Permit Information
Permit NumberESC18-00280
StatusFinaled
Name RHETT COLLINS
Site Address 55 N ALLUMBAUGH ST
Project NameStor-It Allumbaugh
Customer Number 
ePlanReviewNo
Description
Installation of utilities (water & sewer) for new storage complex. Project to begin before irrigation water starts flowing in Ridenbaugh Canal. Will connect utilities from Barrister Street underneath canal. Protect recieving inlets, contain any boring spoils, install silt fence where runoff from disturbed area may flow to canal. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/19/20199/19/20199/19/2019PPASS
DetailsAndy J. Long
see ESC18-01667
General Inspection9/3/20199/3/20199/4/2019 CANC
DetailsAndy J. Long
General Inspection7/18/20197/18/20197/18/2019PPASS
DetailsMichael Zawacki
Fill has been brought in and elevation increased. Silt fence still along perimeter. Washout installed. WIP on a few of the building pads.
BMP Violation6/25/20196/27/20196/27/2019APASS
DetailsMichael Zawacki
Lined washout installed.
General Inspection6/21/20196/25/20196/25/2019PFAIL
DetailsMichael Zawacki
Talked to GC on site. Is digging washout and cleaning up what concrete crew dumped. Scheduled to pour at 10 on 6-26.
Follow up scheduled.
General Inspection6/21/20196/21/20196/21/2019 CANC
DetailsAndy J. Long
General Inspection5/6/20195/6/20195/8/2019 PASS
DetailsMichael Zawacki
Site is now graded and seepage beds installed. Tuffy on site hauling out backfil. Rock entrance installed and sweeper at site.
General Inspection3/21/20193/21/20193/26/2019PPASS
DetailsMichael Zawacki
No building has begun.
Lots of stockpiles on site. Grading area for future layout, able to see where there will be roads and units. No excavation or pad prep has begun.
General Inspection3/5/20193/5/20193/5/2019 PASS
DetailsMichael Zawacki
Perimeter silt fence on site and intact. Tuffy has machines on site, no active work at time of inspection. Water and hydrants installed, future road staked. Nothing leaving site.
Aging Inspection1/18/20191/18/20191/22/2019 FAIL
DetailsMichael Zawacki
Previous correction request not completed.
No SWPPP or permit on site. SIlt fence needs repair, large pile of trash at site.
General Inspection11/14/201811/14/201811/14/2018PPART
DetailsAndy J. Long
Site is currently inactive. No trackout, discharges, or wind blown dust observed. No crews or equipment at site. Utilty and site work is complete, Silt fence perimeter along Ridenbaugh Canal is installed and in tact.

Correction needed:
- pick up and contain loose trash scattered around the site.
- update SWPPP inspection book
General Inspection6/18/20186/18/20186/18/2018APEND
DetailsAndy J. Long
ESC BMPs installed. SWPPP and ESC permit sign posted behind Jack CIty Fitness building.

Water lines are being installed for a proposed 3 building storage complex. No commercial grading or drainage permit issued it appears.

Investigation in prgress. ESC pulled early for installation of water line under canal to the Barrister.