General Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/8/2018 | 6/8/2018 | 6/11/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/24/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Andy J. Long
|
|
|
front slope revegetating. No erosion rills or evidence of sediment runoff observed.
|
Random Inspection | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Work done, front yard has been landscaped. Waiting for stabalization.
|
Random Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP on landscaping. No dirt leaving site.
|
Random Inspection | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP. No runoff or trackout. Gator guard protecting lower perimeter.
|
Random Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP. Driveway has been removed. No runoff observed.
|
Random Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
BMPs in place and site clean. Talked to contractor, they are planning on relocating driveway, adding some landscape rock, and reseeding in the next ten days.
|
General Inspection | 7/3/2017 | 7/10/2017 | 7/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 6/30/2017 | 7/3/2017 | 7/3/2017 | A | PART |
Melissa Jannusch
|
|
|
WIP. Gator guards are on site but installed incorrectly. No trackout, runoff, trash is contained, no other ESC issues.
Gator guards need to be trenched in.
|
Site Preparation | 6/28/2017 | 6/29/2017 | 6/30/2017 | A | CANC |
Andy J. Long
|
|
|
Rader Phone #: ###-####
rescheduled. Approved for construction
|