Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberESC18-01237
StatusFinaled
Name SHELBY STROEBEL
Site Address 1812 N MOCKBEE PL
Project Name20-1 Sherman Hollow
Customer Number 
ePlanReviewNo
Description
per attached conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/19/20198/29/20198/29/2019PPASS
DetailsMichael Zawacki
General Inspection8/16/20198/16/20198/19/2019 PASS
DetailsAndy J. Long
Home near completion. Grass where concrete washout was dumped and spilled is brown and not growing well. No discharges or material leaving site. Will follow up for site final next week.
General Inspection7/31/20197/31/20198/1/2019 PASS
DetailsMichael Zawacki
Home exterior looks completed. Landscapers have just begun, no issues.
General Inspection7/16/20197/16/20197/16/2019 PASS
DetailsMichael Zawacki
Silt fence has been repaired protecting neighboring lot. Lots of stucco fallen around site. No problems with loose or blowing trash.
General Inspection6/20/20196/21/20196/21/2019PPEND
DetailsAndy J. Long
trash was emptied, washout residue and dried slurry still on site.
BMP Violation6/20/20196/20/20196/20/2019PFAIL
DetailsAndy J. Long
Overflowing trash containment. Uncontained concrete washout dumped next to trash container, debris and slurry on sidewalk.

Correction requests:
- empty trash containment
- clean up sidewalk
- clean up piles of dumped material and remove contaminated soil
General Inspection5/30/20195/30/20195/30/2019PPART
DetailsMichael Zawacki
Correction sent to RP.
Silt fence in front needs sediment cleaned out, rear right needs repairs. Trash all in box, wood scraps in pile next to box. No dirt leaving site at time of inspection.
General Inspection4/9/20194/9/20194/9/2019PPART
DetailsMichael Zawacki
Sidewalk and street in front of lot can be swept a bit better.
Tracking Control3/28/20193/29/20193/29/2019APASS
DetailsAndy J. Long
Trackout cleaned up. Will need to reinstall perimeter wattles and protect downhill home.
Complaint Inspection3/27/20193/28/20193/28/2019AFAIL
DetailsAndy J. Long
Extreme trackout and muddy sidewalk, perimeter controls damanged, no stabilized access.

Verbal correction request to clean up and repair BMPs to Canyon Crest RP Dave. Follow up scheduled.
Site Preparation3/13/20193/14/20193/14/2019APASS
DetailsMichael Zawacki
Silt fence installed on downhill perimeter, gator guard along sidewalk. Load of pitrun delivered, some is on sidewalk.
Work not scheduled to begin until monday, will need washout before pour.