Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD17-04626
StatusFinaled
Name PETRA INC
Site Address 2010 S HUDSON AVE
Project NameSkyline Apartments
Customer NumberBLD17-04623 IN EPLAN
ePlanReview 
Description
Building D: (SKYLINE APARTMENTS – BUILDING TYPE 3, Building D)(12 units) The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 15,052 square foot three story VB Type of Construction apartment building (5,034 sq. ft. 1st story and 5,009 sq. ft. 2nd story and 5,009 sq. ft. 3rd story). Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20196/7/20196/7/2019APASS
DetailsJim Storey
Building Final Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final5/30/20195/31/20195/31/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by J.C. Murray perm final ok
FIRE-Final Inspection5/30/20195/31/20195/31/2019APASS
DetailsJim Page
Final life fire safety inspection completed 01APRIL2019.

Fire / Life ; safety Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final4/1/20194/1/20194/1/2019PPASS
DetailsJim Storey
Mechanical (Jack) Inspection did not get set for morning. He will be first after lunch. Phone #: ###-#### Inspection requested via web by J.C. Murray tco pending others for final perm
BLD-Final3/29/20194/1/20194/1/2019ACANC
DetailsJim Storey
Bld D TCO Phone #: ###-#### >> Inspection requested via web by J.C. Murray Inspection cancelled from web by: J.C. Murray
FIRE-Final Inspection3/29/20194/1/20194/1/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.

fire, Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection3/28/20193/29/20193/29/2019ACANC
DetailsJim Page
Fire sprinkler ispection is scheduled for 01APR2019, this inspection will be rescheduled to coincide with fire sprinkler final, this request is cancelled per conversation with poiunt of contact.

Fire, life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final3/28/20193/29/20193/29/2019PCANC
DetailsTony Young
Structural TCO Phone #: ###-#### Inspection requested via web by J.C. Murray// canc. per JC
FIRE-Final Inspection3/27/20193/28/20193/28/2019ACANC
DetailsJim Page
Fire sprinkler did not pass inspection, this request cancelled per conversation with point of contact.

fire , Life ; Safety. fire sprinkler is scheduled for tomorrow am. Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection3/26/20193/27/20193/27/2019PCANC
DetailsJim Page
FIR permits for fire sprinkler (1 permit for overhead and 1 permit for undergorund) and fire alarm need to be finaled before life fire safety inspection can be completed, this request is cancelled and life fire safety inspection will need to be scheduled to coincide with fire alarm and fire sprinkler inspection.

Fire, Life ; Safety Inspection Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Conference3/26/20193/27/20193/27/2019APASS
DetailsJim Storey
preliminary consult for TCO thank you. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Wall cover12/6/201812/12/201812/12/2018PDONE
DetailsJim Sly
Bld D - drop ceilings for cover 3rd floor. Phone #: ###-#### Inspection requested via web by J.C. Murray 2nd and 3rd floor.......OK
BLD-Wall cover12/7/201812/11/201812/11/2018PPASS
DetailsMike Jordan
Bld D - drop ceilings for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray. 1st floor only ok.
BLD-Wall cover12/6/201812/7/201812/7/2018PNR
DetailsJim Storey
Bld D - drop ceilings for cover. 1st and 2nd floors. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance11/16/201811/16/201811/16/2018PPASS
DetailsJim Storey
Bld C - north (6) D-Units; 1st floor, 2nd floor, 3rd floor Phone #: ###-#### Inspection requested via web by J.C. Murray insulation , rc channel and framing ok
BLD-Framing/Rough-in11/15/201811/16/201811/16/2018APASS
DetailsJim Storey
missed the 11:30 cut off
Bld C - interior framing and fire caulking North D-Units (6) Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance11/1/201811/2/201811/2/2018APASS
DetailsJim Storey
Bld D; RC Channel north side 6 units. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance10/31/201810/31/201810/31/2018PPASS
DetailsJim Storey
Bld D - completion energy code inspection, 1 hr. comments. Phone #: ###-#### Inspection requested via web by J.C. Murray 6 south units ok insulation and rc chammel/
BLD-Energy code compliance10/29/201810/30/201810/30/2018PPART
DetailsMike Jordan
building D, insulation and vapor barriers.
gypcrete under tubs. Phone #: ###-#### Inspection requested via web by J.C. Murray. Noted furred areas behind tub/shower at ceiling has not been pre rocked. Also noted possible non rated low voltage boxes that have been installed. no one from petra on site and no awnser on phone call. Insulation, vapor barrier and gyp crete under tubs ok.
BLD-Framing/Rough-in9/19/20189/19/20189/19/2018PPASS
DetailsJim Storey
framing structural complete. exterior nailing, trusses .
missing straps. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in9/14/20189/17/20189/17/2018ANH
DetailsBrandon Shaw
Gate locked, no one on site
BLD-Framing/Rough-in9/6/20189/7/20189/7/2018PNR
DetailsJim Storey
Bld D - exterior strapping and nailing. interior hold downs and plate bolting. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in9/4/20189/6/20189/6/2018PPART
DetailsJim Storey
Bld D - exterior strapping and nailing. interior hold downs and plate bolting. Phone #: ###-#### Inspection requested via web by J.C. Murray 3 straps and interior bolts wip/
BLD-Framing/Rough-in8/15/20188/16/20188/16/2018PPASS
DetailsJim Storey
Bld C - interior shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by J.C. Murray interior 1st floor pass
BLD-Framing/Rough-in8/1/20188/2/20188/2/2018APASS
DetailsJim Storey
1st floor partition shear wall building D Phone #: ###-#### Inspection requested via web by J.C. Murray center interior only.
BLD-Energy code compliance7/25/20187/25/20187/25/2018PPASS
DetailsJim Storey
foundation insulation and slab vapor barrier for Building D. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Foundation7/5/20187/6/20187/6/2018APASS
DetailsJim Storey
Manuel Phone #: ###-####
BLD-Footing7/2/20187/2/20187/2/2018PPASS
DetailsBrandon Shaw
Building D