Permit Information
Permit NumberESC18-01597
StatusFinaled
Name MATT WRIGHT
Site Address 3545 E VIA ESTANCIA LN
Project Name 
Customer Number 
ePlanReviewNo
Description
New foothills zone SFH. Install perimeter sediment control wattle on downhill per ESC plan. Construction entrance to prevent trackout is required. Concrete washout containment is required. Schedule Site Preparation inspection prior to earthwork.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/18/201910/18/201910/21/2019PPASS
DetailsMichael Zawacki
DOC - Permit Finaled10/21/201910/21/201910/21/2019PPASS
DetailsMichael Zawacki
General Inspection10/18/201910/18/201910/18/2019 CANC
DetailsAndy J. Long
General Inspection9/26/20199/26/20199/26/2019PPASS
DetailsMichael Zawacki
Exterior complete and lot landscaped. Workers in ninterior.
General Inspection7/15/20197/16/20197/16/2019PPASS
DetailsAndy J. Long
Frame is built, construction entrance installed. No trackout or discharges.Washout was used, but is now dry and full, but currently not in use.
General Inspection6/5/20196/5/20196/5/2019PPASS
DetailsMichael Zawacki
Some wood scraps and waster from builders throwing cut ends off roof. No major ESC issues.
General Inspection4/30/20194/30/20194/30/2019PPASS
DetailsMichael Zawacki
WIP on framing. Concrete washout damaged when backfill removed, will need to be rebuilt or repaired. Site is clean, no ESC issues.
BMP Violation3/28/20193/29/20194/2/2019APASS
DetailsMichael Zawacki
Large washout constructed and used.
General Inspection3/19/20193/26/20193/26/2019PPEND
DetailsAndy J. Long
follow up

corrections not completed. No new issues. Subdvision landscaping using stockpile and causing minor trackout from stockpile.
Random Inspection3/19/20193/19/20193/19/2019PFAIL
DetailsAndy J. Long
No concrete washout containment set up.

Dumped on stockpile, then dumped again on by neighboring project's pool.

Warning and request to clean up ASAP. Follow up scheduled.
General Inspection2/7/20192/15/20192/15/2019APASS
DetailsMichael Zawacki
Excavation for home has begun, no concrete work. Lot is contained, backfill stored on parcel. No trackout.
General Inspection2/14/20192/14/20192/15/2019PCANC
DetailsMichael Zawacki
Site Preparation2/5/20192/7/20192/7/2019APASS
DetailsAndy J. Long
10 AM Lance 6311356

Site walk through with GC Lance and RP Matt with Beus Excavation. Preconstruction meeting. Permit sign posted, RP will coordinate with Jeff Wright Privada RP as well. Receiving storm drains have sediment protection installed.

RP to install sediment control wattle on the east perimeter above the landscaped entrance. Trench and stake every 4-5 ft requested.
RP to park trash trailer at front of site. Rock entrance is installed, request for more rock to be added. Have employees park on street not open lots.

Approved for construction. Follow up scheduled.