Permit Information
Permit NumberESC17-01126
StatusFinaled
Name TIMOTHY R NAU
Site Address 529 S 15TH ST
Project Name15th & River St Condominiums
Customer Number 
ePlanReviewNo
Description
Bldg 1 & 2: (per AJL this permit to cover GRD18-00032, BLD17-03010, BLD17-03009) An elevated three-story complex containing 10 condominium units divided between two buildings. ESC plan with narrative and site map approved. Construction access via existing alley way. Perimeter sediment controls (fiber rolls) around full site. Pollution prevention BMPs (concrete washout) required. Pre-construction site preparation inspection required. See also ESC17-01127
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/10/20204/13/20204/17/2020PPASS
DetailsAndy J. Long
Project is complete, landscaped, and stablized. No temporary BMPs, debris, or construction materials left behind.
General Inspection4/10/20204/10/20204/10/2020 CANC
DetailsAndy J. Long
General Inspection2/21/20202/24/20202/28/2020APASS
DetailsAndy J. Long
General Inspection1/24/20201/27/20201/31/2020PPEND
DetailsAndy J. Long
No discharges. More clean up needed, site needs to dry out.
Conference1/23/20201/24/20201/24/2020ADONE
DetailsAndy J. Long
Spoke with RP Tim:

- concrete washout ecopan is located on 15th and Grand, 1 block NE of site.
- Next week the center area will be blocked off for parking and work on onsite seepage bed will begin.

Corrections discussed:
- trash pick up around site
- protect new DIs installed on 15th
- clean curbs and gutters once all areas are complete
- provide washout tub for paint and other rinsed materials

Follow up inspection Monday1/27 PM
General Inspection1/21/20201/21/20201/23/2020 FAIL
DetailsAndy J. Long
Violations/non-compliance:

- loosh trash scattered around site and not in a container
- no concrete washout or tubs of liquid waste and rinse activities on site.
- lots of mud around perimeter curbing. New storm drain grates do not have sediment protect, sumps will need to be mucked out (appears DIs are not yet connected to system)
- workers parking in mud bog between two buildings.
- some trackout to alley.

Correction requests:

- pick up all loose trash and put in trash bin or haul away
- provide tubs for rinsing activities; prohibit tossing buckets of rinse on ground
- provide concrete washout
- clean up mud and debris in gutters, sidewalk, and temporary pedestrian walk

Conference scheduled with RP
General Inspection12/6/201912/6/201912/6/2019 PASS
DetailsMichael Zawacki
WIP. SIte is fenced n and clean, no issues.
General Inspection10/21/201910/21/201910/21/2019 PASS
DetailsMichael Zawacki
All contained in fenced in area. Nothing leaving site.
General Inspection9/3/20199/3/20199/3/2019 PASS
DetailsMichael Zawacki
Site is fenced and contained. Nothing leaving perimeter.
General Inspection7/19/20197/19/20197/19/2019 PASS
DetailsAndy J. Long
General Inspection6/3/20196/3/20196/3/2019 PASS
DetailsAndy J. Long
WIP. Minimal trackout. No discharges. Perimeter controls installed.
General Inspection4/16/20194/16/20194/17/2019 PASS
DetailsAndy J. Long
General Inspection3/1/20193/1/20193/1/2019 PEND
DetailsMichael Zawacki
Pump truck on site, entrance pretty compacted. Will need to watch for track out.
General Inspection1/14/20191/14/20191/14/2019 PASS
DetailsAndy J. Long
No trackout or discharges. BMPs installed. No corrections.
General Inspection11/27/201811/27/201811/28/2018PPASS
DetailsMichael Zawacki
Site clean and contained. Privacy fence and perimeter controls installed. Nothing leaving site.
General Inspection10/29/201810/29/201810/29/2018 PASS
DetailsMichael Zawacki
No workers on site, area fenced off with locked gate. No ESC issues observed, wattle around perimeter, ends overlap and are ziptied. Gravel bags in gutter. No trash or dirt leaving site.
Site Preparation9/10/20189/11/20189/11/2018APASS
DetailsAndy J. Long
Permit posted. BMPs installed. RP ordered Site Preparation inspection.

DI bag on 15th, perimeter wattlle properly installed. WIP on placing foundation forms.

Request to have lined/leakproof concrete washout onsite or prohibit onsite washout.