Permit Information
Permit NumberESC17-01386
StatusFinaled
Name JOSE BAUTISTA
Site Address 367 N ANCESTOR PL
Project NameEpisciences Manufacturing Faci
Customer Number 
ePlanReviewNo
Description
PROJECT INCLUDES SITE IMPROVEMENTS AND CONSTRUCTION OF A NEW 18,446 sf MAKEUP MANUFACTURING & OFFICE FACILITY. EXTERIOR CONSTRUCTION MATERIALS CONSIST OF CONCRETE TILT WITH ACCENT PIECES AS SHOWN, GLAZING AND STEEL CANOPIES.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/4/20191/9/20191/9/2019PPASS
DetailsMichael Zawacki
General Inspection12/28/20181/2/20191/4/2019PCANC
DetailsAndy J. Long
rescheduled for site final
General Inspection12/28/201812/28/201812/28/2018 CANC
DetailsAndy J. Long
General Inspection11/12/201811/12/201811/13/2018 PASS
DetailsMichael Zawacki
Work complete, parking lot and landscaping done. All materials from next door lot removed. OK to final when building permit closed.
General Inspection9/26/20189/26/20189/27/2018 PASS
DetailsMichael Zawacki
Parking lot is paved and landscaping completed. All work is now in building, dumpster in parking lot. Most material removed from adjacent lot where job trailer is parked.
General Inspection8/6/20188/6/20188/6/2018PPASS
DetailsMichael Zawacki
Building is up, curbing in place, parking area prepped for paving. Some landscaping in place. All material storage contained on site.
Old washout can be cleaned.
General Inspection5/9/20185/9/20185/9/2018PPASS
DetailsMichael Zawacki
Tilt up walls done. Site is clean, trusses and materials all stored on site. All trash is going into garbage trailer. Some spilled washout still in area of washout. Nothing is leaving site.
General Inspection4/10/20184/10/20184/10/2018PPASS
DetailsMichael Zawacki
Slab was poured yesterday. Pump truck washed out in vicinity of washout area, foreman will get it cleaned up. Sweeper comes through and keeps parking lots clean. Track utilities is on site and has a saw cut area of pavement, they plan on patching when work completed.
General Inspection1/30/20182/20/20182/21/2018PPASS
DetailsAndy J. Long
WIP on grading and excavation for foundation. No concrete work yet. Construction entrance installed, no trackout. Recieving storm drains have sediment inlet filters. Permit sign posted on job trailer.

Approved
Site Preparation1/30/20181/30/20181/30/2018PPASS
DetailsAndy J. Long
Jose ###-####

RP Jose Bautista on site for inspection. BMPs installed include:

5 storm drain inlets (3 in private parking lot) and two on Ancestor Place culdesac installed.

- construction entrance with geotextile lining and angular rock.

- construction limits have been fenced off with orange fence. Perimter vegetation outside of limits to be preserved.

- no surface waters or ditches adjacent or on site.

Approved for excavation.