Site Final | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No corrections required, ESC permit finaled.
|
General Inspection | 9/15/2017 | 9/15/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Andy J. Long
|
|
|
WIP. Trash container has been serviced. No trackout or spills around site. No DI bag installed below home, but perimeter wattle is installed and working well to contain unstabilized yard.
|
General Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP. Trash contained no trackout.
|
General Inspection | 4/5/2017 | 4/12/2017 | 4/13/2017 | A | PASS |
Melissa Jannusch
|
|
|
WIP on foundation. Concrete washout is in use. Perimeter controls are maintained. No uncontained trash in subdivision project ok. No corrections requested.
|
General Inspection | 4/3/2017 | 4/4/2017 | 4/5/2017 | P | PART |
Melissa Jannusch
|
|
|
Project started without site preparation inspection. BMPs are installed. Sign is posted. DI bags are ok. Project ok to continue.
|