BLD-Final | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | NR |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | DEFR |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | DEFR |
Jim Storey
|
|
|
Mike Phone #: ###-#### out of time set for 3/18
|
FIRE-Final Inspection | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection.
Mike Phone #: ###-####
|
FIRE-Final Inspection | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | CANC |
Jim Page
|
|
|
Rescheduled for 17MAR2020 per conversation with point of contact, this request is cancelled.
Mike Phone #: ###-####
|
FIRE-Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Call ahead // Mike Phone #: ###-####
|
FIRE-Conference | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | CANC |
Jim Page
|
|
|
Conference anceled per voicemail from point of contact, will be rescheduled for a later date.
call prior mike Phone #: ###-####
|
FIRE-Final Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | CANC |
Troy Cobbley
|
|
|
Mike- code reference on the drawings , PLEASE TAKE A LOOK Phone #: ###-####
|
FIRE-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Jim Page
|
|
|
Door 111 is designated as an exit door with path of travel going from cooler to office area, door 111 needs to swing with the path of travel, door swing needs to be changed, no other items inspected for life fire safety.
call 30 mins ahead please- Mike Phone #: ###-####
|
BLD-Final | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | NR |
Jim Storey
|
|
|
Mike- wants 30 call before, inform that is not guarantee Phone #: ###-####
|
FIRE-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, egress paths discussed as well as the addition of an exit sign and two being removed.
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | FAIL |
Jim Storey
|
|
|
front entry // jim Phone #: ###-#### need insulation covered/ end supports of mains// ok to check at final,
|
BLD-Framing/Rough-in | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Jim Storey
|
|
|
back entry // jim Phone #: ###-####
|
FIRE-Final Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Plans need to be revised and re-approved for the wall layout changes. The path of egress will need to be approved for possible exit sign/emergency light layout. Also multiple open rooms in the warehouse area actuall have overhead doors installed and "porthole" type windows mounted that state "emergency exit". The doors/exiting need approved.
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### entry ok
|
BLD-Ceiling Grid Inspection | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 8/14/2018 | 8/14/2018 | 8/15/2018 | P | PASS |
Jim Storey
|
|
|
Tim-bolts that will be comvered in concrete Phone #: ###-#### si
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### exterior loadding dock walls
|
BLD-Foundation | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### office walls ok
|
BLD-Footing | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jim Storey
|
|
|
pouring at 11am -mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|