BLD-Aging Inspection | 6/4/2020 | 6/4/2020 | 6/5/2020 | | PEND |
Tell Riley
|
|
|
needs to turn in signature card
|
BLD-Aging Inspection | 6/3/2020 | 6/3/2020 | 6/4/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Final | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Tell Riley
|
|
|
brandon Phone #: ###-####//corrections made//sreen door removed at accessible entry//accesible entry route signs installed//
|
CHANGE STATUS TO (ISS) | | | 12/18/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/11/2019 | 12/11/2019 | 12/17/2019 | | PASS |
Carl Westfall
|
|
|
PLAN MOD (permits desk)
|
Routing - PLAN CHECK | 12/16/2019 | | 12/17/2019 | | PASS |
Carl Westfall
|
|
|
1st plan mod intake review approved and IBC plan review approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/17/2019 | | DONE |
|
|
|
plan mod approved
|
Route to Impact Fee Review | 12/11/2019 | 12/14/2019 | 12/12/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Reviewer's activity | | | 12/12/2019 | | FAIL |
|
|
|
The plan mod plan intake review was not approved. The revised sheet is required to be stamped and signed by the Architect. The accessible parking space is required to be located on the shortest accessible route to the accessible entrance.
|
Plan Modification Accepted | | | 12/11/2019 | | DONE |
|
|
|
Amy Lindgren from Cushing Terril submitting a request to begin a plan modification workflow. Accessible route has been modified from the originally submitted plans. Sheet G001-COVER AND CODE PLAN
|
BLD-Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | FAIL |
Tell Riley
|
|
|
Call before coming- Brandon Phone #: ###-####//CN issued for olan mod for accessible route and parking, directional signage for non accessible doors, toilet flush lever on wrong side, safety glazing in accordance with the plan review report//
|
FIRE-Final Inspection | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Provide sticker at main exit prior to the building inspection. Storage has been removed from basement, seating has been removed from the first floor. At time of inspection building appears to meet scope of work use.
Brandon Phone #: ###-####
|
FIRE-Final Inspection | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide plan modifications showing the actual use of the Open Office area and the basement. There is currently 42 chairs set up in the open office area for use as music/performance and the basement is being used as storage. Also provide single action hardware on all doors as discussed. Provide and mount the fire extinguishers upstairs and downstairs as discussed. Brandon- Phone #: ###-####
|
BLD-Final | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Tell Riley
|
|
|
Brandon Phone #: ###-####//needs fire life safety inspection completed prior to final//left message with contact//will need to re-schedule final//
|
Zoning Approval | 10/7/2019 | 10/7/2019 | 10/7/2019 | | DONE |
Ethan Mansfield
|
|
|
|
BLD-Framing/Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Tell Riley
|
|
|
Terry Phone #: ###-####//trades passed//framing ok per plans///
|
BLD-Framing/Rough-in | 9/16/2019 | 9/17/2019 | 9/17/2019 | P | PART |
Tell Riley
|
|
|
Terry Phone #: ###-####//partial for office area//all other areas with mechanical need inspections//
|
Issue PAID IN FULL permit | | | 8/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/13/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/19/2019 | 8/15/2019 | 8/8/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 08/08/19 (L-3 - 15 days) (eplan - 15 sheets) Cole Community Church (waiting for fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2019 | | DONE |
|
|
|
|
1st review completed | | | 8/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/8/2019 | | DONE |
|
|
|
MET THOMASCARLSON@ESICONSTRUCTION.COM
Need
ACHD-met
GC Form
Revised Value
|
Routing - FIRE | 7/19/2019 | 7/19/2019 | 8/7/2019 | | PASS |
Mark Scharfen
|
|
|
08.07.2019-uploaded rev_fire 08.07.2019.pdf. Completed fire review.
|
Routing - PLAN CHECK | 7/19/2019 | | 8/2/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 7/19/2019 | | 7/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 7/19/2019 | | 7/22/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - PLANNING | 7/19/2019 | | 7/22/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 7/19/2019 | | 7/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2019 | | 7/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 7/19/2019 | | PASS |
|
|
|
|
Intake Approval | | | 7/17/2019 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete the prescreen process:
1) Plan sheets (A101, P001) do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
2) Engineering Structural Calculations are missing a stamp by the structural engineer
|
Application received | | | 7/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 12 2019 10:34AM
|