INSP-Final Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection complete.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan assigned to (Lee) | 3/28/2019 | | 3/29/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/29/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 3/29/2019 | | 3/29/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/29/2019 | | DONE |
|
|
|
As built passed. Actual conditions to be verified by inspector.
|
Permit Ready to Issue | | | 3/29/2019 | | |
|
|
|
as built, no fee per Lee
|
Issue and Print Permit | | | 3/29/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | FAIL |
Jim Page
|
|
|
Fire panel that was installed does not match what was submitted. Communicator showing trouble at time of inspection. In-duct detectors report to panel as a trouble with no RTU shutdown on both HVAC units. Provide a different type of notification appliance in horn location, horns do not sync with speaker strobes as well as overpowering the sound of the surrounding speaker strobes. Signals were not verified at time of inspection.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Plan resubmittals received | | | 3/28/2019 | | DONE |
|
|
|
as built per morgan with protex
|
INSP-Final Inspection | 3/22/2019 | 3/25/2019 | 3/25/2019 | P | FAIL |
Jim Page
|
|
|
Two speaker strobes in gym area are blocked by ducting. Need to test in-ducts for HVAC unit shutdown. Wire hanging out of communicator to fire panel.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PART |
Jim Page
|
|
|
Fire alarm audible device now meets the required NFPA 72 sound level requirements in the new kitchen area..
Final is for Kitchen Only. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 3/12/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Jim Page
|
|
|
Audible level was not met in kitchen area.
This final is only for the kitchen portion. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
Miscellaneous action | | | 3/12/2019 | | DONE |
|
|
|
Rob called to say the school district decided to remove interface between buildings but the seperate GSM will be kept. I told him to provide as builts when tiime for sign off.
|
Miscellaneous action | | | 3/11/2019 | | DONE |
|
|
|
Notification changed back to horns only so speakers and strobes removed from kitchen. Inspector to verify that audibility levels in the kitchen are adequate.
|
Miscellaneous action | | | 2/28/2019 | | DONE |
|
|
|
Received product data for a GSM communicator and updated riser drawing.
|
Plan resubmittals received | | | 8/29/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 8/29/2018 | | 8/29/2018 | | PASS |
Lee G Meredith
|
|
|
Approved with drawing notes and requirements.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/29/2018 | | DONE |
|
|
|
Plans approve with review comments and requirements.
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
all requirement met
|
Issue and Print Permit | | | 8/29/2018 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 8/27/2018 | | 8/27/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/27/2018 | | DONE |
|
|
|
Failed pre-screen review. Returned to Morgan so a scale graph could be added.
|
Application received | | | 8/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 15 2018 12:54PM
|