General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | PASS |
Andy J. Long
|
|
|
Construction appears complete. Rock retaining walll installed. Yard is not landscaped, though weeds and grasses are starting to establish. No sediment or muddy runoff leaving site. BLD permit is still open, no activity since October. ESC permit finaled, no corrections requested.
|
DOC - Permit Finaled | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 | | PASS |
Andy J. Long
|
|
|
Needs landscaping on terrace areas above walls. BLD permit still active. No sediment runoff issues.
|
General Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 | | PASS |
Michael Zawacki
|
|
|
Work looks complete, still needs landscaping.
|
General Inspection | 2/11/2019 | 2/11/2019 | 2/12/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/24/2019 | 1/24/2019 | 1/24/2019 | | PASS |
Michael Zawacki
|
|
|
Work looks complete, site still needs to be landscaped.
|
General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | PASS |
Michael Zawacki
|
|
|
Few small disturbed areas, nothing leaving site.
|
General Inspection | 12/18/2018 | 12/18/2018 | 12/18/2018 | | PASS |
Michael Zawacki
|
|
|
Work on siding installation. Rock wall by RCP done. Lot still needs to be landscaped, everything contained.
|
General Inspection | 11/30/2018 | 11/30/2018 | 12/3/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/6/2018 | 11/6/2018 | 11/6/2018 | | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Most exterior work and rock wall appears complete.
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | | PASS |
Michael Zawacki
|
|
|
Wall complete. Work on porch around home, area still disturbed. No ESC issues.
|
Random Inspection | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Michael Zawacki
|
|
|
Wall work complete, yard still needs to be landscaped.
|
Random Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on foothills home addition. No sediment runoff, trash and materials contained. BMPs on site.
|
BMP Violation | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PEND |
Michael Zawacki
|
|
|
Trackout on road and sidewalk. Talked to Mandy the RP and she will get the contractors to take care of it.
|