Permit Information
Permit NumberESC18-01005
StatusFinaled
Name CRAIG D FISCHER
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
walk way
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/27/20201/27/20201/27/2020PPASS
DetailsAndy J. Long
Project complete. No ESC requests. Stormwater management to be monitored by Micron environmental compliance team.
General Inspection12/16/201912/16/201912/16/2019 CANC
DetailsMichael Zawacki
General Inspection10/14/201910/14/201910/14/2019 FAIL
DetailsAndy J. Long
WIP on pathway along Federal Way.

Concrete washout pan is leaking all the liquid waste out onto the ground. Appears to be a pan malfunction.

Clean up and replacement is requested. Notified Warner RP Craig.
Conference8/13/20198/13/20198/13/2019PDONE
DetailsAndy J. Long
Section of walkway adjacent to B37 is covered under this permit. B37 ESC permit is already closed and building is occupied, disturbed area stabilized.
General Inspection7/24/20198/6/20198/7/2019APASS
DetailsAndy J. Long
9 AM Micron Campus inspection

see also detailed Micron Inspection report for August 6, 2019.

- updated SWPPP binders and site maps; weekly site inspections; permit info posted
- designated construction access route and track-out control
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- large capacity lined concrete washout containment pit
- covered trash dumpsters/material separation
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks on duty to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, SWPPP record keeping is satisfactory. No correction requests at this time, Micron projects are currently in compliance.

Walkway project still open
Aging Inspection7/23/20197/23/20197/24/2019 PEND
DetailsAndy J. Long
to be rescheduled for inspection of all Micron campus ESC permits. Email sent to environmental compliance division.
General Inspection5/23/20195/23/20195/23/2019 CANC
DetailsAndy J. Long
to be rescheduled for June Micron inspection.
General Inspection10/2/201810/4/201810/4/2018APASS
DetailsAndy J. Long
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.