Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberBLD19-02010
StatusFinaled
Name CARL FUNK CONSTRUCTION
Site Address 1447 N PINEVIEW LN
Project NameEncore Townhouses
Customer NumberEPLAN BLD19-02007
ePlanReview 
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** (TWO PERMITS FILED UNDER BLD19-02007) Permit for the construction of a new 1513 sq. ft., 2 story (first story 674 sq. ft., second story 839 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, 56 sq. ft. covered patio/porch and a 400 sq. ft. attached garage per the approved plans and any notations. C-1D zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20202/28/20202/28/2020PPASS
DetailsJim Storey
Jim Phone #: ###-####
DOC - Permit Finaled2/28/20202/28/20202/28/2020PPASS
DetailsJim Storey
BLD-Blower Door Test Results2/28/20202/28/20202/28/2020PDONE
DetailsJim Storey
Jim Phone #: ###-#### 4.93
BLD-Final2/24/20202/25/20202/25/2020AFAIL
DetailsMike Jordan
Carl Phone #: ###-####. Complete fire cauliking in garage and provide blower door test results.
BLD-Framing/Rough-in11/6/201911/7/201911/7/2019APASS
DetailsMike Jordan
sheet rock framing // Jim Phone #: ###-####
BLD-Framing/Rough-in10/24/201910/25/201910/25/2019APASS
DetailsMike Jordan
jim Phone #: ###-####
BLD-Energy code compliance10/25/201910/25/201910/25/2019APASS
DetailsMike Jordan
jim Phone #: ###-####
BLD-Wall cover10/24/201910/24/201910/24/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Framing/Rough-in10/24/201910/24/201910/24/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Framing/Rough-in10/21/201910/21/201910/21/2019PFAIL
DetailsMike Jordan
Complete lateral bracing on A3 trusses. Complete fireblocking on furdowns. Nail off all simpson hangars and provide fixes for trusses at entry way. Ok to insulate.
BLD-Framing/Rough-in10/18/201910/21/201910/21/2019ACANC
DetailsMike Jordan
JIM Phone #: ###-####. moved to pm inspection.
BLD-Framing/Rough-in10/15/201910/15/201910/15/2019PFAIL
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Conference9/30/20199/30/20199/30/2019PDONE
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Wall Bracing9/30/20199/30/20199/30/2019PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Wall Bracing9/27/20199/27/20199/27/2019AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//sthds in wrong locations//framing and nailing needs address at portal frames//window added in shear location at front entry//2 hr wall does not reflect plans//
BLD-Wall Bracing9/17/20199/18/20199/18/2019AFAIL
DetailsMike Jordan
Carl Phone #: ###-####. Needs to provide a full set of approved plans. Notes say there should be a total of eight pages of construction docs. Omly seven are provided. Wall bracing
BLD-Foundation8/16/20198/16/20198/16/2019PPASS
DetailsMike Jordan
stem wall // Willie Phone #: ###-####
BLD-Footing8/9/20198/12/20198/12/2019APASS
DetailsMike Jordan
Sergio Phone #: ###-####
BLD-Footing8/8/20198/9/20198/9/2019AFAIL
DetailsMike Jordan
Sergio Phone #: ###-####. Approved plans shows duplex 1hr. wall seoeration, per scope of work, townhouses are being constructed, which require a 2hr. seperation. Plans to be resubmitted.
BLD-Footing8/8/20198/8/20198/8/2019PFAIL
DetailsMike Jordan
surgeo Phone #: ###-####. No city approved plans on site.