Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD17-04686
StatusFinaled
Name ANDERSEN CONSTRUCTION COMPANY IDAHO
Site Address 1005 W MAIN ST
Project NameJohn Alden Reno & addition
Customer Number 
ePlanReviewYes
Description
(JOHN ALDEN BUILDING) BO & AFM MODIFICATION ATTACHED TO CASE: MECHANICAL ROOF WELL AND (2) 1,680 SQ. FT. AREAS ON 2ND & 3RD FLOORS ALLOWED SPRINKLERS FOR SUBSTITUTION FOR GIRDERS & JOISTS, HOWEVER DECK & SUPPORTING COLUMNS WILL BE 1HR. RATED AND SUPPORTING WALLS 2HR. RATED. "PLAN MODIFICATION 2: TO CONSTUCT AN ADDIOTNAL HALLWAY, TENANT DEMISING WALL AND MODIFY THE STOREFRONT"" ""PLAN MODIFICATION TO ADD AN ADDITIONAL STAIRWAY BETWEEN THE 3rd AND 4th FLOORS"" Permit for core and shell upgrades and the addition of a 5,330 sq. ft. 5th story to the building with work to include, acessible restrooms, minor space reconfiguations and the installation of a new elevator. A separate permit will be required for the interior build out of the tenant spaces. This building is fully fire sprinklered. Separate fire sprinkler and fire alarm permits will be required; as regulated by Boise Fire Department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/25/20194/25/20194/25/2019ADONE
DetailsBob Archibald
All associated permits are finaled.
BLD-Final4/23/20194/24/20194/24/2019APASS
DetailsDave Hannah
Pete Phone #: ###-####
BLD-Final3/18/20193/18/20193/18/2019PPASS
DetailsDave Hannah
Pete Phone #: ###-####
BLD-Final3/6/20193/7/20193/7/2019APASS
DetailsDave Hannah
Tom Phone #: ###-#### ok for tco
FIRE-Conference1/18/20191/22/20191/22/2019ADONE
DetailsJim Page
Fire conference complete.

Tyler Phone #: ###-####
BLD-Final1/3/20191/4/20191/4/2019APART
DetailsDave Hannah
Pete Phone #: ###-#### ok for tco
FIRE-Final Inspection1/3/20191/3/20191/3/2019PPASS
DetailsJim Page
Final life fire safety inspection for core and shell only complete, Tenant improvements are under a seperate permit and is currently under construction.

KEITH Phone #: ###-####
BLD-Final12/28/201812/28/201812/31/2018PNR
DetailsDave Hannah
Pete Phone #: ###-####
FIRE-Final Inspection12/28/201812/28/201812/28/2018PFAIL
DetailsJim Page
Exposed combustible material in basement that is no covered by fire sprinklers. Need FIR permits for fire alarm and fire sprinkler finaled before life safety can be completed. Install sheetrock in level 1 elevator lobby, sprinkler head not installed because of no sheetrock. Provide signage for exterior showing which stairwell has roof top access and the one that does not. Still need to test emergency lighting.

Mop sink on level 4 leaked down to level 3 saturating the monitoring modules for the fire alarm system, leak needs to be fixed to prevent false alarms.

Pete Phone #: ###-####
FIRE-Final Inspection12/27/201812/27/201812/27/2018PFAIL
DetailsJim Page
Project not ready for life fire safety.

Phone #: ###-####
BLD-Conference12/11/201812/12/201812/12/2018ADONE
DetailsDave Hannah
Pete Phone #: ###-####
BLD-Conference12/7/201812/7/201812/10/2018PDONE
DetailsDave Hannah
Pete Phone #: ###-####
FIRE-Conference11/19/201811/19/201811/19/2018ADONE
DetailsJim Page
Signage discussed for pruposed TCO, temporary signage can be used if a TCO is aggress upon, permenant signage needs to be in place for final C of O.
FIRE-Final Inspection11/16/201811/19/201811/19/2018ACANC
DetailsJim Page
Request is for a conference, not a final. This request is cancelled.

Tyler Phone #: ###-####
BLD-Other10/25/201810/26/201810/29/2018PPART
DetailsDave Hannah
Tyler-fire caulking Phone #: ###-####
BLD-Wall Bracing10/8/201810/8/201810/8/2018PPASS
DetailsDave Hannah
5th fl - Pete Phone #: ###-####
BLD-Wall Bracing9/27/20189/27/20189/27/2018PPASS
DetailsDave Hannah
Pete Phone #: ###-####
BLD-Framing/Rough-in9/19/20189/19/20189/24/2018PPASS
DetailsDave Hannah
5th fl // Pete Phone #: ###-####
BLD-Wall Bracing9/21/20189/21/20189/21/2018PPASS
DetailsDave Hannah
Pete Phone #: ###-####
BLD-Framing/Rough-in9/17/20189/17/20189/17/2018PPART
DetailsDave Hannah
framing 5th floor exterior walls // Pete Phone #: ###-#### ok to shear
BLD-Wall Bracing9/12/20189/12/20189/13/2018PCANC
DetailsDave Hannah
2nd floor exterior shear // Pete Phone #: ###-#### ok to cover ext wall
BLD-Framing/Rough-in9/6/20189/6/20189/6/2018PPASS
DetailsDave Hannah
4th fl exterior framing - Pete Phone #: ###-####
BLD-Framing/Rough-in9/4/20189/4/20189/4/2018PPART
DetailsDave Hannah
4th fl // Pete Phone #: ###-#### restroom ok and east side parepit
BLD-Framing/Rough-in8/30/20188/30/20188/30/2018PFAIL
DetailsDave Hannah
4th, bathroom, roof- Keth Phone #: ###-####
BLD-Framing/Rough-in8/20/20188/20/20188/20/2018PPART
DetailsDave Hannah
Tyler Phone #: ###-#### roof framing 1st floor
BLD-Framing/Rough-in8/6/20188/6/20188/6/2018PPART
DetailsDave Hannah
Pete Phone #: ###-#### third floor restrooms ok and parapet on north side ok
BLD-Framing/Rough-in7/23/20187/23/20187/23/2018PPART
DetailsDave Hannah
Pete Phone #: ###-#### second floor rest rooms ok
BLD-Conference7/10/20187/11/20187/11/2018ADONE
DetailsDave Hannah
pete Phone #: ###-####
BLD-Conference5/31/20186/1/20186/1/2018ADONE
DetailsDave Hannah
Pete Phone #: ###-#### needs engineer field judgement
FIRE-Conference5/25/20185/29/20185/29/2018ADONE
DetailsJim Page
Fire conference complete.

Pete Phone #: ###-####