Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR19-00770
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 11457 W TIOGA CT
Project NameDegitz Residence
Customer Number 
ePlanReviewYes
Description
Shilo will install a new fire sprinkler system into the new Degitz Residence per NFPA 13D, 2016, and the City of Boise.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/25/20203/26/20203/26/2020APASS
DetailsTroy Cobbley
Permit finaled. Water meter changed per Suez. See the email attached in Documents for Boise Fire agreement on revised water flow.

Cam Phone #: ###-####
CHANGE STATUS TO (ISS)  3/25/2020 DONE
Plan Modification Accepted  3/24/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/24/2020 3/24/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/24/2020 DONE
DetailsMark Stumbaugh
Review time 1 hr
No new devices
Permit Ready to Issue  3/24/2020 DONE
DO NOT ISSUE- as built approved
Sprinkler Plan Check2/28/2020 3/11/2020 FAIL
DetailsMark Stumbaugh
Additional changes needed for underground piping arrangement.
INSP-Final Inspection2/27/20202/28/20202/28/2020AFAIL
DetailsJim Page
Premit is under review as of these notes, final inspection cannot be performed until permit is back into issued status. According to SUEZ, water meter is a 5/8 water meter, not 1 inch as show on city approved documents.

Jon Beazer is the contact for this final inspection. Thank you for your help. Have a good day. Phone #: ###-#### Inspection requested via web by Stan Beus
Plan assigned to (Stumbaugh)2/27/2020 2/28/2020 DONE
DetailsMark Stumbaugh
INSP-Final Inspection2/26/20202/27/20202/27/2020PCANC
DetailsTroy Cobbley
Cole Bierman is the contact for this final inspection. He is hoping for a PM appointment. He is needing an hour notice if possible as he will be working at another job site. Thank you for your help. Have a nice day. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection2/26/20202/27/20202/27/2020ACANC
DetailsTroy Cobbley
Cole Bierman is the contact. Thanks for all you do! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Plan resubmittals received  2/27/2020 DONE
as built
INSP-Final Inspection2/25/20202/26/20202/26/2020AFAIL
DetailsTroy Cobbley
Possible plan mods are needed due to the length of the actual underground supply, two houses fed off a single 1" supply and a 5/8" water meter. Repair the outside alarm bell and provide signage as discussed.
Cole will be the contact. Please give him an hours notice to meet you there. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro2/25/20202/25/20202/25/2020PPASS
DetailsTroy Cobbley
Overhead hydro witnessed with no pressure loss.

Cole will be the contact. Please give him an hours notice to meet you there. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/6/201912/6/201912/6/2019PPASS
DetailsTroy Cobbley
Tenting passed. Piping can be covered.
INSP-Sprinkler Rough-in12/5/201912/5/201912/5/2019PFAIL
DetailsTroy Cobbley
Tenting needs repaired in the second floor bedroom and I need access to the area above the ceiling in the garage room.
INSP-Sprinkler Rough-in11/11/201911/12/201911/12/2019APASS
DetailsTroy Cobbley
Rough-in passed. Piping can not be covered until a tenting inspection has been passed. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
Issue and Print Permit  10/25/2019 DONE
Sprinkler Plan Check10/22/2019 10/22/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/22/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  10/22/2019 DONE
met
Plan resubmittals received  10/21/2019 DONE
DetailsMark Stumbaugh
Intake Approval  10/14/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/14/2019 10/14/2019 DONE
DetailsMark Stumbaugh
1st review completed  10/14/2019 FAIL
DetailsMark Stumbaugh
Sprinkler Plan Check10/14/2019 10/14/2019 FAIL
DetailsMark Stumbaugh
Application received  10/13/2019 DONE
Application submitted via PDS Online on Oct 13 2019 3:01PM