Permit NumberESC16-01617
StatusFinaled
Name TRENTON BUSTER
Site Address 7031 S FEDERAL WAY
Project NameSE BOISE BOAT AND RV STORAGE
Customer Number 
ePlanReviewNo
Description
See Grading Permit for project description. ESC plan submitted for City of Boise requirements. SWPPP will need to be developed for CGP requirement due to area of disturbance listed. Silt fence perimeter to be installed on the west and north site limit, stabilized construction entrance to prevent trackout to the Federal Way. Post permit sign at entrance. Will need to protect permeable paver and storm drain system after installation. Concrete washout to be provided on site. ESC site preparation inspection required, call 608-7070
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/21/20182/21/20182/21/2018PCANC
DetailsMichael Zawacki
DOC - Permit Finaled2/21/20182/21/20182/21/2018PPASS
DetailsMichael Zawacki
General Inspection1/9/20181/9/20181/9/2018 CANC
DetailsAndy J. Long
General Inspection11/8/201711/8/201711/8/2017PPASS
DetailsMichael Zawacki
Entire work area now paved. Landscaping in process on frontage road. All onsite storage is on paved areas.
General Inspection10/12/201710/12/201710/12/2017PPASS
DetailsMichael Zawacki
Perimeter loop paved. Entrance and exit are now paved road. Steel buildings are being erected on all poured pads. Steep slopes are protected and are in process of being stabalized with rocks. Area clean and free of trash. Central area is compacted and no visible dust blowing.
General Inspection8/31/20178/31/20178/31/2017 CANC
DetailsAndy J. Long
General Inspection6/29/20176/29/20176/30/2017PPASS
DetailsMelissa Jannusch
No WIP during time of inspection. Area is graded and construction entrance has been removed. Construction entrance should be re installed once work continues.
General Inspection5/22/20175/22/20175/22/2017APASS
DetailsMelissa Jannusch
WIP on excavation. Entrance is working to prevent trackout. Perimeter BMPs are in good conditions. No corrections.
Site Preparation3/6/20173/7/20173/7/2017PPASS
DetailsMelissa Jannusch
BMPs are all installed. okay to start