Information based on query as of Thursday, May 2, 2024.
Permit Information
Permit NumberBLD19-01513
StatusFinaled
Name EVERGREEN CONSTRUCTION LLC
Site Address 11457 W TIOGA CT
Project Name11457 Tioga -Degitz Residence
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2740 sq. ft., two story (first story 1890 sq. ft., second story 850 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 230 sq. ft. of covered patio/porch and a 1302 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. ***AN NFPA 13D SPRINKLER SYSTEM IS BEING PROVIDED, AS NOTED ON DRAWING M.1*** LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/26/20203/27/20203/27/2020APASS
DetailsMike Jordan
Call when in route please. Thank you. Entry Code 4646 Phone #: ###-#### Inspection requested via web by Chris Laraway
DOC - Permit Finaled3/27/20203/27/20203/27/2020PPASS
DetailsMike Jordan
All issues have been resolved. Ok for perm occ.
BLD-Final3/2/20203/3/20203/3/2020APEND
DetailsMike Jordan
Final Fire inspection is pending. Bldg Corrections addressed. Please call Brad when on site. Garage Code 4646. Phone #: ###-#### Inspection requested via web by Chris Laraway. All issues on building portion resolved. Still needs to resolve fire sprinkler issues.
BLD-Final2/28/20202/28/20202/28/2020PFAIL
DetailsTell Riley
Fire Sprinkler Final this morning. Blower door test complete. Plans on Counter. Code 4646. Please Call Brad with status when complete. Thank you Phone #: ###-#### Inspection requested via web by Chris Laraway//corection notice posted--left with approved plans//
BLD-Wall cover12/5/201912/6/201912/6/2019PPASS
DetailsMike Jordan
Fire Sprinkler to re-inspect in the am. for Cover approval. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Energy code compliance12/6/201912/6/201912/6/2019PPASS
DetailsMike Jordan
Fire Sprinkler to re-inspect in the am. for Cover approval. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Framing/Rough-in12/6/201912/6/201912/6/2019PPASS
DetailsMike Jordan
Fire Sprinkler to re-inspect in the am. for Cover approval. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway
FIRE-Sprinkler Rough-in12/5/201912/6/201912/6/2019APASS
DetailsTroy Cobbley
Tenting inspection for the fire sprinklers passed. Piping can be covered. Call Brad before/during inspection. Thank you, Phone #: ###-#### Inspection requested via web by Chris Laraway
FIRE-Supply Line Cover12/5/201912/5/201912/5/2019PFAIL
DetailsTroy Cobbley
Tenting needs repaired in the second floor bedroom and I need access to the area above the ceiling in the garage room.

Shilo Sprinkler installed system, Marv''s Insulation Tented the lines. Please call Brad if there are any questions or issues to be addressed. Thank you.. Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Wall cover12/5/201912/6/201912/5/2019ACANC
DetailsMike Jordan
Sprinkler tenting inspection Thurs Afternoon. Cancel this inspection if Fire does not pass in the system. Please call Brad if there are any questions or other issues to be addressed. Thank you.. Phone #: ###-#### >> Inspection requested via web by Chris Laraway Inspection cancelled from web by: Chris Laraway
BLD-Framing/Rough-in12/3/201912/4/201912/4/2019ANR
DetailsMike Jordan
Framing Correction have been made. Insulation installed today. 3rd party Energy inspection tomorrow. We are Holding for cover approval. Call Brad with any missed corrections or items of concern. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway. A tenting inspection is still required for the fire sprinkler.
BLD-Framing/Rough-in12/2/201912/2/201912/2/2019PFAIL
DetailsMike Jordan
Framing/Energy inspection requested. All Subs have passed. Call Brad if there are questions or concerns. Thank you. Phone #: ###-#### Inspection requested via web by Chris Laraway. Complete lateral bracing on BG2, B13, b08, B07 trusses. Missed bearing on BG1 truss. Fireblock garage wall at fir down(plumbing chase). Provide two 2x under D10 2ply truss. Nail bottom chord of D10 2 ply per the engineering. Tempered glazing required in window in upstairs bathroom. Correction notice posted. Ok to insulate.
BLD-Wall Bracing11/1/201911/1/201911/4/2019PPART
DetailsDave Hannah
Plans on Site Phone #: ###-#### Inspection requested via web by Chris Laraway ok to cover ext but needs to install hold downs at rv garagr opennings
BLD-Wall Bracing10/31/201911/1/201911/1/2019ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Chris Laraway
BLD-Foundation8/27/20198/28/20198/28/2019APART
DetailsMike Jordan
Chris Phone #: ###-####
BLD-Footing8/23/20198/26/20198/26/2019APART
DetailsMike Jordan
Chris Phone #: ###-####
BLD-Footing8/23/20198/23/20198/23/2019PNR
DetailsMike Jordan
Chris Phone #: ###-####
BLD-Footing8/22/20198/23/20198/23/2019ACANC
DetailsMike Jordan
Chris Phone #: ###-####
BLD-Footing8/22/20198/22/20198/22/2019PCANC
DetailsMike Jordan
chris Phone #: ###-####-Chris cancelled insp will reschedule
BLD-Footing8/19/20198/19/20198/19/2019PCANC
DetailsMike Jordan
Chris Phone #: ###-####