Site Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/27/2018 | 11/27/2018 | 11/27/2018 | | PASS |
Michael Zawacki
|
|
|
Mason is finishing entry way. All landscaping and other exterior work complete.
|
General Inspection | 11/12/2018 | 11/12/2018 | 11/13/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PASS |
Michael Zawacki
|
|
|
Interior work. Yard still needs to be landscaped. Driveway and all sidewalks installed.
|
General Inspection | 10/11/2018 | 10/11/2018 | 10/12/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2018 | 9/26/2018 | 9/26/2018 | | PART |
Michael Zawacki
|
|
|
WIP. Hillside BMPs in place behind house. Some trash has blown below house, area needs cleanup.
|
General Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | | PASS |
Andy J. Long
|
|
|
Inpsected 9/10 PM. No ESC issues, home is framed and flat work poured.
|
General Inspection | 8/24/2018 | 8/24/2018 | 8/24/2018 | | PASS |
Michael Zawacki
|
|
|
Home is framed. Some material stored on sidewalk.
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/10/2018 | | PASS |
Andy J. Long
|
|
|
WIP on frame. No trackout or loose trash. Permit posted.
|
Site Preparation | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit sign posted at upper end of lot. Trash box provided. Rear slope has been recently seeded and a sprinkler line installed to water the new vegetation.
Approved for construction.
|