Final | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Eric Story
|
|
|
Inspection outside building for final Phone #: ###-#### Inspection requested via web by Tom Betty Occ card signed-Final ok
|
Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PART |
Eric Story
|
|
|
Rooms storage 111 , corridor 110A , trash 112 , bicycle 113 , storage 114 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Areas as noted ok
|
Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PART |
Eric Story
|
|
|
Units 301 , 101 , 102 , 107 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Temp occ signed for finacing only no moving in at this point
|
Final | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PART |
Eric Story
|
|
|
Finals for units 307 , 306 , 201 , 206 , 207 , 208 Phone #: ###-#### Inspection requested via web by Tom Betty Units as requested ok
|
Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Eric Story
|
|
|
unit 106 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 106 ok to continue
|
Final | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PART |
Rock A. Hudson
|
|
|
Re- inspect units for finals ,breaker lock outs, wine room unit 205 and GFCI fix egress lights.Final parking garage .Grid ceiling 110A 1st corridor roughin and grid ceiling in parking Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units 103, 104, 105, 203, 204, 205 TCO ok, 302 lock outs in. Level 1 East egress light ok. Parking garage TCO ok Some items yet to complete for actual TCO. Site pole bases with exposed wiring. Not ready. Exterior not checked for final. Mechanical room- support sub-feed MCs, remove expose THHN above panels. Remove extension cord thru wall from temp office area in parking garage.
|
Electrical Rough-In | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Rock A. Hudson
|
|
|
Re- inspect units for finals ,breaker lock outs, wine room unit 205 and GFCI fix egress lights.Final parking garage .Grid ceiling 110A 1st corrridor roughin and grid ceiling in parking Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Basement elevator grid rough in ok cover. Level 1- 110(A) corridor grid rough in ok cover.
|
Final | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | NR |
Rock A. Hudson
|
|
|
Rough in Grid ceiling 2nd and corridor 109 1st . Finals 3rd, 2nd ,1st 109 floor corridors, Stairs 1, 2 , 3 and units 103 , 104 , 105 , 203 , 204 , 205 Phone #: ###-#### Inspection requested via web by Tom Betty Disconnecting means shall be provided for all hardwired appliances, hoods, furnaces, water heaters, microwaves, ovens. all units. 422.31. 105 bathroom GFCIs in-op. 205 no access to wine room, condencing unit for wine room not complete. out egress not complete east entance.
|
Electrical Rough-In | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Rock A. Hudson
|
|
|
Rough in Grid ceiling 2nd and corridor 109 1st . Finals 3rd, 2nd ,1st 109 floor corridors, Stairs 1, 2 , 3 and units 103 , 104 , 105 , 203 , 204 , 205 Phone #: ###-#### Inspection requested via web by Tom Betty Units noted TCO ok. Grid noted rough in ok cover
|
Electrical Rough-In | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Daryl DeGrange
|
|
|
3rd floor corridor drop ceiling and unit 302 final Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok cover 3rd floor corridor ceiling, unit 302 Final ok
|
Electrical Rough-In | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | PASS |
Eric Story
|
|
|
Bath floor heat unit 101 Call John Phone #: ###-#### Inspection requested via web by Tom Betty Both baths in unit 101
|
Electrical Rough-In | 12/23/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Eric Story
|
|
|
Floor heat unit 107 and outside trench Phone #: ###-#### Inspection requested via web by Tom Betty Floor heat unit 107@front U/G along ramp ok to cover
|
Electrical Rough-In | 12/12/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Eric Story
|
|
|
Bath room floor heat unit 207 Phone #: ###-#### Inspection requested via web by Tom Betty Unit 207 floor heat ok to cover
|
Electrical Rough-In | 12/4/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Eric Story
|
|
|
First floor hallway building B drop ceiling Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ceiling in 1st floor and unit 206 floor heat ok ot cover
|
Electrical Rough-In | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Eric Story
|
|
|
Floor heat units 301 and 201 call craig Phone #: ###-#### Inspection requested via web by Tom Betty Floor heat in units 201@301 ok to cover
|
Final | 11/21/2019 | 11/21/2019 | 11/21/2019 | A | CANC |
Eric Story
|
|
|
Final on unit 106 Phone #: ###-#### Inspection requested via web by Tom Betty No final given at this time
|
Electrical Rough-In | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Eric Story
|
|
|
Final on unit 106 Phone #: ###-#### Inspection requested via web by Tom Betty Unit 106 ok to stage furniture North corridor of 1st floor ok to cover
|
Electrical Rough-In | 11/20/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Eric Story
|
|
|
Bath floor heating unit 304 Phone #: ###-#### Inspection requested via web by Tom Betty Unit 304 floor heat ok to cover
|
Electrical Rough-In | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
James Ady
|
|
|
Unit 303 Floor Heat Contact Craig Timmons Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Floor heat only ok to cover
|
Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Mark Moncarr
|
|
|
Second floor hall drop ceiling Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover soffits 2nd floor. Get your tools on Betty!
|
Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Eric Story
|
|
|
Third floor hallway drop ceiling Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 3rd floor soffit hard lids only (suspended ceiling will be inspected on other dates)
|
Electrical Rough-In | 10/25/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Eric Story
|
|
|
Soffit unit 101 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 101 soffits ok to cover
|
Electrical Rough-In | 10/18/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Eric Story
|
|
|
Floor heat unit 104 and drop soffit unit 102 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Floor heat for unit 104 and drop ceiling in 102 ok to cover
|
Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 | A | PASS |
Eric Story
|
|
|
Floor heating units 105 and 205. Soffit unit 107 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units as requested ok to cover soffit and floor heat
|
Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Eric Story
|
|
|
soffit inspection room 207 "0" Phone #: ###-#### Inspection requested via web by Tom Betty Unit 207 soffit ok to cover
|
Electrical Rough-In | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Eric Story
|
|
|
Floor heating unit 203 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 204 not 203 as requested ok to cover floor heat
|
Electrical Rough-In | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Eric Story
|
|
|
Soffit unit 201 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 201 soffits ok to cover
|
Electrical Rough-In | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Eric Story
|
|
|
Soffits unit 202 , 206 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units 202,206,208 drop ceilngs ok to cover
|
Electrical Rough-In | 9/12/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Eric Story
|
|
|
Soffits units 303 and 304 Phone #: ###-#### Inspection requested via web by Tom Betty Units 303@304 siffits ok to cover
|
Electrical Rough-In | 9/9/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Eric Story
|
|
|
Soffit unit 301 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Soffits as requested ok to cover
|
Electrical Rough-In | 9/6/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Eric Story
|
|
|
Unit 302 bath room floor heating call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Floor heat in unit 302 ok to cover
|
Electrical Rough-In | 8/26/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Eric Story
|
|
|
Drop ceilings units 103 and 106 Phone #: ###-#### Inspection requested via web by Tom Betty Units as requested drop ceilngs ok to cover
|
Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Eric Story
|
|
|
Soffit units 104 and 105 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Soffits as requested ok to cover
|
Electrical Rough-In | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Eric Story
|
|
|
rough in sofit room 203 and 204 ron Phone #: ###-#### Inspection requested via web by Tom Betty Rooms 203@204 hard lid ceilings ok to cover
|
Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Eric Story
|
|
|
Unit 102 Call Ron Phone #: ###-#### Inspection requested via web by Tom Betty Unit 102 ok to cover
|
Electrical Rough-In | 7/29/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
Eric Story
|
|
|
Units 101 , 107 , trash rm. , bike rm. , storage , hall and drop ceiling 205 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units as requested ok to cover
|
Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Eric Story
|
|
|
Unit 207 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 207 ok to cover
|
Electrical Rough-In | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Eric Story
|
|
|
Units 201 , 202 , 208 , Comm rm 2nd floor and stairs #1 Phone #: ###-#### Inspection requested via web by Tom Betty Areas as requested ok to cover
|
Electrical Rough-In | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Eric Story
|
|
|
Unit 206 , corridor and stairs #2 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Unit 206 and 2nd floor corridor+stair 3 ok to cover
|
Electrical Rough-In | 6/21/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
Units 301 , 303 , 304 , trash rm and storage Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty All panels missing bushings on feeders. Areas noted and adding stair 1 level 1 rough in ok cover
|
Electrical Rough-In | 6/17/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Eric Story
|
|
|
Drop ceiling unit 302 , Phone #: ###-#### Inspection requested via web by Tom Betty Drop ceilng in unit 302 ok to cover thru-out
|
Electrical Rough-In | 6/14/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Eric Story
|
|
|
3RD floor hallway , lobby and comm rm. Phone #: ###-#### Inspection requested via web by Tom Betty 3rd floor drop ceilngs in lobby and comm room ok to cover
|
Electrical Rough-In | 5/28/2019 | 5/28/2019 | 5/28/2019 | A | CANC |
Eric Story
|
|
|
units 103 , 104 , 105 , 106 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Units as requested and stair 1@2 floors 2@3 ok to cover
|
Electrical Rough-In | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Eric Story
|
|
|
Inspection originally scheduled on ELE19-00903. Added her per Eric Story
|
Electrical Rough-In | 4/24/2019 | 4/25/2019 | 5/13/2019 | P | PASS |
Eric Story
|
|
|
Inspection originally scheduled on ELE19-00903. Added her per Eric Story
|
Temporary Service | 1/14/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Eric Story
|
|
|
Contact Craig Timmons Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek t/s u/g n ok
|