Aging Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | | PASS |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/19/2017 | 9/21/2017 | 9/22/2017 | A | PASS |
Andy J. Long
|
|
|
Permit posted. MS4 inlet has coir mat filter installed. No muddy runoff. Approved.
|
General Inspection | 9/13/2017 | 9/15/2017 | 9/19/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/31/2017 | 9/5/2017 | 9/13/2017 | P | PASS |
Andy J. Long
|
|
|
RP responded to request. Swept site and installed DI protection as requested.
|
General Inspection | 8/28/2017 | 8/30/2017 | 8/31/2017 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/24/2017 | 8/28/2017 | 8/28/2017 | A | PEND |
Andy J. Long
|
|
|
Corrections in progress.
Street has been swept, permit sign posted.
RP to install storm drain sediment protection today and is planning to move stockpile away from corner adjacent to the storm drain.
|
General Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | FAIL |
Andy J. Long
|
|
|
Correction notice posted:
- provide storm drain sediment protection. - sweep site entrance - address stockpile in front yard - provide valid RP contact
Notice posted on site with call back info. Will follow up 8/28
RP Jim ###-####
|
General Inspection | 8/18/2017 | 8/22/2017 | 8/24/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/10/2017 | 8/10/2017 | 8/18/2017 | P | CANC |
Andy J. Long
|
|
|
|