BLD-Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Jim Storey
|
|
|
Ann Phone #: ###-####
|
FIRE-Final Inspection | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
Ann Phone #: ###-####
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | NR |
Jim Storey
|
|
|
Ann Phone #: ###-#### Life safety wil be ok to pass when the project related fire sprinkler permit, FIR19-00459, is finaled.
|
FIRE-Final Inspection | 7/31/2019 | 8/2/2019 | 8/2/2019 | A | FAIL |
Troy Cobbley
|
|
|
Life safety wil be ok to pass when the project related fire sprinkler permit, FIR19-00459, is finaled. Ann Phone #: ###-####
|
BLD-Aging Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | | PASS |
Jim Storey
|
|
|
pending fire//Due to the history of this permit, the point of contact is going to reschedule for when Troy Cobbley is back in the office, this request is cancelled per conversation with point of contact.
|
FIRE-Final Inspection | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | CANC |
Jim Page
|
|
|
Due to the history of this permit, the point of contact is going to reschedule for when Troy Cobbley is back in the office, this request is cancelled per conversation with point of contact.
Ann Phone #: ###-####
|
BLD-Conference | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Jim Storey
|
|
|
Conference - Chad Phone #: ###-####
|
BLD-Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | DEFR |
Jim Storey
|
|
|
Conference - Chad Phone #: ###-####
|
FIRE-Final Inspection | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | FAIL |
Troy Cobbley
|
|
|
Per conversation with Chad BME will be pulling a separate permit for suite #108.
Suite #108 items needing correction are: sprinkler modifications, sprinkler monitoring, repair exit sign, remove thumbturn deadbolt at exits.
Suite #102 (this tenant in all other spaces) needs : thumbturn deadbolt removed from exterior and interior exits, ceiling tile installed in mechanical room, bent sprinkler head repaired at overhead door, racking permit for racks over 8', exterior door hardware, possible deleting Paint Room door (need plan review approval), provide sprinkler coverage under paint room door, repair insulation at roof deck in Paint Room, Paint Room process needs plan review approval, door sticker at main exit needs provided, sprinkler piping hanger on second floor needs repaired. See city approved plans for items high lighted.
Chad Phone #: ###-####
|
FIRE-Final Inspection | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for the following day per conversarion with point of contact.
Chad Phone #: ###-####
|
BLD-Final | 1/30/2019 | 2/6/2019 | 2/6/2019 | P | NR |
Jim Storey
|
|
|
Ann Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2019 | 2/6/2019 | 2/6/2019 | A | CANC |
Troy Cobbley
|
|
|
Ann Phone #: ###-####
|
BLD-Final | 1/29/2019 | 1/31/2019 | 1/31/2019 | P | CANC |
Jim Storey
|
|
|
Ann Phone #: ###-####
|
FIRE-Final Inspection | 1/29/2019 | 1/31/2019 | 1/31/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Ann Phone #: ###-####
|
BLD - Request for Extension | 1/9/2019 | 1/10/2019 | 1/10/2019 | P | DEFR |
Jim Storey
|
|
|
Call for access- Ann Phone #: ###-#### Adele Schaffeld-Griffin Assistant Building Official
Planning and Development Services
Office: ###-####
aschaffeldgriffin@cityofboise.org
|
BLD-Final | 1/8/2019 | 1/10/2019 | 1/10/2019 | P | CANC |
Jim Storey
|
|
|
please call 1 hr ahead // Ann Moffat Phone #: ###-####
|
FIRE-Final Inspection | 1/8/2019 | 1/10/2019 | 1/10/2019 | A | CANC |
Troy Cobbley
|
|
|
please call 1 hr ahead // Ann Moffat Phone #: ###-####
|
BLD-Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 | | PASS |
Jim Storey
|
|
|
Attn Carl Madsen; 223 Roedel and Extendobed would like to request an extension on building permits for the following properties located at 4242 Eagleson Road, Boise, ID 83705 and 5498 W Albatros, Boise, ID 83705. The permits numbers are as follows; £-ep .A.c..k. 4s oJ. 7 .. 1 ~ -1 Y BLD17- 02434 1- I 1-1 ~ BLDl 7- 02435 , ..... I t-1 (' BLD17-02436 1-11,1t' BLD17- 02437 . Z-- "'2.s-1 V BLD17- 02438 z..,. L.S-- ll( BLD17- 02439 1,--i:S-- IY We have been working on the modifications for the fire suppression system for the past 11 months due to an unpermitted mezzanine in one of the buildings. The tenant has removed the mezzanine and we are proceeding forward with the sprinkler system.
|
BLD-Aging Inspection | 11/22/2018 | 11/22/2018 | 11/23/2018 | | PASS |
Jim Storey
|
|
|
Attn Carl Madsen; 223 Roedel and Extendobed would like to request an extension on building permits for the following properties located at 4242 Eagleson Road, Boise, ID 83705 and 5498 W Albatros, Boise, ID 83705. The permits numbers are as follows; £-ep .A.c..k. 4s oJ. 7 .. 1 ~ -1 Y BLD17- 02434 1- I 1-1 ~ BLDl 7- 02435 , ..... I t-1 (' BLD17-02436 1-11,1t' BLD17- 02437 . Z-- "'2.s-1 V BLD17- 02438 z..,. L.S-- ll( BLD17- 02439 1,--i:S-- IY We have been working on the modifications for the fire suppression system for the past 11 months due to an unpermitted mezzanine in one of the buildings. The tenant has removed the mezzanine and we are proceeding forward with the sprinkler system.
|
BLD-Aging Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 | | PASS |
Jim Storey
|
|
|
wip with fire
|
BLD-Final | 8/25/2017 | 8/29/2017 | 8/29/2017 | P | NR |
Jim Storey
|
|
|
Chad Phone #: ###-#### fire sent back to planreview resch.
|
FIRE-Final Inspection | 8/25/2017 | 8/29/2017 | 8/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide building address and correct suit number, provide missing sprinkler coverage in Server Room, replace painted head outside of Server Room at roof deck, straighten head under overhead door at northwest loction, delete pendant and provide sprinkler coverage under both northeast overhead doors, provide sprinkler coverage under stairs to mezzanine, provide racking permit for all racking over 8' or storage over 12', remove tape from sprinkler head in Office, replace bent sprinkler head in Restroom, remove thumbturn deadbolts from all doors, main exit can be keyed both sides with sticker as discussed. Provide submittals to plan review for the Spraying Operation that is taking place and provide sprinkler coverage for makeshift plastic booth. Provide annual inspection of the fire sprinkler system and provide fire sprinkler monitoring.
Chad Phone #: ###-####
|