Letter of compliance/Occupancy | | | 3/3/2020 | | DONE |
|
|
|
|
BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | DONE |
Jim Storey
|
|
|
Jim Phone #: ###-#### 4.93
|
BLD-Final | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | FAIL |
Mike Jordan
|
|
|
Carl Phone #: ###-####. Complete fire cauliking in garage and provide blower door test results.
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Mike Jordan
|
|
|
sheet rock framing // Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Energy code compliance | 10/25/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####
|
BLD-Wall cover | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Framing/Rough-in | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Framing/Rough-in | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | FAIL |
Mike Jordan
|
|
|
Complete lateral bracing on A3 trusses. Complete fireblocking on furdowns. Nail off all simpson hangars and provide fixes for trusses at entry way. Ok to insulate.
|
BLD-Framing/Rough-in | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | CANC |
Mike Jordan
|
|
|
JIM Phone #: ###-####. moved to pm inspection.
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | DONE |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Wall Bracing | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Wall Bracing | 9/27/2019 | 9/27/2019 | 9/27/2019 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//sthds in wrong locations//framing and nailing needs address at portal frames//window added in shear location at front entry//2 hr wall does not reflect plans//
|
BLD-Wall Bracing | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | FAIL |
Mike Jordan
|
|
|
Carl Phone #: ###-####. Needs to provide a full set of approved plans. Notes say there should be a total of eight pages of construction docs. Omly seven are provided. Wall bracing
|
BLD-Foundation | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Mike Jordan
|
|
|
stem wall // Willie Phone #: ###-####
|
BLD-Footing | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Mike Jordan
|
|
|
Sergio Phone #: ###-####
|
BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | FAIL |
Mike Jordan
|
|
|
Sergio Phone #: ###-####. Approved plans shows duplex 1hr. wall seoeration, per scope of work, townhouses are being constructed, which require a 2hr. seperation. Plans to be resubmitted.
|
BLD-Footing | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | FAIL |
Mike Jordan
|
|
|
surgeo Phone #: ###-####. No city approved plans on site.
|
Issue PAID IN FULL permit | | | 7/30/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2019 | | DONE |
|
|
|
GC will be here next week to submit 302 and sign for permits
|
OVERRIDE | | | 7/24/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 7/10/2019 | 7/10/2019 | 7/24/2019 | | DONE |
Jenny Nelson
|
|
|
2nd review, waiting for planning. 1st complete 7/12, wall bracing, floor joist main floor, ul or ga
|
Routing - PLANNING | 7/22/2019 | | 7/24/2019 | | PASS |
Brent Moore
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/24/2019 | | DONE |
|
|
|
ALL MET-
NEED VALID RP
DO NOT ISSUE WITHOUT BLD19-02007
owner changed GC- needs to provide New GC
|
Routing - PLAN CHECK | 7/22/2019 | | 7/22/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 7/12/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 7/10/2019 | | 7/12/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 7/10/2019 | | 7/12/2019 | | FAIL |
Brent Moore
|
|
|
Need to show distance from 2nd floor to west property line. 15' setback required.
|
Route to Impact Fee Review | 7/10/2019 | 7/13/2019 | 7/11/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 7/10/2019 | | 7/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/10/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 7/10/2019 | | 7/10/2019 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/10/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/10/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/27/2019 | | FAIL |
|
|
|
1. Stair section detail showing dimensions of treads, risers, headroom, handrails, & guard requirements.
2. elevation height to top of roof
3. energy compliance- REScheck
4. Label furnace and air conditioner
5. Light switches of top and bottom of stairs for both townhomes.
|
Application received | | | 6/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2019 8:33AM
|