Site Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Andy J. Long
|
|
|
send email to Mark to verify permit is closed
Temporary BMP storm drain sediment bag on Targee has been removed as requested. ESC permit finaled. Okay for BLD final when requested.
|
Aging Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | FAIL |
Andy J. Long
|
|
|
project complete and stabilzed. Did not removed the temporary DI bag. Request sent to GC and excavator.
|
Site Final | 8/29/2019 | 8/29/2019 | 8/30/2019 | P | NR |
Andy J. Long
|
|
|
|
Site Final | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | NR |
Michael Zawacki
|
|
|
DI bags still not removed, already notified GC.
|
Site Final | 6/21/2019 | 6/25/2019 | 6/25/2019 | P | NR |
Michael Zawacki
|
|
|
DI bag on Targee @ Eagleson not removed. Message sent to GC
|
Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed, still needs landscaping.
|
General Inspection | 8/21/2018 | 8/23/2018 | 8/24/2018 | A | PASS |
Andy J. Long
|
|
|
follow up inspection
Corrections complete:
- sidewalk and gutter were swept. Most loose dirt was removed. - DI bag installed for sediment protection on the receiving storm drain.
|
BMP Violation | 8/17/2018 | 8/20/2018 | 8/21/2018 | A | FAIL |
Andy J. Long
|
|
|
No clean up performed.
Verbal correction to RP to: -sweep gutter and sidewalk - install sediment protection on storm drain just west of site at Stop sign.
RP John stated they will do it tomorrow. Follow up scheduled for Thursday PM.
|
BMP Violation | 8/15/2018 | 8/16/2018 | 8/17/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Andy J. Long
|
|
|
Corrections needed:
- sweep up street, gutter and sidewalk in front of site - clean up concrete slurry (dried) in the gutter - install sediment protection on receiving storm drain just west of site
|