Permit Information
Permit NumberBLD19-00294
StatusFinaled
Name PACIFIC NORTH CONTRACTORS INC
Site Address 201 W BOISE AVE
Project NameJacksons Store 173 TI Remodel
Customer Number 
ePlanReviewYes
Description
(JACKSONS) ***RTU INSTALL PENDING APPROVAL FROM STRUCTURAL REVIEW ON PERMIT BLD19-02117*** Permit to remodel a 2,541 sqft. existing convenience store. Approval of this permit is contingent on adhering to the approved plans. Work to include: Demo work in the backroom, sales, and cashier areas. New: Beverage station, cashier area, and new configuration of back room. New millwork, shelving, plumbing fixtures, lighting fixtures, and interior signage. Below slab plumbing and electrical work. Interior finishes shall comply with chapter 8. This building is NOT fire sprinkled. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/13/2020 DONE
1st past due
Print Statement  7/22/2020 DONE
1st mailed statement
Third Notice 4/11/20204/9/2020 DONE
This permit finaled on the web by Kenny Elumbaugh
Telephone call  4/8/2020 DONE
called and spoke with Christy in accounting. She believes the final values were submitted for the wrong project. I explained to her how to submit final values online and she said she and kenny will get together and do that tomorrow. I gave her my direct phone number to call with questions.
Third Notice 3/10/20204/6/2020 DONE
mailed 4-6-2020
Telephone call  3/30/2020 DONE
Emailed GC to request clarification on final values. They did not provide MEC final value, though 2 MEC permits were pulled. Gave them instructions on how to complete final values online.
Second Notice 2/17/20203/5/2020 DONE
mailed 3-6-20
First Notice 1/26/20202/7/2020 DONE
mailed 2-10-20
BLD-Final1/15/20201/16/20201/16/2020PPASS
DetailsBrandon Shaw
Nate Phone #: ###-####
DOC - Permit Finaled1/16/20201/16/20201/16/2020PPASS
DetailsBrandon Shaw
BLD-Final1/16/20201/16/20201/16/2020PPASS
DetailsJim Storey
FIRE-Final Inspection1/15/20201/16/20201/16/2020APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work is complete.

Nate Phone #: ###-####
Permanent Occupancy  1/16/2020 DONE
Zoning Approval1/6/20201/6/20201/6/2020 PASS
DetailsKatelyn Menuge
BLD-Final12/6/201912/9/201912/9/2019PPART
DetailsBrandon Shaw
Temp C of O is approved for store only...
All permits to be finaled when canopy and fuel island are fininshed...
FIRE-Final Inspection12/9/201912/9/201912/9/2019PPART
DetailsTroy Cobbley
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
FIRE-Final Inspection12/6/201912/9/201912/9/2019APART
DetailsTroy Cobbley
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
Temporary Occupancy12/9/20193/8/202012/9/2019 DONE
DetailsJudith Amador
Telephone call  12/9/2019 DONE
left a message for nate that this permit will not be able to get a temp occ until ele19-04685 has a partial or full final pass
FIRE-Final Inspection12/5/201912/6/201912/6/2019ANR
DetailsJim Page
A stated in th 05DEC entry: Not ready for final life fire safety inspection, FIR19-00913 is for the in duct smoke detectors, FIR permit needs to scheduled, inspected and finaled before life fire safety will be completed. It is cooridnated to be completed the morning of 09DEC2019.

Nate Phone #: ###-####
BLD-Conference12/4/201912/5/201912/5/2019ADONE
DetailsBrandon Shaw
Make sure everything is good to go before final on Friday // Nate Phone #: ###-####
FIRE-Final Inspection12/4/201912/5/201912/5/2019PNR
DetailsJim Page
Not ready for final life fire safety inspection, FIR19-00913 is for the in duct smoke detectors, FIR permit needs to scheduled, inspected and finaled before life fire safety will be completed.

Nate- after 2:30 please and call prior if possible Phone #: ###-####
Zoning Approval Temp12/4/201912/4/201912/4/2019 PASS
DetailsKatelyn Menuge
Bonded for Landscape
FIRE-Final Inspection12/2/201912/3/201912/3/2019AFAIL
DetailsJim Page
Provide fire extinguishers with current inspection tags. A seperate FIR permit is required for the in duct smoke detectors as well as annunciators provided for the in duct smoke detectors. Fuel island permit needs to be finaled with the fire department before life fire safety can be signed off.

Nate Phone #: ###-####
Print Occupancy Form  12/2/2019 DONE
BLD-Ceiling Grid Inspection10/29/201910/30/201910/30/2019APEND
DetailsBrandon Shaw
Pending trades cover approval...
CHANGE STATUS TO (ISS)  10/9/2019 DONE
(F) Reprint permit  10/9/2019 DONE
Print Occupancy Form  10/9/2019 DONE
Inspection Record Card- Bld  10/9/2019 DONE
plan mod
(F) Reprint permit  10/9/2019 DONE
Print Occupancy Form  10/9/2019 DONE
Permit Ready to Issue  10/8/2019 DONE
plan mod approved
Routing - PLAN CHECK10/7/2019 10/7/2019 PASS
DetailsMichael Hanson
Plan mod approval - 1 hour plan mod review fee
Plan assigned to (M_H)9/30/2019 10/7/2019 DONE
DetailsMichael Hanson
Routing - MECHANICAL10/2/2019 10/2/2019 PASS
DetailsTroy James
Plan Modification Accepted  9/30/2019 DONE
added full mechanical HVAC drawings
BLD-Aging Inspection9/11/20199/11/20199/12/2019 CANC
DetailsBrandon Shaw
BLD-Conference9/10/20199/10/20199/10/2019PDEFR
DetailsBrandon Shaw
Work in progress...
BLD-Aging Inspection9/10/20199/10/20199/10/2019 DEFR
DetailsBrandon Shaw
Work in progress...
Print Occupancy Form  7/25/2019 DONE
BLD-Framing/Rough-in4/26/20194/29/20194/29/2019APASS
DetailsDave Hannah
Nate Phone #: ###-####
Issue PAID IN FULL permit  3/12/2019 DONE
Plan assigned to (M_H)2/26/2019 3/1/2019 DONE
DetailsMichael Hanson
02/26 #518 L1 ePlan. 1st review completed - See changemark in ePlan for corrections required.
Routing - PLAN CHECK2/27/2019 3/1/2019 PASS
DetailsMichael Hanson
Routing - Design Review2/27/2019 3/1/2019 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  3/1/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/1/2019 DONE
All Met (tyler@pnccontractors.com)
Need GC
Need rev cert of val
Route to Impact Fee Review2/27/20193/2/20192/27/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
1st review completed  2/27/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
Routing - PLAN CHECK2/21/2019 2/27/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
Plan assigned to (JG)2/21/20192/21/20192/26/2019 DEFR
DetailsJavier Guzman
2/26 L1 Jacksons Store 173 TI Remodel ePlan
Routing PW Environmental2/22/2019 2/26/2019 PASS
DetailsTerry Alber
No grease abatement required at this time.
Routing - Addressing2/21/2019 2/22/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/21/2019 2/22/2019 PASS
DetailsAngela Hardy
Routing - Design Review2/21/2019 2/21/2019 FAIL
DetailsAndrea Tuning
The floor plan shows the infilling of an existing exterior door. This will require Design Review approval.
Routing - PLUMBING2/21/2019 2/21/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  2/20/2019 PASS
DetailsJavier Guzman
Intake Approval  1/29/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Plumbing plans required If food service, the plumbing plans shall be stamped and signed by an Idaho licensed engineer or provide and email from the plumbing supervisor Dan Ediger ###-#### stating no plumbing plans required
Application received  1/28/2019 DONE
Application submitted via PDS Online on Jan 28 2019 9:12AM