Site Final | 11/17/2017 | 11/21/2017 | 11/22/2017 | P | PASS |
Andy J. Long
|
|
|
Site landscaped, BLD finaled. No ESC corrections. 1 remaining home out of 4 on Melrose is still active, See ESC16-01479
|
Aging Inspection | 11/16/2017 | 11/16/2017 | 11/17/2017 | | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 6/16/2017 | 6/19/2017 | 6/21/2017 | A | PASS |
Melissa Jannusch
|
|
|
Trash contained, no trackout, signs are posted. Concrete slurry in dirt alleyway. Slurry not in danger of running off into a storm drain. Alley is to be paved soon as well. Area is flat large field behind project. No corrections issued at the time of inspection.
1209 Melrose; drainage issue; jason ###-####
|
General Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Andy J. Long
|
|
|
follow up inspection
Concrete washout containment now provided onsite. Slurry pile cleaned up. No new corrections.
|
Complaint Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | FAIL |
Andy J. Long
|
|
|
No washout containment provided for foundation crew. Spilled slurry and aggregate in unpaved driveway.
RP to clean up today and provide lined designated washout for remaining cement work.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
Foundations poured. Sediment contained on site. Sign is posted. No ESC issues observed. Project okay.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Melissa Jannusch
|
|
|
Foundations poured. No ESC issues observed. Signs are posted.
|