Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Mike Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
Final | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PART |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud TCO for training purposes only. Exterior egress lighting not complete on balcony. TCO ok
|
Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Inspect for TCO. Mike Hastings ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud 210.8(B)- All receptacles located in a commercial kitchen up to 50 amp single phase and 100 amp 3 phase 150 volts or less to ground shall have GFCI protection. 2-pole 20 for small oven. 408.4- Circuit directory shall be placed in each panel. 422.30- A disconnecting means shall be provided for all hard wired appliances. 9 ish needed.
|
Electrical Rough-In | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Rock A. Hudson
|
|
|
Inspect ceiling for cover Mike Hastings ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud Grid complete rough in ok cover
|
Electrical Rough-In | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PART |
Rock A. Hudson
|
|
|
Inspect grid ceilings for cover. Mike Hastings ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud 400.12- Flexible cords shall not be installed above ceiling grid. Remove extension cords for emp lighting. Grid boarders only rough in ok
|
Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud All full height walls complete, wall rough in ok cover
|
Conference | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | DONE |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Discussed if a GFCI device is allowed behind an appliance with wheels. If appliance is easily moved GFCI device is ok behind appliance. Also width of work space required for a panel board. As per 110.26(A)(2) a minimum of 30" or width of equipment is required. Lighting control panel mounted of left wall does not affect work space width of panel in question.
|
Electrical Rough-In | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Mike Phone #: ###-#### Inspection requested via web by Kevin Perez Back kitchen wall, office and closet to right walls and hardlid, S.W. corner lid rough in ok cover.
|
Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Back kitchen wall changing. Walls and soffits and bathrooms as noted on contractor print rough in ok cover.
|
Electrical Rough-In | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Rock A. Hudson
|
|
|
Please call Mike Inspection requested via web by Kevin Perez Exterior of outer wall only, and more kitchen walls as noted on contractor print rough in ok cover.
|
Electrical Rough-In | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PART |
Rock A. Hudson
|
|
|
Please call Mike H. Phone #: ###-#### Inspection requested via web by Kevin Perez Discussed if equipment grounding conductors were required to switch bank where box fill tight. Electrical engineer has drawn in equipment grounding conductors on print so will be required to be installed. kitchen walls and salad wall as noted on contractor print rough in ok cover
|