Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberESC18-00430
StatusFinaled
Name NICK BULLEN
Site Address 3722 W ANDERSON ST
Project NameTaft Elementary Addittion
Customer Number 
ePlanReviewNo
Description
Standalone new building of a New gymnasium and classroom addition. Kitchen renovation in existing Multi-purpose Room
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/9/20198/15/20198/15/2019PPASS
DetailsMichael Zawacki
General Inspection8/9/20198/9/20198/9/2019 CANC
DetailsAndy J. Long
General Inspection7/9/20197/9/20197/9/2019PPASS
DetailsAndy J. Long
WIP. Access to gym from Anderson is now paved. No discharges, trackout or other issues observed. Close to completion.
General Inspection6/27/20196/27/20196/27/2019 PASS
DetailsMichael Zawacki
Almost completed. Still needs some landscaping and small areas finished and cleaned up.
General Inspection5/27/20195/27/20195/28/2019 PASS
DetailsAndy J. Long
General Inspection4/25/20194/25/20194/26/2019 PASS
DetailsMichael Zawacki
Driveway paved and sidewalk completed. Still some exposed areas, no ESC issues.
General Inspection3/25/20193/25/20193/25/2019 PASS
DetailsMichael Zawacki
Met with foreman on site. Site is clean, no more issues. Area in field that was used for access will need to be reseeded.
General Inspection2/20/20192/20/20192/27/2019 PASS
DetailsMichael Zawacki
Site is below grade, full of water, and contained. No work activity today. Workers park in turners paved lot.
General Inspection1/16/20191/18/20191/18/2019PPART
DetailsAndy J. Long
Inlet protection installed in storm drain is not adequate.

Site did sweep sidewalk and gutter as requested. Permit sign now posted out front.

Request to install operational sediment filter bag in storm drain.
General Inspection1/16/20191/16/20191/16/2019PFAIL
DetailsAndy J. Long
Corrections needed:
- install sediment protection on the storm drain at the Anderson and State Street exit. No protection installed
- no ESC permit sign posted


No significant trackout, no loose trash, Outpak concrete washouts staged on site.

Verbal correction to Ron Perkins via phone. Follow up scheduled.
Conference12/21/201812/27/201812/27/2018ADONE
DetailsMichael Zawacki
Met with foreman and project manager. Will rebuild front entrance when contractor on site is finished running water line for hydrants.
Has crane coming in to install rooftop units, needs to enter through field, will install fence and clean and repair entrance after that is done, will force everyone to come in front entrance.
Trash was cleaned up, will keep on crews to clean their messes. New washout will be used when time to pour sidewalks. Office is going to reestablish NOI coverage, need to keep narrative on site, only maps available.
General Inspection12/13/201812/14/201812/21/2018AFAIL
DetailsMichael Zawacki
No stabalized entrances, no lined washout, lots of loose trash. Never have seen anyone at job trailer. No peermit displayed, unable to find any ESC information. LEW expired. Thursday meeting at 9:00
General Inspection12/12/201812/12/201812/12/2018PFAIL
DetailsMichael Zawacki
Site is thawing and muddy. Two entrances into site, neither have stabalized entrance. Muddy road through field runs to 38th, other to Anderson.
General Inspection10/26/201810/29/201810/31/2018PFAIL
DetailsMichael Zawacki
Lots of styrofoam and plastic laying around site. Mortar mixer has no secondary containment, mortar all over the ground. Washout has no liner, just a pit.
No one in job trailer.