General Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Andy J. Long
|
|
|
No disturbed area or temp. BMPs. Permit closed.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/5/2019 | 8/5/2019 | 8/6/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/4/2019 | 7/4/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/4/2019 | 6/4/2019 | 6/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/14/2019 | 5/14/2019 | 5/16/2019 | | PASS |
Andy J. Long
|
|
|
Concrete ramp poured. BLD still open, some work remaining. No violations.
|
General Inspection | 4/26/2019 | 4/26/2019 | 4/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on ADA ramp and curbing in parking lot. Minimal earthwork. No ESC violations observed.
|
Permit Ready to Issue | | | 10/18/2018 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/18/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/4/2018 | | 6/4/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative notes approved. ESC Responsible Person tbd. Site preparation inspection is required prior to excavation.
|
Application received | | | 5/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2018 3:54PM
|