Permit Information
Permit NumberESC16-01332
StatusFinaled
Name ANGELA GILMAN
Site Address 2276 W HILL TERRACE LN
Project NameNorth Hill Sub
Customer Number 
ePlanReviewNo
Description
New 4-Unit Townhouse
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/7/201711/7/201711/8/2017 PASS
DetailsAndy J. Long
North Hill townhome complete. Main site permit and active townhomes permitted seperately. BMPs to remain installed. No corrections.
DOC - Permit Finaled11/8/201711/8/201711/8/2017PPASS
DetailsAndy J. Long
General Inspection10/23/201710/23/201710/23/2017 PASS
DetailsMichael Zawacki
Site is dirty but self contained. WIP on new townhome.
General Inspection10/6/201710/6/201710/10/2017 PASS
DetailsMichael Zawacki
Needs house keeping. Wattles are worn, DI bags need to be removed, emptied, and reinstalled. Some trackout but none is leaving site. Floor coting and roof material buckets were stored next to storm drain. Some loose trash. Site is self contained.
General Inspection9/21/20179/21/20179/22/2017 PASS
DetailsAndy J. Long
No discharges or trackout. Trash contained. No corrections for North Hill subdivision
General Inspection9/6/20179/6/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/22/20178/22/20178/22/2017 CANC
DetailsAndy J. Long
General Inspection8/4/20178/4/20178/4/2017 PASS
DetailsAndy J. Long
General Inspection7/20/20177/20/20177/20/2017 PASS
DetailsAndy J. Long
WIP on interior at North Hill townhome. No trackout or discharges to Hill Road., Trash container onsite is maintained. Subdivision storm drains have sediment filter bags installed.

RP on duty. Need to continue weekly gutter sweep and trash pickup around active homes.
General Inspection6/30/20176/30/20176/30/2017 PASS
DetailsAndy J. Long
General Inspection6/14/20176/14/20176/15/2017 CANC
DetailsAndy J. Long
see ESC15-00853 for inspection activity at North Hill subdivision. This is individual townhome permit
Site Preparation12/12/201612/12/201612/12/2016PPASS
DetailsAndy J. Long
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.

See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.