Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberESC18-00462
StatusFinaled
Name MARTY PIERONI
Site Address 925 W HIGHLAND VIEW DR
Project NameZarse Home Remodel
Customer Number 
ePlanReviewNo
Description
per attached conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/25/20194/25/20194/26/2019 PASS
DetailsAndy J. Long
Construction appears complete. BLD is still open. Disturbed area stabilized and landscaped. Temporary BMPs (wattles) have been removed. ESC permit finaled.
DOC - Permit Finaled4/26/20194/26/20194/26/2019PPASS
DetailsAndy J. Long
General Inspection4/10/20194/10/20194/10/2019 CANC
DetailsAndy J. Long
General Inspection3/22/20193/22/20193/22/2019 PASS
DetailsMichael Zawacki
Driveway completed. Part of old wall has failed, no dirt or runoff from breach.
General Inspection3/7/20193/7/20193/7/2019 FAIL
DetailsMichael Zawacki
Some runoff in gutter. ph tested at 12.1, left message with RP.
General Inspection2/15/20192/15/20192/15/2019 PASS
DetailsAndy J. Long
General Inspection1/30/20191/30/20191/30/2019 PASS
DetailsAndy J. Long
General Inspection12/25/201812/25/201812/26/2018 PASS
DetailsMichael Zawacki
Rock wall completed, BMPs in place. Small pile of uncontained backfill on driveway.
BMP Violation9/27/20189/28/20189/28/2018APASS
DetailsAndy J. Long
Gutter was swept as requested. GC Jeff called to state that his son will become a certified RP to be the contact for both the Sherman and Highland View site.
BMP Violation9/26/20189/27/20189/27/2018APEND
DetailsAndy J. Long
invalid RP for site; follow up on corrections.

GC to have counterpart/son become RP for this project and on Sherman. Follow inspection at site is tomorrow AM.
BMP Violation9/24/20189/25/20189/26/2018AFAIL
DetailsAndy J. Long
check that gutter has been swept.

No clean up complete. No permit sign, no BMPs. Invalid RP listed.

Contractor needs to have own certified RP, must sign up ASAP or site will be cited for multiple violations.
Random Inspection9/24/20189/24/20189/24/2018AFAIL
DetailsAndy J. Long
Dirt and debris in gutter from recent installation of rock wall.

Correction request to clean up gutter and road shoulder ASAP issued to Marty.

Follow up scheduled for tomorrow PM