Permit Information
Permit NumberBLD18-02551
StatusFinaled
Name JRM CONSTRUCTION
Site Address 416 S 9TH ST
Project NameThe Knittitng Factory
Customer Number 
ePlanReviewYes
Description
(THE KNITTING FACTORY – NEW OCCUPANCY SCENARIOS) (2-21-19 PLAN MODIFICATION TO REMOVE THE FORMERLY PROPOSED WOMEN’S TOILET ROOM WITHIN THE UPPER BAR AREA FROM THE PROJECT, MAINTAIN THE EXISTING SINGLE USER TOILET ROOM AT THAT LOCATION, MAINTAIN DOOR 104 AND DOOR 106 AT THEIR CURRENT WIDTH ALONG THE PATH OF EGRESS TRAVEL TO THE ALLEY FROM THE LOWER LEVEL, AND TO RETAIN THE ROLL DOWN FIRE DOOR IN AN EXISTING 2-HR FIRE WALL BETWEEN THE UPPER BAR AND THE MEZZANINE.) The fire sprinkler system is used for story increase and for building area increase. To re-establish occupant loads based on approved occupancy scenarios for an events center. The total occupant load will not increase from what was originally approved. Several occupancy scenarios were proposed showing the number of patrons and the number of employees allowed based on the size of the stage, whether chairs are provided, whether chairs and tables are provided, and whether no chairs and no tables are provided. Each approved scenario determines the allowed number of occupants for that scenario so that an overcrowding condition is avoided. The floor plans for all approved scenarios are required to be maintained on site and to be available to the Fire Department upon request. Each event is required to comply with an approved scenario. Work is to include a new side-hinged swinging fire doors to replace a roll-down fire door in a fire wall, a reconfigured bar to improve sight lines and make more area available to patrons, and relocating an existing walk-in cooler. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20196/17/20196/24/2019PPASS
DetailsDave Hannah
Rick Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Final6/21/20196/21/20196/21/2019PPASS
DetailsDave Hannah
Rick for JRM Phone #: ###-#### Inspection requested via web by Johnathon McGee
FIRE-Final Inspection6/21/20196/21/20196/21/2019PPASS
DetailsJim Page
Fire alarm inspection has been completed, final life fire safety inspection for scope of work is complete.

Rick for JRM and John Lodman for hawkins Phone #: ###-#### Inspection requested via web by Johnathon McGee
FIRE-Final Inspection6/14/20196/17/20196/17/2019ACANC
DetailsJim Page
JCI did not request an inspection for the FIR permit associated with this project(FIR19-00078), FIR permits need to be finaled before life fire safety can be completed. Coordinate with JCI for inspection request, this request is cancelled.

John Lodman Hawkins Company Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Foundation5/13/20195/13/20195/13/2019PCANC
DetailsDave Hannah
BLD-Final3/5/20193/6/20193/6/2019PPART
DetailsDave Hannah
Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee ok for tco
FIRE-Final Inspection3/5/20193/6/20193/6/2019PPART
DetailsJim Page
Final inspection for life fire safety inspection is complete, a 45 day TCO is approved by Ron Johnson provided the fire alarm work is completed (see fire alarm comments under FIR19-00078) as-builts are submitted, work performed matches city approved drawings and FIR permit for fire alarms is finaled.

Call 30 mins before Phone #: ###-#### Inspection requested via web by Johnathon McGee
FIRE-Final Inspection3/5/20193/5/20193/5/2019PCANC
DetailsJim Page
Call 30 minutes prior to late afternoon preferred Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
BLD-Final3/1/20193/4/20193/4/2019PCANC
DetailsDave Hannah
Call 30 mins before Phone #: ###-#### >> Inspection requested via web by Johnathon McGee Inspection cancelled from web by: Johnathon McGee
FIRE-Final Inspection3/4/20193/4/20193/4/2019PCANC
DetailsJim Page
Per conversation with fire alarm contractor, fire alarm system is not ready for inspection. FIR permit for fire alarms needs to be finaled before life fire safety inspection can be completed, this request is cancelled.

jr Phone #: ###-####
BLD-Final2/28/20193/1/20193/1/2019PCANC
DetailsMike Jordan
Call 30 mins ahead of time. Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Framing/Rough-in2/21/20192/22/20192/22/2019PPASS
DetailsDave Hannah
Call 30 mins ahead, framing inspectipn of bar Phone #: ###-#### Inspection requested via web by Johnathon McGee
BLD-Framing/Rough-in2/14/20192/14/20192/15/2019PPASS
DetailsDave Hannah
upper level // JR Phone #: ###-####