BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Brandon Shaw
|
|
|
Front door is open Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Final | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. complete fire caulking in garage. repair sheet rock on house/garage seperation.
|
BLD-Blower Door Test Results | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | DONE |
Mike Jordan
|
|
|
4.9
|
BLD-Energy code compliance | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Energy code compliance | 1/13/2020 | 1/15/2020 | 1/15/2020 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 1/13/2020 | 1/15/2020 | 1/15/2020 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle 2nd c/n posted .
|
BLD-Framing/Rough-in | 1/6/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete airseal pak. Provide attic access in garage. F4 floor truss installed backwards. Provide (2) 2x under 2ply upstairs (behind tub). Correction notice posted. Ok to insulate.
|
BLD-Wall Bracing | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Wall Bracing | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | FAIL |
Mike Jordan
|
|
|
Sorry framer said no one was there with plans, they are here now. Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail sill plate with galvanized nails. Fasten all missed areas on sheathing. Install missed blocking and repair incorrect installed blocking.
|
BLD-Wall Bracing | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. No plans on site.
|
BLD-Foundation | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|