Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC17-00625
StatusFinaled
Name MICHAEL MCHARGUE
Site Address 6022 N ROE ST
Project NameRoe Street Townhomes
Customer Number 
ePlanReviewNo
Description
Excavation, utilitiy installation, site grading, onsite storm water retention/shallow injection. SWPPP submited, NOI filed CGP tracking # IDR10006A. Discharge potential to Boise Valley Canal. Flat site, BMPs include heavy duty construction entrance, staging area with trash containment and concrete washout, protect newly installed swales, and fugitive dust control. Townhomes to be permitted seperately. This is main site ESC permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/18/20193/18/20193/18/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled3/18/20193/18/20193/18/2019PPASS
DetailsMichael Zawacki
General Inspection2/14/20192/14/20192/14/2019 CANC
DetailsMichael Zawacki
General Inspection1/14/20191/14/20191/14/2019 PASS
DetailsMichael Zawacki
No new activity. Someone has driven through a few lots. No major issues.
General Inspection12/12/201812/12/201812/12/2018PPASS
DetailsMichael Zawacki
No new activity at site.
General Inspection11/14/201811/14/201811/14/2018PPASS
DetailsMichael Zawacki
No new activity at site. No issues with lots, no trackout or runoff.
General Inspection10/19/201810/19/201810/19/2018PPASS
DetailsAndy J. Long
All roads paved, common areas are in process of landscaping. No trackout or loose debris on impervious surfaces, storm drain inlets have sediment filter bags installed.
General Inspection9/20/20189/20/20189/21/2018 PASS
DetailsAndy J. Long
No acitivity. No dirt or discharges leaving site.
General Inspection8/20/20188/20/20188/20/2018 PASS
DetailsMichael Zawacki
No new work
General Inspection7/19/20187/19/20187/19/2018 PASS
DetailsMichael Zawacki
Landscapers on site working on southern edge, some dust. No new site work and no building begun.
General Inspection6/18/20186/18/20186/18/2018PPASS
DetailsMichael Zawacki
No workers or equipment on site. All phase 1 curb, gutter, sidewalk, and roads complete. No ESC issues. Sites are bare, weeds starting to grow.
General Inspection4/30/20185/17/20185/17/2018APART
DetailsMichael Zawacki
Curb, gutters, sidewalk, and road complete. Lots of trackout on site, was noted in Swppp inspection. No dirt leaving site. Sweeper attatchment on site.
General Inspection4/27/20184/30/20184/30/2018APASS
DetailsAndy J. Long
Subdivsion roads now paved. Crew working on installing curb and gutter on Roe Street. No vertical construction occuring. No trackout from site observed. Somes areas vegetating naturally, no wind blown dust observed at time of inspectcion. Project not under construction in May will need hydroseed or tacifier application.
General Inspection4/24/20184/24/20184/27/2018 CANC
DetailsAndy J. Long
rescheduled
Random Inspection3/22/20183/22/20183/22/2018PPEND
DetailsMichael Zawacki
Bringing in road mix for road bed. Some trackout across Roe and down Lamplight.
Complaint Inspection3/1/20183/1/20183/1/2018PPASS
DetailsAndy J. Long
No activity. Permit sign posted, SWPPP binder & site map onsite. No trackout or discharges.

Notified RP they need to pick up trash around site and get a trash bin onsite for road crew.
Random Inspection2/5/20182/5/20182/5/2018PPASS
DetailsMichael Zawacki
Sidewalk and curb installed in places. No workers on site. Some track out from people joyriding througjh graded area.
Random Inspection11/16/201711/16/201711/16/2017PPASS
DetailsMichael Zawacki
Site being prepped for paving, curb, gutter, and sidewalks.
General Inspection10/19/201710/19/201710/19/2017APASS
DetailsMichael Zawacki
Dewatering currently going on. Pumping into a seepage bed with no outlets, water filtering through ground. Syman is doing inspections. Site is in good condition.
General Inspection7/19/20177/19/20177/19/2017PPASS
DetailsAndy J. Long
No activity at Roe St. Townhomes. Permit and SWPPP info posted. No trackout, from site. No wind blown dust issues observed or reported.
General Inspection5/31/20176/7/20176/6/2017APASS
DetailsMelissa Jannusch
Met RP on site and walked through dewatering set up and plan. Well pumps are currently begin set. The water will run through a ditch to a sedimentation pond, then flow into a stormwater pond, then overland flow through a field that is the next stage of development, then into the canal drainage ditch. This set up should be sufficient to settle sediment particles in the dewatering water. okay to begin dewatering.
General Inspection6/2/20176/2/20176/2/2017PPASS
DetailsMelissa Jannusch
No WIP. Dewatering has not started yet.
General Inspection5/25/20175/31/20175/31/2017PCANC
DetailsMelissa Jannusch
rescheduled
Tracking Control5/22/20175/23/20175/24/2017PPEND
DetailsAndy J. Long
initial trackout cleaned up. Need to have another sweeper this week after hauling is done. Loose sediment and dust on Roe and at Roe & State Street. Restrict access out of site only through the rock construction entrance.
Site Preparation5/22/20175/22/20175/22/2017APART
DetailsAndy J. Long
Permit now in issued status as requested. Construction entrance and silt fence along north property line protecting ponds is installed. Permit sign and SWPPP info posted. Hauling operation to bring in dirt is occuring. Water truck on site being used for dust control.

Correction request:
- street sweeping is required at end of day or tomorrow to address trackout issues at Roe Street and on Bogart from Silvercloud.

Voicemail left with RP Michael.