Site Final | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No temp BMP removal required.
|
General Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work and landscaping complete.
|
General Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | | PASS |
Michael Zawacki
|
|
|
Home is nearing completion. Landscaping is done, no ground disturbances.
|
General Inspection | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on insterior. Needs landscaping. Trash contained, sidewalk and gutter clean. Storm drain has sediment protection.
|
General Inspection | 4/24/2018 | 4/24/2018 | 4/25/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on interior. Outside is clean and contained.
|
General Inspection | 4/9/2018 | 4/9/2018 | 4/9/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Site is clean, trash has been picked up and removed.
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | | PART |
Michael Zawacki
|
|
|
WIP. Trash box is overflowing.
|
General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | | PASS |
Andy J. Long
|
|
|
Framing in progress. Trash container onsite, storm drains have sediment protection. Approved
|
Site Preparation | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | PASS |
Melissa Jannusch
|
|
|
okay to start
Clint Phone #: ###-####
|