final Inspection | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete for scope of work, fire alarm inspection has been completed but plan is back into reviewed status due to plan mod, fire extinguishers are placed with current inspection tags. 30 day TCO authorized for life fire safety contingent on fire alarm plans being approved and finaled.
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD-Final | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | PART |
Dave Hannah
|
|
|
As early as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas ok for tco needs elec to go perm and finish ground floor rest rooms
|
Temporary Occupancy | 5/21/2019 | 8/19/2019 | 5/21/2019 | | DONE |
Gemma Flores
|
|
|
|
Meeting | | | 5/21/2019 | | DONE |
|
|
|
ESI came in for temp C of O, but no electrical has been pulled. ELE19-00974 is for the demo only (
|
BLD-Final | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | NR |
Dave Hannah
|
|
|
As late as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD-Ceiling Grid Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 5/10/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD-Ceiling Grid Inspection | 5/10/2019 | 5/13/2019 | 5/10/2019 | A | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas Inspection cancelled via mobile web on Friday, May 10, 2019.
|
BLD-Conference | 5/10/2019 | 5/13/2019 | 5/10/2019 | A | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas Inspection cancelled via mobile web on Friday, May 10, 2019.
|
BLD-Ceiling Grid Inspection | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD-Ceiling Grid Inspection | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas second floor hallwal and conf rm ok to flood
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
Override - Parcel Holds | 4/23/2019 | 1/1/1900 | 4/23/2019 | | |
|
|
|
CZC19-00114 in appeal period, may schedule framing inspection
|
BLD-Framing/Rough-in | 3/29/2019 | 3/29/2019 | 4/1/2019 | P | PASS |
Dave Hannah
|
|
|
Call prior to going Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas 2nd floor
|
BLD-Conference | 3/11/2019 | 3/12/2019 | 3/12/2019 | P | DONE |
Dave Hannah
|
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD-Conference | 3/11/2019 | 3/11/2019 | 3/12/2019 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
Print Occupancy Form | | | 3/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/31/2019 | 1/31/2019 | 3/7/2019 | | PASS |
Carl Westfall
|
|
|
(4th done) 02/18/19 (L3 - 15 days) (ePlan - 57 sheets) Visitpay - Shoreline Building - (routed to staff)
|
Routing PW Flood Plain | 3/7/2019 | | 3/7/2019 | | PASS |
Jason C. Taylor
|
|
|
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLANNING | 3/7/2019 | | 3/7/2019 | | PASS |
David Moser
|
|
|
|
Routing - PLAN CHECK | 3/6/2019 | | 3/7/2019 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/7/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/6/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/5/2019 | | DONE |
|
|
|
|
Routing PW Flood Plain | 3/4/2019 | | 3/5/2019 | | FAIL |
Jason C. Taylor
|
|
|
need additional documentation.
|
Routing - PUBLIC WORKS | 3/4/2019 | | 3/5/2019 | | PASS |
Morgan Webb
|
|
|
Need flood plain review
|
Routing - PLAN CHECK | 3/1/2019 | | 3/4/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLANNING | 3/4/2019 | | 3/4/2019 | | FAIL |
David Moser
|
|
|
Need to submit the market valuation of the building
|
Routing - MECHANICAL | 3/4/2019 | | 3/4/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 3/1/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/28/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 2/27/2019 | | 2/28/2019 | | FAIL |
David Moser
|
|
|
Need floodplain review permit
|
Routing - MECHANICAL | 2/27/2019 | | 2/27/2019 | | FAIL |
Troy James
|
|
|
Still need commissioning form 308 completed and uploaded.
|
Routing - PLAN CHECK | 2/26/2019 | | 2/27/2019 | | FAIL |
Carl Westfall
|
|
|
Two items not resolved
|
Plan resubmittals received | | | 2/26/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/25/2019 | 2/28/2019 | 2/25/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/25/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/25/2019 | | DONE |
|
|
|
|
Routing - FIRE | 1/31/2019 | 1/31/2019 | 2/22/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Fire code review 02.2.2019.pdf uploaded. Passed.
|
Routing - PLAN CHECK | 1/31/2019 | | 2/22/2019 | | FAIL |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 1/31/2019 | | 2/7/2019 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 1/31/2019 | | 2/4/2019 | | FAIL |
David Moser
|
|
|
A Floodplain Review Application is required.
|
Routing - Addressing | 1/31/2019 | | 2/1/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/31/2019 | | 1/31/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 1/31/2019 | | 1/31/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 1/29/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. All drawing files must be landscape orientation.
2. All stamped plans must also be signed and dated.
Revise and resubmit.
|
Intake Approval | | | 1/29/2019 | | PASS |
|
|
|
|
Application received | | | 1/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 25 2019 2:13PM
|