BLD-Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | A | DONE |
Bob Archibald
|
|
|
All associated permits are finaled.
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Final | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Final | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok for tco
|
FIRE-Conference | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Tyler Phone #: ###-####
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for core and shell only complete, Tenant improvements are under a seperate permit and is currently under construction.
KEITH Phone #: ###-####
|
BLD-Final | 12/28/2018 | 12/28/2018 | 12/31/2018 | P | NR |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Final Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | FAIL |
Jim Page
|
|
|
Exposed combustible material in basement that is no covered by fire sprinklers. Need FIR permits for fire alarm and fire sprinkler finaled before life safety can be completed. Install sheetrock in level 1 elevator lobby, sprinkler head not installed because of no sheetrock. Provide signage for exterior showing which stairwell has roof top access and the one that does not. Still need to test emergency lighting.
Mop sink on level 4 leaked down to level 3 saturating the monitoring modules for the fire alarm system, leak needs to be fixed to prevent false alarms.
Pete Phone #: ###-####
|
FIRE-Final Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety.
Phone #: ###-####
|
BLD-Conference | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Conference | 12/7/2018 | 12/7/2018 | 12/10/2018 | P | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 11/19/2018 | 11/19/2018 | 11/19/2018 | A | DONE |
Jim Page
|
|
|
Signage discussed for pruposed TCO, temporary signage can be used if a TCO is aggress upon, permenant signage needs to be in place for final C of O.
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | CANC |
Jim Page
|
|
|
Request is for a conference, not a final. This request is cancelled.
Tyler Phone #: ###-####
|
BLD-Other | 10/25/2018 | 10/26/2018 | 10/29/2018 | P | PART |
Dave Hannah
|
|
|
Tyler-fire caulking Phone #: ###-####
|
BLD-Wall Bracing | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Dave Hannah
|
|
|
5th fl - Pete Phone #: ###-####
|
BLD-Wall Bracing | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2018 | 9/19/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
5th fl // Pete Phone #: ###-####
|
BLD-Wall Bracing | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PART |
Dave Hannah
|
|
|
framing 5th floor exterior walls // Pete Phone #: ###-#### ok to shear
|
BLD-Wall Bracing | 9/12/2018 | 9/12/2018 | 9/13/2018 | P | CANC |
Dave Hannah
|
|
|
2nd floor exterior shear // Pete Phone #: ###-#### ok to cover ext wall
|
BLD-Framing/Rough-in | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
4th fl exterior framing - Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Dave Hannah
|
|
|
4th fl // Pete Phone #: ###-#### restroom ok and east side parepit
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Dave Hannah
|
|
|
4th, bathroom, roof- Keth Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PART |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### roof framing 1st floor
|
BLD-Framing/Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### third floor restrooms ok and parapet on north side ok
|
BLD-Framing/Rough-in | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### second floor rest rooms ok
|
BLD-Conference | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | DONE |
Dave Hannah
|
|
|
pete Phone #: ###-####
|
BLD-Conference | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | DONE |
Dave Hannah
|
|
|
Pete Phone #: ###-#### needs engineer field judgement
|
FIRE-Conference | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Pete Phone #: ###-####
|