Final | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Pool only final ok
|
Electrical Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
Rock A. Hudson
|
|
|
Wet nich potting compound Phone #: ###-#### Inspection requested via web by Emmet Bushman Rough in ok cover
|
Electrical Rough-In | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
James Ady
|
|
|
Pool bond grid on spa and pool Phone #: ###-#### Inspection requested via web by Emmet Bushman Equipotential bond ok
|
Electrical Rough-In | 6/29/2016 | 6/29/2016 | 6/29/2016 | P | PASS |
James Ady
|
|
|
Pool Bonding Phone #: ###-#### Inspection requested via web by Emmet Bushman Pool bonding only, Rough in ok to cover
|
Electrical Rough-In | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Rex Boyles
|
|
|
Pool bonding. Please arrive after 9:00 to give us time to install approved bonding clamps Phone #: ###-#### Inspection requested via web by Emmet Bushman rated clamps ok r/i bonding ok
|
Electrical Rough-In | 5/3/2016 | 5/5/2016 | 5/5/2016 | P | CANC |
Eric Story
|
|
|
Spa bonding inspection Phone #: ###-#### Inspection requested via web by Emmet Bushman not ready at tis time
|