Site Final | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No temp BMP removal required.
|
General Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work and landscaping complete.
|
General Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | | PASS |
Michael Zawacki
|
|
|
Home is nearing completion. Landscaping is done, no ground disturbances.
|
General Inspection | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on insterior. Needs landscaping. Trash contained, sidewalk and gutter clean. Storm drain has sediment protection.
|
General Inspection | 4/20/2018 | 4/20/2018 | 4/20/2018 | | PASS |
Michael Zawacki
|
|
|
Work on exterior of home complete. Landscaping hasn't begun.
|
General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/21/2018 | 3/21/2018 | 3/21/2018 | | CANC |
Andy J. Long
|
|
|
No inspection. East Valley sub inspected 3/20; subdivision BMPs implemented. This home not yet complete and stabilized.
|
General Inspection | 3/6/2018 | 3/6/2018 | 3/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2018 | 2/19/2018 | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. Trash box needs to be emptied.
|
General Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | | PASS |
Andy J. Long
|
|
|
Framing in progress. Trash container onsite, storm drains have sediment protection. Approved
|
Site Preparation | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | CANC |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Clint Phone #: ###-####
Permit sign posted. Subdivision BMPs installed. Active sites have trash containment. No trackout or dischargs observed around East Valley.
|