Information based on query as of Saturday, May 4, 2024.
Permit Information
Permit NumberBLD19-04255
StatusIssued
Name CBH HOMES
Site Address 10043 W CAMPVILLE ST
Project NameLOT 07 BLK 11 UNION SQUARE SUB
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 2002 sq. ft., two story (first story 922 sq. ft., second story 1080 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 44 sq. ft. of covered patio/porch and a 456 sq. ft. attached garage per the approved plans and any notations. R-2D zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20202/28/20202/28/2020PPASS
DetailsBrandon Shaw
Front door is open Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Final2/26/20202/26/20202/26/2020PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. complete fire caulking in garage. repair sheet rock on house/garage seperation.
BLD-Blower Door Test Results2/26/20202/26/20202/26/2020PDONE
DetailsMike Jordan
4.9
BLD-Energy code compliance1/15/20201/16/20201/16/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/15/20201/16/20201/16/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Energy code compliance1/13/20201/15/20201/15/2020PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in1/13/20201/15/20201/15/2020PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle 2nd c/n posted .
BLD-Framing/Rough-in1/6/20201/13/20201/13/2020PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete airseal pak. Provide attic access in garage. F4 floor truss installed backwards. Provide (2) 2x under 2ply upstairs (behind tub). Correction notice posted. Ok to insulate.
BLD-Wall Bracing1/3/20201/6/20201/6/2020APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing1/2/20201/2/20201/2/2020PFAIL
DetailsMike Jordan
Sorry framer said no one was there with plans, they are here now. Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail sill plate with galvanized nails. Fasten all missed areas on sheathing. Install missed blocking and repair incorrect installed blocking.
BLD-Wall Bracing12/31/20191/2/20201/2/2020ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. No plans on site.
BLD-Foundation12/6/201912/9/201912/9/2019PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/5/201912/6/201912/6/2019PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/4/201912/5/201912/5/2019PNR
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing12/3/201912/4/201912/4/2019PNR
DetailsMike Jordan
Dane Phone #: ###-####