Permit Information
Permit NumberESC17-01172
StatusFinaled
Name DARRELL GOGERT
Site Address 11255 W FAIRVIEW AVE
Project NameICCU Fairivew Branch
Customer Number 
ePlanReviewNo
Description
New 6,500 SF Idaho Central Credit Union to be constructed on block 1 lot 5. The building consists of brick and metal panel, with screening methods of landscaping and decorative panels used to beautify the drive-thru along Fairview Ave.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/29/201810/29/201810/29/2018PPASS
DetailsAndy J. Long
Project complete. Staging area cleaned and DI bags on Steelwood and Gabrielle have been removed as requested.
Site Final10/1/201810/1/201810/1/2018PNR
DetailsAndy J. Long
Temporary BMP storm drain bags left installed. Project is stabilized, building is complete and open for businees.

Correction request to RP Darrell remove DI bag on Steelwood and Gabrielle.
General Inspection9/11/20189/11/20189/11/2018PPASS
DetailsMichael Zawacki
Building and landscaping all complete. After work on interior is finished and job trailer removed will check for final.
General Inspection7/27/20187/27/20187/27/2018PPASS
DetailsAndy J. Long
WIP on interior. Shell complete. Parking lot curbs have been poured but not yet paved. No trackout to Shamrock or Fairview. No correcitons requested.
General Inspection6/22/20186/22/20186/22/2018PPASS
DetailsMichael Zawacki
No trackout from employee parking.mBank site is clean, nothing leaving site.
Random Inspection6/8/20186/8/20186/8/2018PPART
DetailsMichael Zawacki
Observed large clouds of dust as driving past. Dust was coming from workers dumping mix into mortar mixer, dissapated as soon as they were finished pouring mix in.
General Inspection5/24/20185/29/20185/30/2018PCANC
DetailsAndy J. Long
Tracking Control5/18/20185/23/20185/24/2018APART
DetailsAndy J. Long
see if trackout from employee parking area is cleaned up and construction entrance installed.

Trackout cleaned up. Storm drain sediment bags installed on both sides of Steelwood have remainng capacity.

No construction entrance installed as requested. Main site entrance entrance needs maintenance. Dry conditions currently.
Tracking Control5/18/20185/18/20185/18/2018AFAIL
DetailsAndy J. Long
No trackout from main site. Significant trackout from employee parking area across the street (Steelhead)

Verbal correction request to RP Darrell to clean up trackout and install construction entrance or implement on street parking only
Random Inspection5/8/20185/8/20185/8/2018PPASS
DetailsMichael Zawacki
Site is clean and free from dust or trackout. Everything inside work area is stored neatly and clean. Only issue is DI on west side of road is nearlt full, talked with foreman on site.
General Inspection4/26/20184/27/20184/30/2018APASS
DetailsAndy J. Long
Permit sign posted. No trackout from site. Perimeter constrols installed. No fugitive dust observed.
General Inspection4/4/20184/4/20184/4/2018PPEND
DetailsMichael Zawacki
WIP on steel frame. Stockpile contained on site. DI protection in front of bank needs to be changed. Some trackout from parking area across street.
General Inspection1/19/20181/30/20181/30/2018APASS
DetailsMichael Zawacki
WIP. Some trackout. GC has sweeper scheduled and is working with ACHD to keep Fairview clean.
Random Inspection1/24/20181/24/20181/24/2018PPASS
DetailsMichael Zawacki
Lots of trackout. Sweepers are scheduled for the end of work days. Contractor working with ACHD to keep fairview clean.
General Inspection1/19/20181/19/20181/19/2018PCANC
DetailsAndy J. Long
data entry error
Site Preparation1/19/20181/19/20181/19/2018PPASS
DetailsAndy J. Long
1:30 Darrell

Construction entrance installed. ESC plan in trailer. DI bag installed on Steelwood. RP to install bag on east side of Steelwood. New construction entrance will be installed for access to Gabrielle. Will use lining and rock for new entrance and install DI bag. No silt fence required, grade of lot is below all surrounding roads and MS4 drains.
Site Preparation1/19/20181/19/20181/19/2018ACANC
DetailsAndy J. Long