Permit Information
Permit NumberESC16-00156
StatusFinaled
Name LORELEI ADAMS
Site Address 11826 W TIOGA ST
Project NamePEPPERMILL ESTATES #2
Customer Number 
ePlanReviewNo
Description
(PEPPERMILL ESTATES #2) To conduct excavation of approximately cubic yards of earth to prepare for a new residential subdivision (future single family dwellings).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/12/201810/12/201810/12/2018 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/12/201810/12/201810/12/2018PPASS
DetailsMichael Zawacki
I removed witches hats that were left and left in grass by common area.
General Inspection8/27/20188/27/20188/27/2018 PASS
DetailsMichael Zawacki
Not ready for final, DI protection not removed from Sumpter & Hiawatha.
Pile of washout has been removed.
One vacant lot still in neighborhood with a pile of backfill.
General Inspection7/10/20187/10/20187/10/2018PPASS
DetailsAndy J. Long
Corrections needed to final out subdivision permit:

- remove DI bags at Sumpter and Hiawatha.
- clean up washout pile at Hiawatha and Heritage.
General Inspection6/5/20186/5/20186/5/2018PPASS
DetailsMichael Zawacki
Most homes completed. Neighborhood is landscaped and clean. DI protection still in place.
General Inspection5/8/20185/8/20185/8/2018PPASS
DetailsMichael Zawacki
WIP on condos, heading north west down gatewood. Storm water conveyance channel and seepage bed excavated but not finished. Some dirt on sidewalk from sprinkler installation crews. No loose trash on site, trash box available and maintained.
General Inspection4/16/20184/16/20184/16/2018 PASS
DetailsMichael Zawacki
WIP on duplexes. Inlet protection still in DIs, no issues on site.
General Inspection2/27/20182/27/20183/1/2018 PASS
DetailsAndy J. Long
No new SFH activity. Open lots still availaible. Subdivsion BMPs (DI bags, concrete washout) are still in place. No violations observed.
General Inspection1/12/20181/12/20181/16/2018 CANC
DetailsAndy J. Long
General Inspection11/27/201711/27/201711/27/2017PPASS
DetailsMichael Zawacki
Mostly complete. No violations.
General Inspection10/27/201710/27/201710/27/2017PPASS
DetailsMichael Zawacki
Neighborhood clean. SFH being sold.
General Inspection10/2/201710/2/201710/2/2017PPASS
DetailsAndy J. Long
WIP on SFHs in Peppermill phase II. Subdivsion storm drains have sediment protection. Individual sites have trash containment and permit signs posted. Approved.
General Inspection8/25/20178/25/20178/25/2017 CANC
DetailsAndy J. Long
General Inspection7/10/20177/10/20177/10/2017PPASS
DetailsAndy J. Long
WIP on SFHs by CBH. Need street sweeping after landscaping is complete on homes near completion of Hiawatha

No signifact trackout in subdivision, job sites have trash containment, and lined concrete washout pit has good capacity. Approved.
General Inspection6/19/20176/19/20176/19/2017 CANC
DetailsMelissa Jannusch
General Inspection5/3/20175/3/20175/3/2017PPART
DetailsAndy J. Long
BMPs installed (DI protection, lined washout, site trash containment). Some trackout between vacant lots on Sumpter and Hiawatha need to have street sweeping
General Inspection3/27/20173/27/20173/27/2017 CANC
DetailsMelissa Jannusch
General Inspection2/8/20172/9/20172/9/2017PPART
DetailsMelissa Jannusch
Corrections requested: Clean trash on sidewalk, remove dirt from side walk, clean out DI bags

Talked with Brett (RP) on site. He plans to work on corrections.
General Inspection12/26/201612/26/201612/28/2016 CANC
DetailsAndy J. Long
General Inspection11/9/201611/9/201611/9/2016APASS
DetailsAndy J. Long
Subdivsion BMPs installed. No significant trackout or loose dirt on impermeable suraces Permit signs posted at individual sites. RP on site daily

Corrections to remove silt fence and pick up trash along the creek/ditch have been completed.
Discussion to consider providing trash box for foundation waste.
General Inspection10/21/201610/21/201610/21/2016PPART
DetailsAndy J. Long
SFHs in progress. Silt fence installed, sediment filter bags. Individual homes permitted seperately by CBH.

Correction request:
- pick up windblown trash from construction activity along the 8 mile creek path and silt fence.

Note: Peppermill phase #1 ESC permit ESC13-01159 has been finaled.
General Inspection9/13/20169/13/20169/13/2016PPASS
DetailsEvan Jenkins
No issues observed
General Inspection8/15/20168/15/20168/15/2016PPASS
DetailsAndy J. Long
Common areas around Tioga culdesac have been landscaped with sod and trees. All DIs in new phase have inlet protection.

Silt fence is still installed along 8 mile creek between both phases of Peppermill from Hollandale to Peconic. Silt fence should be removed once the southeast portion of path shoulder are stabilized/landscaped. No immediate corrections, will continue to monitor. No SFH construction in phase 2 yet.
General Inspection5/12/20165/12/20165/12/2016AFAIL
DetailsJim Little
>some cleanup has been performed.
>additional cleanup still needed at Heritage and Hiawatha, plus waddell repairs.
General Inspection5/9/20165/9/20165/9/2016AFAIL
DetailsAndy J. Long
Sheet flow from weekend thunderstorms has carried lots of sediment and dirt on the streets of both phases of Peppermill.

CBH homes also source of lot of runoff.

Corrections needed:
- clean out DI bags on Hollandale outside of the sub and sweep gutter.
- sweep streets when wind has decreased.
- get water truck on site.
- do maintenance on all DIs in Peppermill.

Corrections issued to Trilogy and CBH
General Inspection4/25/20164/25/20164/25/2016PPASS
DetailsAndy J. Long
No activity at time of inspection for Peppermill #2. Trackout and other materials from initial phase of construction is complete. Sidewalk and gutte now complete, roads not yet paved. Permit and SwPPP on site. Silt fence and buffer area for creek/ditch is in good condtion.
General Inspection4/11/20164/11/20164/11/2016PPASS
DetailsAndy J. Long
WIP at Peppermill Estates #2. Future roads have been graded, utilities and infrastructure being installed, no paving yet. No trackout, permit posted, no fugitive dust issues at time of inspection, BMPs installed, no corrections at this time.
BMP Violation3/8/20163/15/20163/16/2016APASS
DetailsAndy J. Long
Check for construction entrance installation

Construction entrance installed with 2-3 inch rock. Sweeper unit now kept on site. No trackout observed and conditions are wet/muddy within site. DI bags installed. Silt fence and vegetative buffer along creek are undisturbed.
General Inspection3/8/20163/8/20163/8/2016PPART
DetailsAndy J. Long
Permit sign posted. Silt fence and vegetative buffer preservation have been installed per ESC site plan and SF is trenched properly. New DI bags installed on inlets with potential to receive stormwater.

Construction entance is not installed in location where dump/haul trucks will use. No major trackout, but will be very bad in wet conditions. Request to install construction entrance per construction sheet details and use signage and/or training to driver/haulers to utilize it to prevent trackout issues

No site prep inspection/notification requested prior to earth disturbance and after permit issuance.