INSP-Final Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection for area of work complete.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
Plan Modification Accepted | | | 7/12/2019 | | DONE |
|
|
|
per Jessica at Tribal Fire - start workflow for plan mod
|
Plan assigned to (Stumbaugh) | 7/12/2019 | | 7/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 7/12/2019 | | 7/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 7/12/2019 | | DONE |
|
|
|
plan mod so please don't re issue
|
CHANGE STATUS TO (ISS) | | | 7/12/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | FAIL |
Jim Page
|
|
|
Notated city approved drawings areas that need to be corrected. Submit plan modification to have sway bracing removed from city approved drawings.
Please call Dillion Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Jim Page
|
|
|
No inspection performed for this permit due to time constraints, this request is cancelled per conversation with point of contact.
Please call Dillion Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, city approved drawings/small documents could not be located, city approved drawings and small documents are required for inspection.
Dillion Phone #: ###-####
|
INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 7/30/2018 | 7/31/2018 | 7/31/2018 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection complete, fire sprinkler permit will remain in issued status until project is complete due to possible obstructions needing coverage.
Chris Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 6/15/2018 | 6/18/2018 | 6/18/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Chris Phone #: ###-####
|
Fees Due Hold | 4/13/2018 | | 6/15/2018 | | DONE |
Candy A. Nichols
|
|
|
|
Fees Due Hold | 3/15/2018 | | 4/12/2018 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 3/14/2018 | | 3/14/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/14/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 3/14/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/13/2018 | | 3/13/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/13/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 3/12/2018 | | 3/12/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/12/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 3/9/2018 | | 3/9/2018 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/9/2018 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 3/8/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/8/2018 | | 3/8/2018 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/8/2018 | | PEND |
|
|
|
Sent the following email on 3/08/2018
Clarence,
• I see an area on the drawing indicated as “Sulfuric Acid Storage”. Please, provide the quantities and how it is being stored.
• Sulfuric Acid is a class 2 water-reactive substance. I will need a letter verifying sprinkler protection is permissible and desired from the owner's engineer.
• There is another area which is indicated as “90 Day Accumulation”. Accumulation of what? What is the quantity and how is it being stored.
• Why is the area between columns SD.8- SH, S8-S8,7 NOT being protected? The fire main required protection per NFPA 13: 8.16.4.3.1, 8.16.4.3.2
The above information is required before the review can be completed.
|
Application received | | | 3/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2018 2:43PM
|